-----Original Message-----
From: Paul Niedergang
Sent: Jun 24, 2008 7:17 AM
To: southeastp...@googlegroups.com, tjo...@koin.com, xathr...@yahoo.com, pac...@gmail.com, gog...@metro.dst.or.us, fra...@comcast.net, david...@yahoo.com, amand...@gmail.com, ltip...@teleport.com, robi...@hotmail.com, mikesmit...@gmail.com, hag...@gmail.com, djw...@djwong.org, pa...@progresspdx.com, cg...@mac.com, christi...@comcast.net, stah...@gmail.com, davidal...@gmail.com, patrick...@trans.ci.portland.or.us, gou...@yahoo.com, wnich...@netscape.net, dpo...@fire.ci.portland.or.us, tat...@msn.com, jcr...@runbox.com, kand...@ci.portland.or.us, meagan...@yahoo.com, mmeb...@spiritone.com, richar...@earthlink.net
Subject: Need outline for Corridor AssessmentI am in the process of drafting the Corridor Assessment for Hawthorne and was hoping that the meeting notes would be out from last weeks meeting. I don't have good notes on what needs to be included in the assessment and am wondering if anyone else has notes on this. All I really need is an outline of what needs to be covered.
Please reply all so others will know that someone has responded.
Thanks,
Paul Niedergang----- Original Message ----
From: "richar...@earthlink.net" <richar...@earthlink.net>
To: southeastp...@googlegroups.com; tjo...@koin.com; xathr...@yahoo.com; pac...@gmail.com; gog...@metro.dst.or.us; fra...@comcast.net; david...@yahoo.com; amand...@gmail.com; ltip...@teleport.com; robi...@hotmail.com; mikesmit...@gmail.com; hag...@gmail.com; djw...@djwong.org; pa...@progresspdx.com; cg...@mac.com; christi...@comcast.net; stah...@gmail.com; davidal...@gmail.com; patrick...@trans.ci.portland.or.us; gou...@yahoo.com; wnich...@netscape.net; dpo...@fire.ci.portland.or.us; tat...@msn.com; jcr...@runbox.com; kand...@ci.portland.or.us; meagan...@yahoo.com; mmeb...@spiritone.com
Sent: Thursday, June 19, 2008 9:46:13 AM
Subject: SEE POSTINGS PDOT Streetcar Car Updated Timeline 6-16-08, Tri-Met Spring 08 Ridership Report
TO; SE STREETCAR PLAN WORKING GROUP
PLEASE CHECK NEW FILES AT http://groups.google.com/group/southeastpdxstreetcar?hl=enf
1. PDOT STREETCAR PLAN UPDATED TIMELINE 6-16-08: EXPANDS INVOLVEMENT OF COMMUNITY GROUPS JUNE-OCTOBER 08
2. TRI MET SPRING 08 RIDERSHIP REPORT: AVG WEEKDAY BOARDING RIDES ON BUS LINES IN STREETCAR CORRIDORS
IF YOU ARE NOT SIGNED UP FOR THE GOOGLE GROUP PLEASE DO SO NOW.THE GOOGLE GROUP WILL BE A PRIMARY MEANS TO COMPILE THE WORKING GROUP REPORT TO THE STREETCAR ADVISORY COMMITTEE.
AGENDAStreetcar Master Plan, SE Working Group June 19, July 2 and 17
SE UPLIFT 3534 SE Main at 7-9PM
JUNE 19 2008
1. Review process to develop Final Report
2. Preliminary Scoring of all Corridors
- SeeWorkbook Pages 27 #1-2, 43 #1-6 and page 50
- Record +/- Factors for all Corridors
3. Assign subcommittee to Draft Overview
HOMEWORK Draft Corridor Summaries and Overview by July 2
JUNE 25, 2008 5:30-8:30 PM Streetcar Advisory Committee
Working Groups preliminary report METRO Room 370
SE Group report 8:00-8:30 PM
JULY 2, 2008
- Review and Adopt Corridor Summaries and Overview
- HOMEWORK Edit Final Report
JULY 17, 2008
- Review Final Report for Transmittal to Streetcar Working Group
- Assign Roles for Final Report to Streetcar Advisory Committee July 23 and
Work with Neighborhood/Business Groups Aug-Sept
July 23 2008 5:30-8:30 PM Streetcar Advisory Committee
Working Groups final report METRO Room 370
FINAL REPORT CONTENT AND ASSIGNMENTS
1. OVERVIEW: 2-3 pages Executive Summary, Introduction, and Conclusions
Drafted by subcommittee with Richard Ross
2. CORRIDOR SUMMARIES 1-3 Pages per corridor
Summary, +/- Factors , Corridor Description, Survey/Interview results, Statistics
DRAFTED BY: Corridor Groups and leaders
3. Attachments to Corridor Summaries ( Letters, charts, etc)
DRAFTED BY: Corridor Groups and leaders
3. Compile and Organize All Photo Sets on Google Group
BY: ???
4. APPENDIX( Not published):
- File Copy of surveys and interviews
- Paper Copy of all Photo Sets
BY: Corridor Groups and leaders
-------------------------------------------------------------------------------------------------------------------------
WORKING GROUP INFORMATIONAnyone who attends is a member of the Working Group. We need more participants from all over Southeast, to review the 10 proposed corridors in Southeast for public support, from Sandy to Woodstock and from Milwaukie Ave to 82nd Ave.
You can find details of the Streetcar Master Plan, Workbook for the group, and maps at the PDOT Website
http://www.portlandonline.com/transportation/index.cfm?c=46137&a=191202
Or you can pick up the Streetcar Workbook at SE Uplift, 9AM-3 Mon-Thursday.
Richard N. Ross, Southeast resident and planner, is the Working Group's volunteer facilitator.
All communications from the Working Group are posted at Google Groups "Streetcar System Plan SE Working Group" group.
Please sign up to receive meeting notes and work group documents:
http://groups.google.com/group/southeastpdxstreetcar?hl=en
To post to this group, send email to <southeastp...@googlegroups.com>
SE WORKING GROUP CORRIDOR ASSIGNMENTS
* Lead for Corridor Assessment
a. SANDY * David Amiton, Brendan Haggerty
b. BURNSIDE/28/GLISAN *Goudarz Eghtedari
c. BURNSIDE/STARK-WASHINGTON * Darrick Wong, Amanda Keppeler
d. BELMONT * Mike Smith Lonergan, Don Porth, Amanda Keppeler
e. HAWTHORNE/50TH * Paul Neidergang, Robin Smith, Bob Richardson,Peter Cowan
f. POWELL *Nelly Korn,Tim Joyce
g. FOSTER * Christian Smith, Peter Cowan, Bob Richardson, Walt Nichols
h. WOODSTOCK * Randall Magahay Rod Daggett 39TH Nelly Korn
i. MILWAUKIE-TACOMA *Tim Joyce
j. SE 82nd AVENUE (DROPPED) Nellie KornRichard N. Ross, AICP
2041 SE Elliott Ave.
Portland, Or. 97214
H 503-235-8194 C: 503-807-0612 Fax: 503-235-8194
Richard N. Ross, AICP 2041 SE Elliott Ave. Portland, Or. 97214 H 503-235-8194 C: 503-807-0612 Fax: 503-235-8194