Today we started the borewell works and the drilling works are going on. Let us all pray god to provide us with clean and hygienic water from the borewell.

As scheduled, today the meeting was conducted and following members attended the meeting;

1. Mr.Giri - B1
2. Mr.Uthrakumar - A2
3. Mr. Jeyandran - A4
4. Mr. Balachander - A1
5. B6 owner's son-in-law
6. Self

Following are the issues discussed in the meeting;

a. The Lift quote (for repair and AMC works) collected by Mr.Giri was discussed and as per the quote(already shared by Mr.Giri in his previous mail), the contribution by each member will be Rs 2500. If any one have better quote same shall be shared with us.
b. The quote for staircase hand rail works are planned to be collected in 2-3 days time and after that the contribution by each member towards lift repair, AMC and hand rail works will be informed.
c. There is a issue raised by our adjacent land owner that a small portion of our plot area is actually belongs to them and they asked us to talk to our builder. We informed them that any such issues they have to take it to our builder & not to us. They also agreed to discuss with our builder. It is decided in the meeting that we shall also take up the issue with builder. A mail to our builder regarding this issue will be sent shortly.
d. Though it is currently practiced, once again it is stressed the importance of owners paying mini. maintenance of Rs.1000 towards monthly maintenance works when their house is vacant.
e. Owner are requested to provide support for all the initiatives taken and they are always welcome to come forward and provide any better solutions for the welfare of our apartment.

Thanks & Regards.
Vijay
B3





--------------------------------------------
On Thu, 28/5/15, vijay karthy <vij_...@yahoo.co.in> wrote:

Subject: Re: [Abinaya Apartment] Bore well Quotation
To: rsdab...@googlegroups.com
Cc: "jer...@yahoo.com" <jer...@yahoo.com>, "ags...@yahoo.com" <ags...@yahoo.com>
Date: Thursday, 28 May, 2015, 7:15 AM

Dear All,

Yesterday we received payment of Rs 6500 from B5 owner.

We will talk to the borewell contractor and will start the
work at the earliest.

Thanks & Regards
B.Vijayakarthy
B3 Abinaya Apartment





--------------------------------------------
On Mon, 25/5/15, vijay karthy <vij_...@yahoo.co.in>
wrote:

  Subject: Re: [Abinaya Apartment] Bore well Quotation
  To: rsdab...@googlegroups.com
  Cc: "jer...@yahoo.com"
<jer...@yahoo.com>,
"ags...@yahoo.com"
<ags...@yahoo.com>
  Date: Monday, 25 May, 2015, 11:41 PM
 
  Dear All,
 
  No money is received from B5 owner. All the calls to B5
  owner goes unanswered. She is not picking the calls for
the
  last 5~6 days. Her number is 9003070725. Other members
  please try calling her. The attitude of committing
something
  and not keeping her word is so bad.
 
  Since days are passing, we are left with following
options;
 
  Option 1; Since 95% of owners(15 out of 16) have paid,let
us
  go ahead with the bore well. However, the bore well water
is
  only for those who have paid the money and the attitude of
  enjoying something without making any contribution shall
not
  be tolerated. 
 
  Option 2; Wait till she pays the money.Already we lost
  plenty of days and there is no guarantee that she will
pick
  our calls and pay the money.
 
  Thanks & Regards
  B.Vijayakarthy
  B3 Abinaya Apartment
 
 
 
  --------------------------------------------
  On Sat, 23/5/15, 'manimalan balachandar' via rsdabinaya
  <rsdab...@googlegroups.com>
  wrote:
 
  Subject: Re: [Abinaya Apartment] Bore well Quotation
  To: "rsdab...@googlegroups.com"
  <rsdab...@googlegroups.com>
  Cc: "jer...@yahoo.com"
  <jer...@yahoo.com>,
  "ags...@yahoo.com"
  <ags...@yahoo.com>
  Date: Saturday, 23 May, 2015, 9:45 PM
 
