You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to SWAT+ Toolbox
Hey.
I was wondering if calibrating the model only at the main watershed outlet is generally sufficient, or if there are cases where multisite calibration (for example, including upstream gauges) is recommended.
More specifically, are there any practical criteria you use to decide when adding upstream gauges is necessary