Re: R: 200mw,hfo, 50hz barge mounted power plant

6 views
Skip to first unread message

ARSH IMPEX

<arshimpex@gmail.com>
unread,
Nov 16, 2025, 2:40:21 PM (9 days ago) Nov 16
to Duane Schumacher, Steven Monger, Scott Cavendish, umesh rajyaguru, Mac Val, Giovanni Mantovano [SKY FLY], Fabrizio M, buy

Dear sir 

WE NEED GAS TURBINES APPROX 25-60MW Each NEW / REFURBISHED OR LESS USED 60HZ


Regards 
Faisal Multani 

Arsh Impex (India)

Stockiest/ Suppliers: Main & Aux. Engine and spares /Turbocharger | Purifiers | Hydraulic Equipment |  Power Plants ....

Description: Description: New Bitmap Image

401 Yosufbagh , Prabhudas talav Road, Sishuvihar 
Bhavnagar (Gujarat) 
364001


Cell: +919825207622
Fax: +91278-2518007
Whatsapp: +919825207622
Skype: Faisal Multani



On Wed, 9 Feb, 2022, 11:36 pm 'Duane Schumacher' via sellenergyclub, <sellene...@googlegroups.com> wrote:

48 MW 50 hz - new controls turbine was zero houred - all auxiliaries overhauled back in 2013 , has been laid up, never run since except for testing , asking price is around $ 9 M

the last 220 MW 50 hz barge available was sold to Karadeniz last year - dont think there are any of that size around anymore.

Duane Schumacher

Https://www.energyexpertsnow.com
Av. Boulevard #21 Edif. Aguamarina Suite 101
Juan Dolio, República Dominicana
TE: 1 809 526 3030
Cel 1 809 980 5218 (whats app)


February 9, 2022 1:34 PM, "Steven Monger" <steve...@gmail.com> wrote:
Good afternoon
I have a client that is looking for barge mounted hfo power plant 50hz
Would appreciate any offers
Thanks
Steve
On Wed, 9 Feb 2022, 17:20 Scott Cavendish, <srcav...@turbinefieldservice.com> wrote:

Hello Umesh,

Unfortunately, we do not buy parts or equipment. We primarily provide consulting turbine engineers to perform or support turbine maintenance outages or troubleshooting turbine problems.

Have you thought about posting your power generation products on www.turbinelist.com? It’s a free website to advertise turbine parts and equipment for sale.

Best regards,
Scott

From: 'umesh rajyaguru' via sellenergyclub <sellene...@googlegroups.com>
Sent: Wednesday, February 9, 2022 12:00 PM
To: 'Mac Val' <macrav...@gmail.com>; duane_sc...@energyexpertsnow.com; Giovanni Mantovano [SKY FLY] <g.man...@sky-fly.it>
Cc: 'Fabrizio M' <fabrizi...@gmail.com>; sellene...@googlegroups.com
Subject: Re: R: 200mw,hfo, 50hz barge mounted power plant

DEAR ALL,

I AM UMESH RAJYAGURU FROM BHAVNAGAR GUJRAT INDIA. I AM BROKER AND SUPPLIER OF OLD AND

USED MACHIERY LIKE POWER PLANT, TURBINE, BOILER, D.G.SETS, GAS GEN SET ETC.

I HAVE 225 MW GAS BASE POWER PLANT FOR SALE ( TURBINE ) THE DETAILS ARE ATTACHED HERE

WITH,

SO INTESTEED PEPOPLE CONTACT ME. MY WHATS APP NO 00 91 88 66 04 73 53

UMESH RAJYAGURU

+ 91 9898045181

OLD MANEK WADI,

VAKIL BLOCK NO.4

BHAVNAGAR-364001

GUJRAT

INDIA

On Sunday, December 1, 2019, 10:13:22 PM GMT+5:30, Giovanni Mantovano [SKY FLY] <g.man...@sky-fly.it> wrote:

Hi Jose Valentin and Fabrizio,

Thank you for sending your availability list.