  Thanks for the updates. Looking
  forward to hear further from B5 owner.
  Thanks and
  Regards,Balachandar.MA1
 
 
 
       On Tuesday, May 19,
  2015 4:33 PM, Annepu Giridhar Rao
  <gered...@gmail.com>
  wrote:
 
     
 
    thanks for
  updating.
  Also confirming
  for the meeting as scheduled on 31st May.
  B1- Giri
  On Tue, May 19, 2015 at
  1:38 PM, 'vijay karthy' via rsdabinaya <rsdab...@googlegroups.com>
  wrote:
  Dear
  All,
 
 
 
  Here are few updates;
 
 
 
  1. Self spoke to B5 owner today and reminded the
pending
  bore well amount. After having explained on various
  concerns
  related to water and lift, she agreed to pay the
borewell
  amount in 2-3 days time. Hope we will get it.
 
 
 
  2. B5 owner had negotiated with the kannan lift and
soon
  we
  will receive a quote(for repair and AMC for both
lifts)
  from
  kannan lift (who is the original supplier and
installer of
  both the lifts in our apartment).
 
 
 
  3. A meeting is planned on 31st May (sunday) 11AM to
  discuss
  on the lift quotation and any other issues.(Hoping
to
  start
  the borewell work before the meeting). All are
requested
  to
  actively participate.
 
 
 
 
 
  Thanks & Regards
 
  B.Vijayakarthy
 
 
 
 
 
 
 
 
 
 
 
 
 
  --------------------------------------------
 
  On Fri, 15/5/15, vijay karthy
  <vij_...@yahoo.co.in>
  wrote:
 
 
 
   Subject: Re: [Abinaya Apartment] Bore well
Quotation
 
   To: rsdab...@googlegroups.com
 
   Cc: "jer...@yahoo.com"
  <jer...@yahoo.com>
 
   Date: Friday, 15 May, 2015, 2:42 PM
 
 
 
   Hi Mr.Giri,
 
 
 
   Contact details of Mr.Balakrishnan (tenant of A9)
  collected
 
   through the security are as follows;
 
 
 
   Kris...@gmail.com
 
   Ph: 9566247522 
 
 
 
   Please update in our data base.
 
 
 
   Thanks & Regards
 
   B.Vijayakarthy
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   ------------------------------------------
 
   On Fri, 15/5/15, Annepu Giridhar Rao <gered...@gmail.com>
 
   wrote:
 
 
 
    Subject: Re: [Abinaya Apartment] Bore well
Quotation
 
    To: rsdab...@googlegroups.com
 
    Cc: "jer...@yahoo.com"
 
   <jer...@yahoo.com>
 
    Date: Friday, 15 May, 2015, 1:23 PM
 
 
 
    Hi,
 
    provide Contact
 
    number and e mail id to be added along with the
tenant
 
    mr.balakrishnan in the record.
 
 
 
    rgds,B1 -
 
    giri
 
    On Thu, May 14, 2015 at
 
    7:59 AM, Anne Bright <abr...@hct.ac.ae>
 
    wrote:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
    Hi Mr. Giri,
 
 
 
     
 
    Kindly update A9 – tenant
 
    details because Mr. Prasanna no longer lives
there, it
  is
 
    Mr. Balakrishnan and family.
 
 
 
     
 
    Thanks
 
     
 
    Anne
 
     
 
    From: rsdab...@googlegroups.com
 
    [mailto:rsdab...@googlegroups.com]
 
    On Behalf Of Annepu Giridhar Rao
 
 
 
    Sent: Wednesday, May 13, 2015 1:07 AM
 
 
 
    To: rsdab...@googlegroups.com
 
 
 
    Cc: ags...@yahoo.com
 
 
 
    Subject: Re: [Abinaya Apartment] Bore well
 
    Quotation
 
     
 
 
 
    file attached. members can
 
    reply for the changes. List made long
 
    back.
 
