Fwd: Pending Issues of Sugam Sabuj

3 views
Skip to first unread message

Sanjiv Varma

unread,
Jul 5, 2021, 4:42:19 AM7/5/21
to Sugamsabujparibar


---------- Forwarded message ---------
From: Sanjiv Varma <sanjiv...@gmail.com>
Date: Mon, Jul 5, 2021 at 2:02 PM
Subject: Pending Issues of Sugam Sabuj
To: <asks...@yahoo.co.uk>


it may be very convenient to ignore so that you can save some expenses, but it will soon enough prove too costly to resolve. 

From: Arup Kumar Hazra <akha...@gmail.com>
Date: Fri, Jul 2, 2021 at 12:01 PM
Subject: Non-Compliance of our requests relates to different issues in Sugam Sabuj Housing Complex since 2014
To: <asks...@yahoo.co.uk>, <sa...@sugamhomes.com>, Shirsendu Sengupta <shir...@gmail.com>, bipradas samaddar <bsama...@gmail.com>, Sugamsabujparibar <sugamsab...@googlegroups.com>, <officesu...@gmail.com>


Sugam Griha Nirman Pvt Ltd.

Sukh Sagar,

2/5, Sarat Bose Road, Unit 1F

Kolkata – 700 020.

 

Kind Attention: Mr. Ashok Saraf. 

 

Sirs,

We are extremely perturbed and sorry to draw your attention to the following for your kind perusal and to take necessary appropriate steps to redress the same at the earliest to maintain a congenial relation between the developer and Sugam Sabuj Apartment owner’s Association (SSAOA), some of which are pending since 2014, after the handover from Sugam Homes to SSAOA (REGD NO. 4A OF 2015). 

We had visited your office several times and submitted all the relevant documents and requested Mr. Harlalka to redress the same, but no positive action has yet been taken from your end. We would once again request you to please take appropriate steps in resolving the following: - 

Sr No

Short Description

Pending Since

Amount

1

The balance maintenance amount collected by the Sugam Homes, during the period 2013 from the Residents of Sugam Sabuj prior to handover the management to SSAOA on and from 01.01.2014.

 

01.01.2014

 

7, 04, 817.80 (approx.)

2.

Important documents & necessary drawings relates to the following:

CIVIL Drawings:

·         Print out of the Layout plan of the entire complex in proper scale / in PDF format. CAD map is more suitable for future modifications and up-gradation.

  • Elevation Plan, Reinforcement details of each and every Flat, Garage, Community Hall etc.
  • Layout drawings of  the Underground Pipe lines for: 

i)     The Sanitary, Sewerage, Drainage & Storm Water Systems.

ii)    Submersible Pump Sets including its allied pipeline layouts for distribution of Drinking Water from Reservoir to all the individual flats through overhead tanks.

iii)   Schematic diagram for STP system.

ELECTRICAL DRAWINGS:

i)     Total Electrical Distribution for each & every Flats of the Complex including the Service connections.

ii)     The Electrical Distribution system from Substation to the Pillar Boxes incl. different Buildings' Meter Rooms to individual flats.

iii)   Detail Distribution wiring for the Two (2 Nos.) DG sets & its layout plans.

iv)   Detail Earthing arrangements for each & every buildings including the layout diagram of the Lighting Arrester Systems in Block B & F.

v)    Detail Compound Lighting arrangement systems.

01.01.2014

 

3.

Refund of one year maintenance charges for the period 01.06.2016 to 31.05.2017 for the Flat No. G/3C, received from Mr. Ayanendra Hazra, at the time of issue of the possession letter. 

 

01.06.2016

 

19, 350

4.

As per the agreement between the Sugam Griha Nirman Limited and Sugam Sabuj Apartment Owners' Association (SSAOA) dated 10th February 2018. There has to be a 10 (Ten) years Guarantee on the stamp paper from the contractor (PREMIER CUBE PVT LTD) to repair at their own cost for any damages against the rooftop works that they have done for the Block Nos. A, B, D, E & G.

 

01.10.2019

 

5.

Pay back the overpaid amount made by SSAOA to PREMIER CUBE PVT LTD. This amount was paid in excess during the execution of the rooftop works.

 

01.10.2019

 

₹ 76, 304.06

6.

No approach road for the residents of Sugam Sabuj for 156 number of flats.

01.01.2014

 

 

We are forwarding all the relevant documents (photocopies received by your designates). Please go through the attached files for doing the needful. We need to resolve these at the earliest. 

 

Thank you and solicit your early action please.

 

Sincerely yours,

Arup Kumar Hazra,

President (SSAOA).

(M) 9433115609.


Best Regards
(Sanjiv Varma)


--

Best Regards
(Sanjiv Varma)