DEAR SE DISTRICT WORKING GROUP At their meeting last night, the Streetcar Advisory Committee was very supportive of the SE District Working group Report and Recommendations for Connectors. Darrick Wong, Bob Richardson and I presented the report and heard from Mayor Adams about the importance of this plan and appreciation for our work. The SAC Requested a further specific Southeast DWG recommendation on Corridor Priorities, for their meeting Thursday afternoon. SEE ATTACHED RANKING BELOW. IF YOU HAVE COMMENTS OR CONCERNS ON THIS RANKING, PLEASE RESPOND TO richar...@earthlink.net by 6 pm Today, Wednesday. I apologize for the short notice, but we want to respond to their request. We hope the SAC will support all the Connector Recommendations in the developing plan. While the Report ( Pros and Cons section) rates in High, Medium and Low Priority "Assessment of Community Support" and the Survey Results, the SAC also wants a clear DWG recommendation of our own priorities. Your three representatives developed the following proposed list of SE District Working Group Working Group based on the Report and all of the deliberations of the working group. The Recommendation endorses the Connector versions of all SE corridors, to be consistent with our Report. Consistent with the Report the Recommendation proposes a logical priority sequence of Streetcar system development for a 30 year Network in SE, based on the principle building a connected system. Yours Richard Ross, SE Streetcar DWG, Facilitator ----------------------------------------------------------------------------------------------------------------
Jan 15 2008
DRAFT To Streetcar Advisory Committee From SE District
Working Group, Richard Ross, Facilitator Re: RECOMMENDED
PRIORITIES OF SE STREETCAR CORRIDORS The SE Streetcar
District Working Group Report recommends the Following Streetcar System Concept
and Priority based on the DWG’s Pro and
Con analysis. SECTION 4.2 of the
Report ADDENDUM 4.2 Recommended
Southeast Streetcar System Concept The Southeast District Working Group recommends a complete,
continuous, and multi-directional streetcar network in Southeast
Portland that supports the continued growth of vital Southeast
communities. The Southeast System Plan
should: ·
Include
all ten of the “Remaining Corridors” shown on the March 25, 2008 map. ·
Provide
superior transit access between Southeast, Central Portland,
the rest of Portland and
neighboring communities. ·
Consider
energy-efficient trolley busses, enhanced bus service and bus rapid transit,
integrated with a streetcar system, on any Southeast corridors where these
modes more feasible. ·
Develop a
more efficient and seamless transit system for riders, not just add another
mode. ·
Develop a streetcar system, including fare and
service structure, which supports the Comprehensive Plan’s proposed “20 Minute Neighborhood” principle. The System Plan should define a phased network, connected initially from current and planned
Light Rail or streetcar corridors: For Example a 10-year, 20 year, and 30 year
System. This provides certainty for communities, financial plans, and the
ultimate outcome of an integrated transit system. A 30 Year Network should include all Remaining Corridors (3-25-08 Draft Streetcar System Plan Map): DISTRICT WORKING GROUP SYSTEM PRIORITIES (Listed in
alphabetical order in each category) A. HIGH PRIORITY
( YEARS 1-10) 1. BELMONT STARK WASHINGTON with Hawthorne Bridge
Connector and North Mt Tabor Connector 2. HAWTHORNE/50TH FOSTER
with Hawthorne Bridge
Connector 3. 39th AVE
CROSSTOWN CONNECTOR Woodstock
to Columbia Blvd Enhanced Transit and
Medium Capacity Vehicles ( may not be Streetcar) B. MEDIUM PRIORITY (
YEARS 11-20 1. 82nd Ave Cross Town Connector 2. MILWAUKIE-TACOMA with
Connectors to Eastside/MLK Streetcars, and Sellwood
Bridge to Lake
Oswego Trolley 3. SANDY BLVD 4. WOODSTOCK with
Connector to Bybee MAX station, Milwaukie
Ave Streetcar C. LOW PRIORITY ( YEARS 21-30)
1. BURNSIDE/28/GLISAN 2. BURNSIDE/STARK-WASHINGTON
3.POWELL ( East of
50th)
---------------------------------------------------------------------------------------------------------------------
Thursday, January 15
2:30-5:30 PM
Lloyd Center Tower, Multnomah Room
825 NE Multnomah
The SAC will meet to discuss DWG recommendations and make their final recommendations to the Streetcar System Plan. This meeting is scheduled for three hours to accommodate discussion but may end early.
Richard N. Ross, AICP 2041 SE Elliott Ave. Portland, Or. 97214 H 503-235-8194 C: 503-807-0612 Fax: 503-235-8194