 
 
     
 
 
 
 
 
    Also i request mr.
 
    uthrkumar to include the B2 email id in the
 
    googlegroup. 
 
 
 
 
 
     
 
 
 
 
 
    rgds,
 
 
 
 
 
    B1 -
 
    Giri
 
 
 
 
 
 
 
     
 
 
 
    On Tue, May 12, 2015 at
 
    8:47 PM, 'manimalan balachandar' via
  rsdabinaya
 
    <rsdab...@googlegroups.com>
 
    wrote:
 
 
 
 
 
 
 
 
 
    Dear B5
 
    Owner,
 
 
 
 
 
     
 
 
 
 
 
    IF
 
    you are receiving this message, please respond
 
    ASAP.
 
 
 
 
 
     
 
 
 
 
 
    Please help complete the show by
 
    making your part of the
 
    contribution.
 
 
 
 
 
     
 
 
 
 
 
    BTW, does anyone have phone numbers
 
    of all owners? Please email it to me as I
recently
  updated
 
    by phone and lost all contacts.
 
 
 
 
 
     
 
 
 
 
 
    Regards,
 
 
 
 
 
    Balachandar.M
 
 
 
 
 
 
 
     
 
 
 
     
 
 
 
 
 
 
 
 
 
 
 
    On
 
    Tuesday, May 12, 2015 12:07 PM, Annepu Giridhar
Rao
  <gered...@gmail.com>
 
     wrote:
 
 
 
     
 
 
 
 
 
 
 
 
 
     
 
    Do we need to understand B5 is not serious on the
 
    state of the condition of their flat terrace which
is
 
   badly
 
    getting affected due
 
     to large scale of water contents from water
head
 
    tanks? 
 
     
 
    These residues scales of iron oxide contents from
 
    the water in the tanks are overflowed at times
are
 
    continuously getting depositing
 
     wet in state over years penetrating into
concrete
 
   ceilings
 
    and walls nearby.  
 
     
 
    These penetrations will have larger impacts in
near
 
    future which affects the ceilings and wall of the
  building
 
    if not taken care at
 
     this stage. It is my kind suggestion to B5 to
look
 
   into
 
    this issue seriously for the kind of money
invested
  after
 
    hard earnings as an owner.
 
 
 
     
 
    I would like our member B5 to note this issue
 
    seriously and do the needful to take care of the
flat.
  It
 
   is
 
    the responsibility of the
 
     flat member to bring it to notice to them and
others
 
    also. 
 
     
 
    if B5 is aware of this issue and still not
worried
 
    and feel not so important to stop the damages
  happening
 
   with
 
    the apartment flat
 
     in future they can discard this
 
    message.
 
     
 
    Rgds,
 
    B1 - Giri
 
 
 
 
 
 
 
     
 
 
 
    On Mon, May 11,
 
    2015 at 6:31 PM, 'vijay karthy' via rsdabinaya
 
    <rsdab...@googlegroups.com>
 
     wrote:
 
 
 
    Dear All,
 
 
 
 
 
 
 
    We, today received Rs 6500 from B2 Owner
Mr.Srinivasan.
  We
 
    thank him for his support.
 
 
 
 
 
 
 
    Now the only left out is B5 Owner Mrs.Charumathi.
 
 
 
 
 
 
 
    When we talked to her, she claims that she had
not
  seen
 
   any
 
    of our mail communications and her reply for
providing
  her
 
    borewell money was not clear. She was mentioning
that
  she
 
    will give but refused to provide a firm date.
 
