
--We have these new LM 2500 and LM 6000 parts in stock.
From: ayresrock097 <ayresr...@aol.com>
Date: Wednesday, July 1, 2020 at 10:23 AM
To: "ro...@ymail.com" <ro...@ymail.com>, "gar...@307epllc.com" <gar...@307epllc.com>, "omar....@eecc.swiss" <omar....@eecc.swiss>, "g.man...@sky-fly.it" <g.man...@sky-fly.it>, "rmicke...@web.de" <rmicke...@web.de>, Aditya Gandhi <adi...@corponit.com>, "sellene...@googlegroups.com" <sellene...@googlegroups.com>
Cc: "bryce...@evansequip.com" <bryce...@evansequip.com>
Subject: Re: RENTA CATALYST Comerical , Industrial , Marine boats and ships
We have GE TM 2500 ZERO HRS 25/30 MEGA WATTS DUAL FUEL IN STOREAGE NEVER PUT TO SERVICE PRICE TO MOVE THIS PLANT
FROM TIM AYRES
Sent from my Samsung Galaxy smartphone.
-------- Original message --------
From: Gautam Roy <ro...@ymail.com>
Date: 6/30/20 10:40 PM (GMT-08:00)
To: gar...@307epllc.com, "Timothy A. Ayres" <ayresr...@aol.com>, omar....@eecc.swiss, g.man...@sky-fly.it, rmicke...@web.de, adi...@corponit.com, sellene...@googlegroups.com
Subject: Re: RENTA CATALYST Comerical , Industrial , Marine boats and ships
I need a W251B2 rotor or complete engine.
Do you know any?
Best Regards,
Gautam Kumar Roy
Energy +Power Specialists
+91 98337 92176
On Sun, 1 Dec 2019 at 1:00, Garion Dillingham
<gar...@307epllc.com> wrote:
My company 307 owns a used Westinghouse 191 gas turbine only. Its currently being stored in Buffalo New York. If you have any customer operating the 191 please see attached photos and history of the turbine which I have attached.
Have a Blessed Day
Garion Dillingham
307 EP LLC
1108 14th Street Box 92
Cody, Wyoming 82414
Mobile Phone:307 578 9008
Skype: garion.dillingham
Twitter: garion307
From: "'Timothy A. Ayres' via sellenergyclub" <sellene...@googlegroups.com>
Reply-To: "Timothy A. Ayres" <ayresr...@aol.com>
Date: Friday, November 29, 2019 at 10:28 AM
To: <omar....@eecc.swiss>, <g.man...@sky-fly.it>, <rmicke...@web.de>, Aditya Gandhi <adi...@corponit.com>, <sellene...@googlegroups.com>
Cc: <bryce...@evansequip.com>
Subject: Fwd: RENTA CATALYST Comerical , Industrial , Marine boats and ships
DEAR SIRS AND MADAMSThis could saved 5 % percent to 20% and more in fuel savings … do the math … this could help sale your diesel power plant pending what yr you diesel power plants are mechanically or electric fuel injection
read up on the extended longer engine life 18,000 to 24,000 hrs too 28,000 hrs
removes all carbon in 250 hrs
plus we have a liability insurance on the rentar fuel catylast
this device been dyno testing large diesel engine 6 yr strait 118 yrs in lab testing .. look at the labs world wide know
OPEN THE ATTACTMENT YOU WILL SEE FURTUNE 500 COMMPANIES USING THIS DEVICE LARGE MINING COMPANIES
THIS CAN WORK ON DIESEL TURBINE FT8S, MT2500 ,LM600 ,LM2500, LM1500 , SEMENS , YOU NAME IT
MY NAME IS TIM A AYRESMY CELL IS 541 539 0147
OR YOU CAN CONTACT EVANS EQUIPMENT NU ON ATTACTMENT
ATTENTION TO WHO HAVE INTEREST
THESE ATTACHMENTS VERIFIES THAT RENTAR IS AROUND BEEN AROUND AND PROVEN IT DOES PERFORM LIKE IT STATES
ONE OF THE ATTACHMENT SHOW THE COMPANY'S HAVE INSTALLED THEM AND IT WORKS
IF YOU CAN SAVE ON FUEL FROM 3% PERCENT TO 30 % PERCENT PENDING ON WHAT YOUR APPLICATION IS !
PLUS EXTENDED ENGINE LIFE ...FROM 18,000 HRS TO 24,000 HRS… SOME ARE GETTING 28,000 HRS
THIS FUEL CATYLAST DOES NOT EFFECT YOU WARRANTY S FROM CAT, DETROIT CUMMINGS
THEY DENO TESTED IN CALIF FOR 5 YRS AROUND THE CLOCK AND TOP LEADING LAMBS IN THE US AND AROUND THE WORLD
--
You received this message because you are subscribed to the Google Groups "sellenergyclub" group.
