Folks, Summarizing our discussion today:
- Asap initiate contact with the UK stations and get dates for setup of
nodes in Uttarakhand
- I am in touch with Air Jaldi for Jharkhand and with Vikas Samvad for
MP, to line up locations for deployment
- The one time test suite is ready, need to measure how long one run
takes. These tests should then be done in multiple locations in UK, MP, JH
- In parallel, reports with standardized graphs are awaited for CDN
tests (Sameer), roaming and network layout (Sameer), scheduling
(Arvind), and stall analysis (Arvind)
Attached is the action plan, and a letter we can use when communicating
with the Uttarakhand stations. We are committing to giving a small
stipend to staff at the stations and other locations, to ensure that the
Netbook remains powered on and they also do a small socio-economic
survey with the community. The survey itself I will send across shortly,
based on a version that Snigdha had done in MP.
Btw, for the power situation, we should think of also positioning a UPS
in case things are really bad.
Aaditeshwar