 
 
 
 
 
 
    Thanks & Regards
 
 
 
    B Vijayakarthy
 
 
 
    B3 Abinaya Apartment.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
    --------------------------------------------
 
 
 
    On Mon, 11/5/15, 'Srinivasan Srinivasan' via
 
    rsdabinaya <rsdab...@googlegroups.com>
 
    wrote:
 
 
 
 
 
 
 
     Subject: Re: [Abinaya Apartment] Bore well
Quotation
 
 
 
     To: "rsdab...@googlegroups.com"
 
    <rsdab...@googlegroups.com>
 
 
 
     Date: Monday, 11 May, 2015, 8:30
 
    PM
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     If a
 
 
 
     member fails to stop these frustrations after
  agreeing
 
 
 
     to contribute, making delays in the coordination
and
 
 
 
     cooperation of welfare activities
 
 
 
     it is not fair from their part to expect others
to
 
   remain
 
    in
 
 
 
     silent or try to
 
 
 
     educate to behave and react in a favorable or
 
    acceptable
 
 
 
     manner. Believe that this is applicable to
 
 
 
     everyone not only for the
 
 
 
     above mentioned. This might have been done from
the
 
 
 
     beginning; I don’t know
 
 
 
     where their voice was.
 
 
 
 
 
 
 
     Understand the issues
 
 
 
     right from the possession of the apartment. I
never
 
   tried
 
    to
 
 
 
     educate to behave
 
 
 
     in favor or accept my views. Last mail posted
from
  my
 
    part
 
 
 
     is March 18, 2015. Giri,
 
 
 
     please get all the conversations from the
meetings,
 
    don’t
 
 
 
     expose by having part
 
 
 
     of the conversations.
 
 
 
 
 
 
 
     I received mail on March 19, 2015. After that
 
 
 
     I have not
 
 
 
     received any mail to my yahoo account for a
long
  period.
 
    We
 
 
 
     came to know all
 
 
 
     the mails and details only from your spouse
over
  phone.
 
 
 
 
 
 
 
 
 
 
 
      I was in situation to
 
 
 
     remind you about my service to the apartment
because
  of
 
    your
 
 
 
     mails stating that
 
 
 
     if there is no
 
 
 
     contribution from
 
 
 
     the owners A3, B2 and B5 for the works to be
carried
  out
 
    has
 
 
 
     to take in-charge
 
 
 
     for maintenance are unfair.
 
 
 
 
 
 
 
 
 
 
 
     The reason for delaying the amount from my
 
 
 
     part is to orient
 
 
 
     everyone in single point to carry out all the
work
 
    needed,
 
 
 
     since we had many occasions
 
 
 
     where we lost individual contribution for lift
and
 
 
 
     maintenance. Till now we are
 
 
 
     unable to collect the same. So I told them in
the
  last
 
 
 
     meetings, if everyone
 
 
 
     gives, I don’t have any issue in giving the
  amount.
 
    Anyhow
 
 
 
     my contribution has
 
 
 
     reached to right place. What will be your view
in
 
    collecting
 
 
 
     the left out
 
 
 
     contribution? There is no intention to mention
my
  work
 
 
 
     there and I don’t
 
 
 
     need any justification. Try to avoid unruly
words
  used
 
    in
 
 
 
     the mails such as
 
 
 
     silly. I didn’t expect from you; it should be
from
 
 
 
     illiterate or qualified
 
 
 
     illiterate people only. The first status is
more
  than
 
 
 
     enough, I never asked
 
 
 
     anyone to mingle the status you mentioned.
 
    regardsSrinivasan
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
         On Sunday, 10 May
 
 
 
     2015 9:03 PM, Annepu Giridhar Rao
 
 
 
     <gered...@gmail.com>
 
    wrote:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     Everyone is aware of Mr
 
 
 
     Srinivasan
 
 
 
     contribution and the services rendered to the
  apartment
 
 
 
     welfare activities for
 
 
 
     the period of charge you took. I had openly
made
  these
 
 
 
     appreciations both in
 
 
 
     the meeting and email forum. Also for the same
  efforts,
 
    it
 
 
 
     is been appreciated
 
 
 
     by most of all other members for the same kind
of
  job
 
    and
 
 
 
     services carried out
 
 
 
     of dedication thereafter so. 
 
