Obviously the mere dimensionality of a problem doesn't fully determine the speed of convergence of a MCMC. The correlation between the variables, the complexity of the model, etc all play important roles.
That said, I'm trying to get a sense of the order of magnitude of the size of problems that have a chance to be tackled.
Is it sensible to use Stan on a model with hundreds of parameters? Tens of thousands? Millions?
Some of the default behaviors of cmdstan (such as printing each parameter for each sample) suggest that the typical models have at most dozens of parameters. Is that so?
Thanks,
Arthur
Hi Richard,
What do you mean by the above? What do you increment the log posterior with when you say "estimate as missing"?
Luc
What do you mean by the above? What do you increment the log posterior with when you say "estimate as missing"?