Dear all,
Take the printout of progress report and get attestation from respective Guide and HOD before review.
Check list For Review
1. Progress report
2. Powerpoint presentation (ppt save as 97-2003 format)
3. Print out of the presentation.
4. Confirmation letter from the industry for industrial projects only.
5. All batches on the particular day assemble to the venue sharply at 8:00am
All the best.
--
D.Prabu