 
 
 
 
 
 
      
 
 
 
 
 
 
 
     No
 
 
 
     one had any doubt on the integrity and honesty
on
  the
 
    role
 
 
 
     of the charge you
 
 
 
     took with apartment welfare activities after
  Mr.krishna
 
 
 
     moorty hand over.
 
 
 
 
 
 
 
      
 
 
 
 
 
 
 
     Do
 
 
 
     these past services serve any justification now,
on
 
    delaying
 
 
 
     the contribution share?
 
 
 
     The  members frustration is been there
 
 
 
     for over years and growing more and more with
the
  kind
 
    of
 
 
 
     water quality being
 
 
 
     drawn now.
 
 
 
 
 
 
 
      
 
 
 
 
 
 
 
     If
 
 
 
     a member fails to stop these frustrations after
  agreeing
 
    to
 
 
 
     contribute, making  delays in the coordination
and
 
 
 
     cooperation of welfare
 
 
 
     activities it is not fair from their part to
expect
 
    others
 
 
 
     to remain in silent
 
 
 
     or try to educate to behave and react in a
favorable
  or
 
 
 
     acceptable manner.
 
 
 
 
 
 
 
      
 
 
 
 
 
 
 
     Unfair
 
 
 
     from your end to specify the reason even now
about
  the
 
    delay
 
 
 
     caused for contributing.
 
 
 
     Response made after a long period. Your Last
e-mail
 
 
 
     communication was on feb
 
 
 
     mid.
 
 
 
 
 
 
 
      
 
 
 
 
 
 
 
     You may be right from your
 
 
 
     perception of the
 
 
 
     issue on taking the decision you feel. Whatever
felt
  so
 
 
 
     should be communicated
 
 
 
     within a specific period. Is this way of acting
is
  not
 
 
 
     correct? 
 
 
 
 
 
 
 
      
 
 
 
 
 
 
 
     If someone has not acted
 
 
 
     correctly in the
 
 
 
     past, does that mean it need to be repeat or
reacted
 
 
 
     accordingly so now while
 
 
 
     others took in charge?  
 
 
 
 
 
 
 
      
 
 
 
 
 
 
 
     React and specify openly and
 
 
 
     express to
 
 
 
     all if a member fails in coordinating or
cooperating
 
    so.
 
 
 
      
 
 
 
 
 
 
 
      
 
 
 
 
 
 
 
     Prevailing and pending Issues
 
 
 
     has to close
 
 
 
     within a period as said and agreed before. If
not
 
    everyone
 
 
 
     should come forward together
 
 
 
     for next possible meeting or a discussion.
 
 
 
 
 
 
 
      
 
 
 
 
 
 
 
     My views and suggestions
 
 
 
     expressed treating
 
 
 
     all the members of this apartment as having only
one
 
    status
 
 
 
     as OWNERS. All
 
 
 
     other status remains with individual are
respected
  and
 
    has
 
 
 
     nothing to do with apartment welfare
 
 
 
     common maintenance activities contribution. It
is
  the
 
 
 
     responsibility of the
 
 
 
     owners to take care of this apartment building
 
    irrespective
 
 
 
     whether they occupy
 
 
 
     or not. If any member fails or deviate on this
other
 
    members
 
 
 
     should come
 
 
 
     forward to frame a strong guidelines acceptable
to
  all
 
    to
 
 
 
     stop those silly
 
 
 
     attitudes.
 
