Bheeramguda Kaman to Rainbow Intl School - Patchy Road

3 views
Skip to first unread message

Ravi Kiran

unread,
Jul 24, 2013, 6:38:23 AM7/24/13
to SSymp...@googlegroups.com

It has became a nightmare for me to cross Bheeramguda Kam till Rainbow International School road on Sunday evening and it is in real danger.
  • Due to rains from last two weeks, this road is damaged to a greater extent with lot of pits, water clogging.
  • Many tippers/heavy load vehicles flee on this road which makes most of the damage.
  • Traffic on this road is increasing day by day as it connects to ORR

Anyone has thoughts how this road could be renewed for smooth commutation to Symphony Park Homes

Rakesh Reddy

unread,
Jul 24, 2013, 8:07:56 AM7/24/13
to Ravi Kiran, SSymp...@googlegroups.com
We need to push the builder to speak to GHMC authority, as SSPH is GHMC approved.
If the road is not widened & renewed post rainy season, it would be very difficult to commute :-(


--
You received this message because you are subscribed to the Google Groups "Safeway Symphony Park Homes" group.
To unsubscribe from this group and stop receiving emails from it, send an email to SSymphonyPH...@googlegroups.com.
To post to this group, send email to SSymp...@googlegroups.com.
Visit this group at http://groups.google.com/group/SSymphonyPH.
To view this discussion on the web visit https://groups.google.com/d/msgid/SSymphonyPH/bf080a9b-933a-4127-89aa-05201f0311a7%40googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 



--
With Regards,
G.Rakesh Reddy

santhosh.kumar1981

unread,
Jul 24, 2013, 9:11:01 AM7/24/13
to SSymp...@googlegroups.com, Ravi Kiran
Hello Ravi,

Is that road Gram panchayat under.
It was RR eariler which is cancelled.But the sales people say that its approved and all.
at least after 2 years when we get the position if that rd is built then we can atleast travel on that if not its horrible and very dangerous.
Yes we can ask the builder Mr Wilson who was DRO ( joint collector) earlier Medak I guess.
We can speak to him directly.

Thanks, santhosh

Borra Madhukar

unread,
Aug 18, 2013, 3:16:17 AM8/18/13
to SSymp...@googlegroups.com
On Wednesday, July 24, 2013 4:08:23 PM UTC+5:30, Ravi Kiran wrote:
> It has became a nightmare for me to cross Bheeramguda Kam till Rainbow International School road on Sunday evening and it is in real danger.
> Due to rains from last two weeks, this road is damaged to a greater extent with lot of pits, water clogging.
> Many tippers/heavy load vehicles flee on this road which makes most of the damage.Traffic on this road is increasing day by day as it connects to ORR

>
>
> Anyone has thoughts how this road could be renewed for smooth commutation to Symphony Park Homes

Its still worst...Safeway executives are saying that they also released some funds to get this road repaired