In dive planner interface, there are two SAC options: bottom SAC and deco SAC. When planning for CCR bailout, only the deco SAC value is applied, including the bottom problem solving phase and the ascent phase to the 1st deco switch.
Is there a way to have the bottom phase adopt the bottom SAC value instead, which allows me to use a higher SAC?