Toget around it you need to home the machine or change the G28 to a Z move so the first move it does is to lift the Z-axis up then does the X and Y move to the start of the cut, this problem is common as mud once you have been informed it is fine, as a practice you should move the Z-axis up your self after you have zeroed at the top of the material.
@shabbir.abdulhussein Please do not ask people to remove a safe move from there Gcode if the op has the cutter sitting on work zero for X, Y, and Z it will drag the cutter across the workpieces if he has not lifted the Z-axis up.
Looking at what you're saying here, the second part of your problem could be as @daniel_lyall is saying to do with the G28 code. I'd always jog the tool up or manually command the home position just as a sanity check for myself before running the program anyway.
Regarding the first part to your problem with it cutting -2mm into the part, i'd say this could be either where you have set the datum on the machine being different to where you have set your WCS on fusion, or, it could be incorrect tool length. So double check these before continuing. The post is posting out the correct coordinates when comparing it to the coordinates on fusion 360 simulation so it appears to be something on the machine side.
Just some additional advice which may help, but looking at the project you attached, it looks like you have 2 toolpaths for machining the top, and then the same two toolpaths but to machine the other side. These two toolpaths need to be in a separate setup though. Currently you have altered the tool orientation, which if you try to post process this, it will probably throw some errors if it's a 3 axis post processor anyway but basically you'd be trying to command the machine to re-orientate to flip the part to machine the other side. Whereas you actually need to take the part out, flip it and then re-datum the part. Not sure if that's what you were intending to do but just thought i'd let you know just in case.
It was on the machine side. I did manually remove the G28 command. The 2mm issue was actually because I had my retract height set too high for the machine so it was hitting the max height of the machine and then thinking it was in a different position. I reduced my retract height and everything seems to be working for now.
In regards to your second comment about tool orientation, I'm aware of how it's set. Before I post-process the bottom clear and bottom finish I go into the setup and invert the axes to match how I plan on flipping the piece when the time comes. Thanks for the advice! About to click go now that I've changed my toolpaths around.
The site is secure.
The ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.
The North Star Project is an acute care rehabilitation approach for patients with moderate and severe traumatic brain injuries. This patient-centered project uses the concepts of Reality Orientation Therapy to develop a unique approach that focuses "environment," "consistency" and "standardization" to promote a total team effort. Patients, treatment staff and members of the patient's family collaborate in a unified bedside protocol that stimulates orientation, encourages patients' appropriate interactions and aims to decrease the length of post-traumatic amnesia. Development of materials, protocols, training and outcome measurement initiatives are described.
In the Big Data definition provided by research and advisory firm Gartner (2014) a strong emphasis is put on technology related aspects and the potential contribution to decision making. As indicated by Kobielus (2013), Big Data players like IBM base themselves on 4 Vs to characterize the key elements of Big Data success: Volume, Variety, Veracity and Velocity.
This tendency to focus on the technical aspects is part of a larger reality where the Big Data potential is put in the perspective of the always moving frontier of technological possibilities. With recent estimates of Turner, Reinsel and Gantz (2014) expecting digital data created by humans and devices to increase between 2012 and 2020 by a 50-fold to almost 40ZB, it seems very unlikely that the attention for technological aspects of Big Data will revert soon.
At the same time, research has indicated repeatedly that the majority of projects focusing on data analytics fail because of non-technical reasons, or because they do not deliver the benefits that are agreed upon at the start of the project (Young, 2003; Gulla, 2012; Van der Meulen & Rivera, 2013). As tools and technology are used by people who are working themselves in an organizational context, this technical IT focus of Big Data endeavors should therefore be complemented with other aspects of the reality.
Complementarily, managing data projects means being able to look beyond the most exciting Big Data facets, and taking time for the guiding project backbone. Freewheeling on the most stimulating ideas can namely only result in a concrete and valuable outcome if the efforts are framed, planned and guided towards a final goal.
Project Management frameworks exist that provide a sound base for a structured project follow-up. Prince21 and PMBOK2, for instance, have been developed and improved, respectively since 1989 and 1996. They are applied nowadays in different sectors by private and public organizations all over the world.