Hi,
I have a problem where LOO and WAIC are giving very different estimates of the expected log pointwise predictive density (elpd). In particular, I get estimates of elpd from LOO-CV that have an absolute value of about an order of magnitude of smaller that that from WAIC; both in terms of point estimates, and the standard errors. I am used to a little difference in these estimates, but not an order of magnitude.
I do get a warning message from the loo package when I estimate LOO-CV on the log-likelihood matrix, that says the following:
Warning messages:
1: 332 (14.1%) Pareto k estimates between 0.5 and 1
2: 241 (10.3%) Pareto k estimates greater than 1
I have got these type of messages before, and usually I have ignored them because the latter percentage is small, (and usually the first is small as well.)
My question is, which of these metrics should I trust? I am guessing that I should use WAIC, because it involves less approximation, but I wanted to check.
Best,
Ben