Pls send me your quotation for the following:

Hitachi H - 25 gas turbine, 2011 year, 50 Hz, 11 kV, natural gas, 695 hours

Used

GE LM 6000 Combined cycle power plant, 60 MW, 50 hz, 2009 year, 22,000 hours, natural gas

LM 2500 STIG gas turbine, 25 MW, 50 Hz, 11 kV, Unused, natural gas

WARTSILA W20V34SG

WARTSILA W20V34SG

WARTSILA 20SV34SG

WARTSILA 20V34SG

WARTSILA 20V34 SG

WARTSILA W20V34GS CC

WARTSILA W20V34SG

WARTILA 20V32TS

WARTSILA 50 DF

WARTSILA 18V50DF

WARTSILA 18V46

Pls let me know if you are interested in the

CAT G3516SITA of 1998, 50 Hz, 1,030 MW Gas working

Best regards

Giovanni

http://www.sky-fly.it/firma/logo.png


Ing. Giovanni Mantovano

sr. President

Sky Fly Srl

Sede Legale: Piazza G. Bovio, 22

80133 Napoli-Italy

Sede Operativa: Via G. Arcoleo, 37

80121 Napoli-Italy

Tel / Fax +39 081 7643726

Cell +39 335 8433532

e-mail g.man...@sky-fly.it

site www.sky-fly.it

This email contains privileged and confidential information intended for the addressee only. If you are not the intended recipient, please destroy this email and inform the sender immediately. We appreciate you respecting the confidentiality of this information by not disclosing or using the information in this email.Send SMS

Add to Skype

Free via Skype

Da: sellene...@googlegroups.com [mailto:sellene...@googlegroups.com] Per conto di Mac Val
Inviato: venerdì 29 novembre 2019 13:07
A: duane_sc...@energyexpertsnow.com
Cc: Fabrizio M <fabrizi...@gmail.com>; sellene...@googlegroups.com
Oggetto: Re: 200mw,hfo, 50hz barge mounted power plant

How much tariff do you need/kwhr, minimum offtake say 50Mw

Thanks

Your Business Partner,

JOSE VALENTIN G. GAYOBA - "VAL"

Cp/Viber/Whats Up : +639150943058

image.png

Anyone needing power barges on a rental basis, hfo or gas from 34 to 480 mw please feel free to contact me. 50, or 60 hz, 33 to 138,kv delivered 90 days after contract signing, minimum rental 1,year, PPA up to 25 years possible. No sales only rental although on a 15,year plus PPA I believe we can Negotiate BOOT contract. As I have no idea how this Google groupie thing works here is my email duane_sc...@energyexpertsnow.com

Enviado desde mi HUAWEI Mate 10 lite please excuse spelling mistakes and grammar as native tongue is chinese :0)



-------- Original Message --------
Subject: Re: 200mw,hfo, 50hz barge mounted power plant
From: Fabrizio M
To: Mac Val
CC: sellene...@googlegroups.com

Hi to all,

we have these opportunities in stock, Power stations, pover plants, mobile units and generators, if they are of interest to you.

Have a good time there, bye.

Fabrizio

Power stations – Power plants

Two (2) GE TM 2500+ generation 8 gas turbines, 35 MW, 50 or 60 Hz, Dual fuel, Warranty

New

Four (4) Pratt Mobilpac gas turbines, 30 MW, 50/60 Hz, dual fuel, full warranty, New units

New

Two Frame 7 FA, 171 MW each, Model 7241, gas fuel, 60 HZ, Low NOx

New

Siemens SGT6 - 5000F gas turbine with Alstom Steam Turbine, 60 Hz, natural gas fuel, 360 MW, new

New

Two (2) Siemens SGT A45 gas turbines, 50 or 60 Hz, 45 MW, dual fuel, Trailer mounted

New

Frame 6 FA gas turbine, 71 MW, 50 HZ, 11.5 kV, 1998 year, natural gas, 15,000 hours

Used

Three (3) Frame 9171 E gas turbines, 128 MW, 50 Hz, Dual fuel, full warranty

New

Two (2) Siemens 294 MW, SGT5-4000F gas turbines,50 Hz, new, warranty

New

LMS 100 gas turbine, 50 HZ, 100 MW, natural gas, 2016 standards, conversion to Dual fuel and 60 Hz possible, Warranty

New

Four (4) Siemens SGT 800 gas turbines, 56 MW, 50 or 60 Hz, New

New

Three (3) Frame 6001 B gas turbines, 2007 year, 42 MW, natural gas, test hours only, 50 Hz

Unused

Four (4) Siemens SGT 400 gas turbines, 12.9 MW, 50 or 60 Hz, Dual fuel, Warranty, Stationary

