The purpose of this note is to inform you of a recent development relating to the Gelman Sciences site.
On November 15, in response to a scheduling order from the Washtenaw County Circuit Court (Court), a “Notice of Tentative Agreement on Proposed Modifications to Remedial Objectives for Gelman Site” (Tentative Agreement) was filed with the Court. A hearing is currently scheduled for 3 PM on November 24; however, that date is subject to change (the Court's calendar currently indicates the hearing will be at 1:30 PM; please check the web site to confirm the time: http://washtenawtrialcourt.org/calendar/DES).
The Tentative Agreement that was filed with the Court, including attachments, is available at the following link:
The proposed modifications to the remedial objectives will require modification of the 1992 Consent Judgment between the parties, which is to be submitted to the Court on December 15. Any issues that cannot be resolved during the drafting of the Consent Judgment modifications will be submitted to and decided by the Court.
The Department of Natural Resources and Environment (DNRE) is preparing an Information Bulletin and is planning a public meeting to explain the modifications. A date for the public meeting has not been set, but will be announced in December, and will probably be held in January 2011.
Following is a summary of the proposed modifications. Applicable law allows Gelman to propose such modifications and requires the DNRE to approve the changes if they comply with the requirements of the law. Modifications require the Court’s approval in this case under the terms of the existing Consent Judgment. Additional details are included in the Tentative Agreement and will also be provided at the DNRE’s public meeting and in the forthcoming DNRE Information Bulletin.
Pall Life Sciences (PLS) is currently required to remediate all 1,4-dioxane groundwater contamination west of Wagner Road and in the Evergreen Subdivision area to the current cleanup criterion of 85 parts per billion. Interim responses are ongoing in the Unit E plume at Wagner Road and south of the Evergreen Subdivision, as required by the Unit E Order.
Eastern Area (east of Wagner Road) - The modifications would expand the Prohibition Zone (established by Court order, May 2005) into the Evergreen Subdivision area. Extraction will be required in the Evergreen Subdivision area until DNRE approves termination. PLS will be required to monitor the groundwater contamination to ensure that any potential migration outside of the Prohibition Zone above applicable criteria is detected before such migration occurs. The state and PLS agree that this is unlikely. If monitoring detects the potential for migration outside of the expanded Prohibition Zone boundary, PLS is required to implement a DNRE-approved investigation and feasibility study to determine if additional response actions are necessary, and to implement those actions.
Western Area (west of Wagner Road) - The requirement to remediate all groundwater contamination would be removed (except for the plume northwest of Little Lake); however, PLS would be required to continue groundwater extraction until it can be demonstrated that the plume would not expand after extraction is terminated. Upon DNRE’s concurrence that extraction is no longer necessary to contain any remaining contamination, PLS would be required to obtain deed restrictions (with the permission of the property owners) before receiving DNRE approval to terminate extraction.
Long-term monitoring will be required in both areas once the interim responses are complete.
Sybil Kolon
Senior Environmental Quality Analyst
Remediation Division
Department of Natural Resources and Environment
301
E. Louis Glick Hwy.
Jackson, MI
49201
phone:
517-780-7937
fax:
517-780-7855
e-mail: kol...@michigan.gov