 
 
     Rgds,B1-
 
 
 
     Giri 
 
 
 
 
 
 
 
      
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     On Sat, May 9, 2015 at 5:50
 
 
 
     PM, 'Srinivasan Srinivasan' via rsdabinaya
  <rsdab...@googlegroups.com>
 
 
 
     wrote:
 
 
 
 
 
 
 
 
 
 
 
     All members of
 
 
 
     Abinaya,
 
 
 
 
 
 
 
     My sincere request to the people
 
 
 
     who comment on me has to
 
 
 
     mend their way before spilling words.  I
 
 
 
     was also there in my flat for the last three
years;
  I
 
    know
 
 
 
     the situation now
 
 
 
     and earlier, it may be new, who occupied recent
past.
  I
 
    am
 
 
 
     not alone in the apartment,
 
 
 
     hope and remind them that there are 16 flats in
our
 
 
 
     apartment to carry out
 
 
 
     rotational in-charge to look after maintenance.
I
 
 
 
     contributed my part to the apartment
 
 
 
     with and without any office bearer job. My flat
was
 
    remained
 
 
 
     closed for 4
 
 
 
     months even then I gave my minimum maintenance
4
  times
 
    of
 
 
 
     Rs.1000/. I am not
 
 
 
     meant for rent amount.  I won’t mind in
 
 
 
     keep closing my flat forever. Till date I am
not
  going
 
 
 
     behind money. I am not quarreling
 
 
 
     for tens. No one can order me to follow
whatever
  they
 
   say
 
    in
 
 
 
     a blind manner. In
 
 
 
     the meetings conducted earlier itself I agreed
to
  give
 
    the
 
 
 
     expenses in the non-
 
 
 
     consumable head and insisted all the work to be
  carried
 
    out.
 
 
 
     Also everyone
 
 
 
     agreed, those who attended the last meetings,
if
 
    everyone
 
 
 
     gives their
 
 
 
     contribution works will be started. Also I told
them
  at
 
    any
 
 
 
     cost amount will
 
 
 
     not be denied, but delayed. From my part there
is no
 
    single
 
 
 
     paisa pending in our
 
 
 
     apartment expenditure till date. Those who
comment
  more
 
    on
 
 
 
     this issue, what
 
 
 
     will be your decision on both lift functioning
(If
 
    not…)?
 
 
 
      Please collect all the discussion from the
 
 
 
     meetings conducted and react based on that,
stop
 
    unnecessary
 
 
 
     words. My amount
 
 
 
     will reach at right time. If you continue like
this
 
 
 
     coordination and
 
 
 
     cooperation is difficult to get from everyone
in
  future
 
    at
 
 
 
     one point of time.regardsSrinivasan-B2 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
          On Friday, 8 May 2015 4:34 PM, Annepu
 
 
 
     Giridhar Rao <gered...@gmail.com>
 
 
 
     wrote:
 
 
 
 
 
 
 
 
 
 
 
      Do owners of our
 
 
 
     flat apartment members feel good and receiving
the
  rent
 
    from
 
 
 
     tenants after providing this kind of water for
their
 
    daily
 
 
 
     use ?
 
 
 
     Are the tenants by our
 
 
 
     flats owners are taken into granted as
 
 
 
     helpless?
 
 
 
     what does
 
 
 
     the silence from B2 and B5 means after being
several
 
    appeals
 
 
 
     by members on the worst nature of the water
 is
  being
 
    drawn
 
 
 
     ?
 
 
 
     Either tenants of B2
 
 
 
     and B5  can contribute  on behalf of owners
on
 
 
 
     humanitarian and health reasons to stop their
  silence.
 
 
 
     Otherwise the tenants should works on alternate
  option
 
 
 
     immediately as the water quality is dangerous
to
  health
 
 
 
     reasons. 
 
 
 
     Tenant has
 
 
 
     also right to lodge the complaint against owners
on
  the
 
 
 
     quality of water served after collecting the
rent.
 
 
 
      
 
 
 
     rgds,B1
 
 
 
     - Giri
 
 
 
     On Fri, May 8, 2015 at 12:42 PM,
 
 
 
     Jayendran Panneerselvam <jayendran.p...@gmail.com>
 
 
 
     wrote:
 
 
 
     Dear Anbu, Uthra
 
 
 
     and others,
 
 
 
     Could you please
 
 
 
     confirm B2 and B5 owners are receiving these
 
 
 
     emails?
 
