IN-2024 BURJ AL ARAB - INFORMATION SERIES VOL-19

0 views
Skip to first unread message

krishna rao khanapur

unread,
Oct 1, 2025, 1:21:30 AM (2 days ago) Oct 1
to society4servingseniors, Sudhakarbabu Kambhampati, m.n. gupta, VAIJAYANTHI, R N Mital, SSS Ramarao Buddha Andhra Bank Retd
IN-2024.
BURJ AL ARAB  OF INFORMATION SERIES VOLUME-19 IS GIVEN BELOW.
CLICK ON IT TO OPEN THE E-BOOK.

Design and construction

 

The Burj Al Arab was designed by the British multidisciplinary consultancy Atkins, led by architect Tom Wright of WKA. He came up with the iconic design and signature translucent fiberglass facade that serves as a shield from the desert sun during the day and as a screen for illumination at night. The design was managed by Canadian engineer Rick Gregory, and construction was managed by David Kirby also of WS Atkins. The Burj Al Arab's interior is by British-Chinese designer Khuan Chew. Construction of the island began in 1994 and involved up to 2,000 construction workers during peak construction. Two "wings" spread in a V to form a vast "mast", while the space between them is enclosed in a massive atrium. The setting of a high rise building on saturated soil and the novelty of the project required groundbreaking dynamic analysis and design to take into consideration soil-structure interaction, effect of water, high winds, and helipad among other loads, to help finalize the design and take the project into construction.

The hotel was built by South African construction contractor Murray & Roberts, now renamed Concur and Al Habtoor Engineering. The interior designs were led and created by Khuan Chew and John Coralan of KCA international and delivered by UAE based Depa Group.

The building opened on 1 December 1999. 

IN-2024 BURJ AL ARAB.pdf