Barry Mucci completed his work installing the base for the RecPath at Lane St. today. There was a glitch with delivering processed aggregate that delayed things, but Barry hauled some loads with his own truck yesterday and today, while Paul from Parks & Rec hauled some more loads this morning. Attached is a photo showing Barry pushing in the last load up to the boardwalk.
There’s clean up work to do along the edges, but the Lane St. gateway to the RecPath is done!! Go check it out when you can. I’ll post photos on the Blog later.