 
 
     J-
 
 
 
     A4
 
 
 
     --
 
 
 
     J
 
 
 
 
 
 
 
     On Fri,
 
 
 
     May 8, 2015 at 3:08 PM, gomathy <goma...@gmail.com>
 
 
 
     wrote:
 
 
 
      Owners of B2,
 
 
 
     B5,
 
 
 
     Please find the colour of water today. Humble
 
 
 
     request  to co-operate and pay the bore well
cost
  at
 
    the
 
 
 
     earliest.
 
 
 
     Thanks,
 
 
 
 
 
 
 
     Gomathy
 
 
 
 
 
 
 
     A4
 
 
 
     On May 5, 2015 9:36 PM,
 
 
 
     "'manimalan balachandar' via
 
    rsdabinaya"
 
 
 
     <rsdab...@googlegroups.com>
 
 
 
     wrote:
 
 
 
     Thanks Mr.Anbu for the support. This is
 
 
 
     greatly appreciated.!!
 
 
 
     Dear Fellow
 
 
 
     owners of B2 and B5 flats,
 
 
 
     Can we please make some hurry before the
 
 
 
     water goes black?
 
 
 
 
 
 
 
 
 
     Hi
 
 
 
     Vijay-et-all,
 
 
 
     05/31 is a good day for
 
 
 
     meeting.
 
 
 
     Regards,Balachandar.M
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
          On Tuesday, May 5,
 
 
 
     2015 12:08 PM, Annepu Giridhar Rao <gered...@gmail.com>
 
 
 
     wrote:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     Hi vijay
 
 
 
     karthik,
 
 
 
     Can you
 
 
 
     initiate on having all members ( owners) meeting
and
  a
 
 
 
     simple get together in the first week of the
June
  (week
 
 
 
     end)?
 
 
 
 
 
 
 
     rgds,B1
 
 
 
     -giri
 
 
 
     On Mon, May
 
 
 
     4, 2015 at 7:07 AM, 'vijay karthy' via
 
    rsdabinaya
 
 
 
     <rsdab...@googlegroups.com>
 
 
 
     wrote:
 
 
 
     Dear
 
 
 
     All,
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     Yesterday we got Rs 6500 from A3 owner Mr.Anbu
  towards
 
    the
 
 
 
     borewell installation. We thank him for his
support.
  We
 
 
 
     expect the same support from B2 and B5 owner 
as
  well.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     Also as i informed earlier, for next meeting a
date
  is
 
 
 
     required as per everyone's convenient time.
Will
  it
 
    be
 
 
 
     convenient for everyone,  a meeting on 31st
May,
  Hope
 
    by
 
 
 
     that time , we will complete the borewell
(after
 
    receiving
 
 
 
     money from B2 & B5 owners) and we can
discuss on
 
    the
 
 
 
     lift quotations/finalizing a suitable lift AMC
  vendor
 
    and
 
 
 
     any other issues.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     Thanks & Regards
 
 
 
 
 
 
 
     B.Vijayakarthy
 
 
 
 
 
 
 
     B3 Abinaya Apartment
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     --------------------------------------------
 
 
 
 
 
 
 
     On Sun, 3/5/15, Jayendran Panneerselvam <jayendran.p...@gmail.com>
 
 
 
     wrote:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      Subject: Re: [Abinaya Apartment] Bore well
  Quotation
 
 
 
 
 
 
 
      To: rsdab...@googlegroups.com
 
 
 
 
 
 
 
      Cc: ags...@yahoo.com
 
 
 
 
 
 
 
      Date: Sunday, 3 May, 2015, 9:46 PM
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      A3,B2,B5,
 
 
 
 
 
 
 
      Attached is the color of the water now.
 