New

GE LM 6000 PC gas turbine, 2008 Year,, 45 MW, 50 Hz, 11500 kV, never used

Unused

GE LM 6000 Combined cycle power plant, 60 MW, 50 hz, 2009 year, 22,000 hours, natural gas

Used

LM 2500 gas turbine, 60 hz, 24 mw, natural gas, new control system, Rebuilt with warranty

Rebuilt

Rolls Royce Trent 60 Combined Cycle plant, 2016 year, 77 MW, Nooter Erikson HRSG, SST 300 STG, 50 Hz

New

GE LM 2500 + Combined Cycle power plant. 2 LM 2500 + gas turbines, 30 MW each, 20 MW Nuovo Pignone STG, 80 MW total, 50 Hz, 11 kV, Dual fuel, low hours since O/H

Used

Two (2) GE Frame 7 EA gas turbines, 85 MW, 60 Hz, Dual liquid fuel, Unused, 13.8 kV, 2008 year

Unused

2003 Siemens SGT 100, 4.7 MW, 60 Hz, 3300 volt, natural gas, 14,000 hours

Used

Siemens Combined Cycle Power Plant, 3 SGT 800 gas turbine, 3 x Aalborg HRSG, 1 SST 900 Steam turbine, all auxiliaries, 50 Hz, Natural gas, 200 MW

Used

Five (5) Siemens SGT 400 gas turbines, 12.9 MW, 50 or 60 Hz, nautural gas, 5000 hours, Stationary

Used

Two (2) SGT 300 gas turbines, 7.9 MW, 50 Hz, Dual fuel, 2014 year, Unused

New

2005 Alstom GT13E2 gas turbine, 185mw, 50hz, 11000 volt, natural gas, 44,000 hours

Used

Two (2) Siemens (701 DU) gas turbines, 50 hz, 125 MW, dual fuel, with warranty, can operate on HFO

Rebuilt

Hitachi H - 25 gas turbine, 2011 year, 50 Hz, 11 kV, natural gas, 695 hours

Used

Four (4) 1991 year Frame 6 gas turbines, model 6541, 50 Hz, 11 kV, natural gas, 2000 lifetime hours

Used

49 MW Siemens SST 400 Steam Turbine, 60 Hz, 13,800 Volt, never used, with warranty

New

36 MW Coal or Biomass plant, Sulzer boiler, Siemens and Kanis steam turbines, 50 hz, 1982 with substantial refurbishment

Used

150 MW ABB Coal plant, 50 Hz, 15.75 kV, Two Fluidized Bed Boilers, ABB Steam Turbine, 2001, Complete

Used

7.5 MW Shin Nippon steam turbine, 60 Hz, 6600 volt, 2008 year

New

8 MW Biomass/Coal power plant, Triveni steam turbine, Thermax Boiler, 50 Hz, 11 kV, 2011 year, installed but not operated

Used

Two (2) 50 MW Siemens Turbine, 60 Hz, 13.8 kV, 2018 year, no generator, but can be provided

New

40 MW ABB Siemens GTL 1200EH Steam Turbine, 50 Hz, 11 kV volt, 1999 year

Used

300 MW Alstom Steam Turbine, 60 Hz, 21kV, 2002 year, never used

Unused

Two (2) GE Steam Turbines, 24 MW, 60 Hz, 13.8 kV, 1997 year

Used

7.9 MW Shin Nippon Condensing, Extraction Steam Turbine, 50 hz, 6600 V, Immediate availability, 47,000 hours

Used

2.6 Dresser Rand Steam Turbine, 2007 year, Unused, 50 Hz, 3300 volt

New

6.5 MW Siemens Condensing Steam Turbine, Steam Turbine, Generator, Condenser, 1997 year, 9000 hours, 50 Hz, 6600 volt

Used

GE Frame 6 gas turbine, 2003 year, model 6581 B, 42 MW, 50 Hz, dual fuel, 110,000 hours

Used

Four (4) Frame 5 N, 20 MW, 60 Hz, natural gas, low hours

Used

2001 LM 6000 PD Combined Cycle, 53 MW, 50 Hz, 76,000 hours, natural gas

Used

1990 LM 2500 DLE gas turbine, Natural gas, 50 Hz, 11 kV, 25 MW, 76,000 hours

Used

GE LM 6000 PC Combined Cycle plant, 120 MW, 50 Hz, 11,000 Volt, 2007 Manufacture, 21,000 hours, natural gas

