Hi,
I have tried following the user guides about assigning a Resource element to an Activity (step) in a BPMN workflow.
The guides show the ability to select a resource, using a tick-box in the Resource panel of the BP Configuration window.
However, my question is: how does the Resource panel get populated by Resources that can then be assigned to an Activity? I.e. how do I specify the Resources and make them selectable in the first place? I have tried creating and stereotyping a resource artefact, but it does not appear in the resource panel for my activity even though it's in the same (BPSim'd) package.
I'm currently running the latest version of Sparx EA 'Ultimate'.
Thank you.
Robin.