To unsubscribe from this group and stop receiving emails from it, send an email to sellenergyclu...@googlegroups.com.
To view this discussion on the web, visit https://groups.google.com/d/msgid/sellenergyclub/1904155871.6757926.1575044904197%40mail.yahoo.com.--
You received this message because you are subscribed to the Google Groups "sellenergyclub" group.
To unsubscribe from this group and stop receiving emails from it, send an email to sellenergyclu...@googlegroups.com.
To view this discussion on the web, visit https://groups.google.com/d/msgid/sellenergyclub/C2F8D3A5-27B2-41F3-9A9F-8051B4CF56EB%40307epllc.com.
You received this message because you are subscribed to the Google Groups "sellenergyclub" group.
To unsubscribe from this group and stop receiving emails from it, send an email to sellenergyclu...@googlegroups.com.
To view this discussion on the web, visit https://groups.google.com/d/msgid/sellenergyclub/99533B42-4D71-4315-944E-A17A65860A72%40307epllc.com.
core engine Centaur 50.
The turbine and associated gearbox have been completely base overhauled after
last operating and are a ready-to-install for a zero-hour turbine exchange.
After the overhaul, there was no active operation / no installation. The
turbine and gear box
Sale Solar Centaur 50 Base overhauled core engine:
Manufacturer Solar Turbines
- Type CENTAUR 50 SoLoNox
- Year of construction 2022 Zero-hour core turbine and gearbox
- Electrical output 4,040 kWel
- Speed 14,944 rpm 50Hz
- Fuel Natural gas H
- Design temperature 15° C
- Turbine inlet temperature 665 °C (1,229 °F)
- Gearbox with zero operating
SIEMENS SGT 600 DLE - Complete CCPP - 35 MW - Ref : P/AA-87-31.3 -3
1 Set - Siemens SGT 600 DLE,year:2011,Hours:553,Fuel:NG,10.5 KV ,50 Hz
,Dry Low Emission - Complete CCPP
Scope:Siemens turbine+gearbox+generator+HRSG+cooler+lube+Sound-Proof+control+Steam turbine+steam turbine generator+high volt cabinet+low volt cabinet+mcc+transformer
Total Power : 25+10 = 35 MW
Siemens GAS Turbine
Model:SGT600DLE
Dual Shafts
Emission type:DLE(Dry Low Emission)
Made in SWEDEN
Power Turbine speed:7759rpm
Equiv.Working hours:553
Number of start:52 times
Total Service time:374
Equiv Operating Cycles:58
Fuel:Dual(Natural Gas),
(Gearbox Ratio:5.172,speed:7759rpm down to 1500rpm,alternator speed:1500rpm )
Quantity of Shafts:Dual Shafts(may drive for compressor)
scope of supply:
1-High Pressure Compressor,2-Combustor,3-High Pressure PT,4-PT,
5-GearBox(Voith),6-Alternator(ABB),7-Gas control part,8-Control room,9-Recovery Heat Boiler
10-Original manual book,11-Chimney,12-Transformer,13-Dryer,15-Fans,16-Airconditionr,17-Control boxes
18-Control computer,19-Cable,20-Lube system,20-some new spare parts
Maintenance record:
a-The maintenance mainly involves passing hot air from the dryer to the combustion chamber. We have previously tried turning the dryer. Desiccant is placed inside the steam drum of the waste heat boiler.
b-The last run was in December 2017, and it was started every three months for about a year. Finally, we communicated with Siemens to adopt a long-term maintenance method, so we did not attempt to ignite again.
Rolls Royce USA, manufactured Trent 60 (SGT-A65) Gas Turbine Generator Set;
· Manufactured in 2016, delivered in August 2017
· 65.9 MW(e) ISO
· 43.8% Gross efficiency / 8,228 kJ/kWh Heat Rate
· DLE Dry Low Emissions with ≤ 25 ppmvd at 15% O2 on fuel gas
· Cold start to full power in under 10minutes
· 50Hz, but easily convertible to 60Hz
· Engine still preserved in original shipping container
· An aero derivative gas turbine
2. HRSG is licensed by Nooter Eriksen USA;
3. Siemens Steam Turbine Generator SST-300 C2S/C160;
· Manufactured in 2016
· Output 15.75MW ISO
· Speed 7059 RPM
· Admission Steam Temperature 400 Degrees C
· Admission Steam Pressure 30 bara
· Exhaust Pressure 0.07 bara
· Rotation- Right; Seen in Steam Flow Direction.