Used

LM 2500 STIG gas turbine, 25 MW, 50 Hz, 11 kV, Unused, natural gas

Unused

Frame 6 gas turbine, with auxilaries, model 6541, 60 hz, 13,800 volt, natural gas, only 9000 hours

Used

Frame 9 gas turbine, Model PG9171, 123 MW, natural gas, 50 Hz, 57,000 hours, auxiliaries

Used

Siemens SGT 100 gas turbine, 50 Hz, dual fuel, 4.9 mw, 8600 hours

Used

PGT 5 (GE 5) gas turbine only, 2005 year, natural gas

Used

Three (3) Kawasaki gas turbines, 4.3 MW, 50 HZ, 11000 Volt, 7000 Hours, natural gas

Used

80 MW Pratt Swiftpac Comined Cycle (FT8-3), 29 MW x 2 GT, 50 Hz, 11 kV volt, natural gas, 2010 year, low hours

Used

Several Cummins KTA50 diesel generators, skid mounted, 60 hz, 2008 year, 1096 kW

New

CAT 3516 B diesel genset, 2000 kw, 60 hz, skid mounted, 300 hours, 2004, 4160 volt

Used

Several Caterpillar C15 Mobile diesel generators, 500 kW, 60 or 50 hz, trailerized with fuel tank, less than 400 hours

Used

Three (3) MAN THM1304-12 gas turbines, 12 MW, 50 Hz, 6600 volt, 2013 year, dual fuel

New

Three (3) Frame 5 P gas turbines, 1978 year, 23.4 MW, 60 Hz, 13,800 Volt, Natural gas

Used

Wartsila

Wartsila

Power Trailer

4L20

Wartsila

Power Trailer

6l20

Wartsila

Power Trailer

8L20

Wartsila

Power Trailer

9L20

Wartsila

Power Trailer

6L26SG

Wartsila

Power Trailer

6L32

Wartsila

Power Trailer

8L32

Wartsila

Power Trailer

9L32

Wartsila

Power Trailer

12V32

Wartsila

Power Trailer

16V32

Wartsila

Power Trailer

18V32

Wartsila

Power Trailer

16V34SG

Wartsila

Power Trailer

18V34SG

Wartsila

Plat-trailer

20V34SG

Wartsila

Power Trailer

6L46

Wartsila

Power Trailer

8L46

Wartsila

Platform

12V46

Wartsila

Platform

18V46

Wartsila

Platform

18V50DF

MAN

Power Trailer

9L21

MAN

Power Trailer

18V20

MAN

Power Trailer

18V32

Hyundai

Power Trailer

9L25

CAT-MAK

Power Trailer

C-280-8

CAT-MAK

Power Trailer

C-280-16

CAT-MAK

Power Trailer

12V32

Rolls Royce

Power Trailer

9L32

--
You received this message because you are subscribed to the Google Groups "sellenergyclub" group.
To unsubscribe from this group and stop receiving emails from it, send an email to sellenergyclu...@googlegroups.com.
To view this discussion on the web, visit https://groups.google.com/d/msgid/sellenergyclub/f93784e7569bdd0c6dbb22d00950d7e1%40eennow.com.

Duane schumacher

<Duane@eennow.com>
unread,
Nov 17, 2025, 6:55:20 AM (8 days ago) Nov 17
to ARSH IMPEX, Steven Monger, Scott Cavendish, umesh rajyaguru, Mac Val, Giovanni Mantovano [SKY FLY], Fabrizio M, buy
Getting very difficult these days with the data center craze -3-5 year wait on new units

We can offer in 8-10 months fully refurbished 22 MW GE Aero units with new trainer, generator controls and warranty for $ 20 + M depending on options - there are 6 waiting to be refurbished 

We have 2 x 160 MW power barges GE Frame 5 , 1971 model - low hours less than 30 K on average but tehy are fuel hogs  11,950 btu/kwh   for around $ 35 M

(2) D 701 125 MW fullt Refurbised after less that 40,000 hours  in Italy for $ 9 M each but they are 11 KV 50 HZ and conversion is too expensive to consider 

Duane
--
Duane Schumacher CEO Te: 18099805218 (whats app) 18095263030 Office Dominican Republic Worldwide Power Plant Services https://eennow.com

Reply all
Reply to author
Forward
0 new messages