Tam, Bob, everybody,
I was into coding a bayesian support vector machine (bSVM) in STAN. In their dual form
in common to use lagrange multiplier to cope with the inequality condition.
I looked in the group here and thought maybe somebody else know how to handle
contraints. I found:
So I tried to make it very simple and put the lagrange example in the STAN optimizer.
You all right. I doesn't makes sense.
Just for informational background:
I have had the idea to use STAN as an Bayesian optimizer.
Currently we do optimizing like an optimizing tunnel.
We pick on point, optimize and get one result.
We do that repeatedly. At the end of the other side
we get a 'picture'.
But what, if we could transmit whole distributions
through the "tunnel"?
Our solver have constraints. So how could I had constraints
to STAN. Thus I come up with the Lagrange multiplier idea.
To make it more practical, in the company I worked before,
we had a simulation of the factory. We did a simulation,
picked one state out of the simulation process, optimized
that. Repeated that n-times and then at the end we
reviewed the optimized points.
Andre