 
 
 
 
 
 
      Please cooperate to solve the water issue.
Hope
 
 
 
 
 
 
 
      you understand that this 8k expense will save
your
 
    long
 
 
 
     term
 
 
 
 
 
 
 
      investment of the house.
 
 
 
 
 
 
 
      Already rental value of abhinaya is less
 
 
 
 
 
 
 
      compared to nearby flat.
 
 
 
 
 
 
 
       Similarly if these issue are not solved your
 
 
 
 
 
 
 
      flat value will also come down.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      J
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      A4
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      On 2 May, 2015 12:59 am,
 
 
 
 
 
 
 
      "'manimalan balachandar' via
 
 
 
     rsdabinaya"
 
 
 
 
 
 
 
      <rsdab...@googlegroups.com>
 
 
 
 
 
 
 
      wrote:
 
 
 
 
 
 
 
      Hello
 
 
 
 
 
 
 
      Anbuchezeian,
 
 
 
 
 
 
 
      Thanks for the message.
 
 
 
 
 
 
 
      No one is threatening anyone. It is a request
from
 
 
 
     everyone
 
 
 
 
 
 
 
      to co-operate and help with getting common
  problems
 
 
 
     solved
 
 
 
 
 
 
 
      at the earliest.
 
 
 
 
 
 
 
      ALL,
 
 
 
 
 
 
 
      As we make
 
 
 
 
 
 
 
      more delays, it is US who are going to
 
 
 
 
 
 
 
      suffer!!!!!
 
 
 
 
 
 
 
      Your
 
 
 
 
 
 
 
      co-operation towards borewell/elevator work
is
  highly
 
 
 
 
 
 
 
      appreciated.
 
 
 
 
 
 
 
      Regards,Bala
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
           On Friday, May 1,
 
 
 
 
 
 
 
      2015 4:03 PM, Annepu Giridhar Rao <gered...@gmail.com>
 
 
 
 
 
 
 
      wrote:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      No one is
 
 
 
 
 
 
 
      threatening any one here. Every one has
expressed
 
    their
 
 
 
 
 
 
 
      views and suggestions due the delays without
  reason
 
     on
 
 
 
     the
 
 
 
 
 
 
 
      cooperation. You can accept or discard the
views
  and
 
 
 
 
 
 
 
      suggestion as you feel.
 
 
 
 
 
 
 
      We
 
 
 
 
 
 
 
      need to renew the Abinaya welfare association
to
 
 
 
     proceed
 
 
 
 
 
 
 
      with legal action.
 
 
 
 
 
 
 
      let
 
 
 
 
 
 
 
      us first have clear policies with strict
  guidelines
 
    on
 
 
 
 
 
 
 
      functioning the welfare association as
detailed in
 
 
 
     Tamilnadu
 
 
 
 
 
 
 
      apartment Association act through the local
police
 
    patrol
 
 
 
     in
 
 
 
 
 
 
 
      charge of the location we reside .
 
 
 
 
 
 
 
      It is my kind request to Mr.Anbu to
 
 
 
 
 
 
 
      lead on renewing the Abinaya Welfare
association
 
 
 
     according
 
 
 
 
 
 
 
      to Tamilnadu apartment Association act
registered
 
 
 
 
 
 
 
      earlier. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       rgds,giri
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      On Fri, May 1, 2015 at 12:15 PM, 'anbu
 
 
 
 
 
 
 
      chezian' via rsdabinaya <rsdab...@googlegroups.com>
 
 
 
 
 
 
 
      wrote:
 
 
 
 
 
 
 
      Hello
 
 
 
 
 
 
 
      Balachandar,
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      Please try to understand the situation, I
have
 
    explained
 
 
 
     all
 
 
 
 
 
 
 
      my concern to Mr. Vijay and I never say, I 
 
    won't
 
 
 
 
 
 
 
      contribute the amount for Bore Well.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      You can't simply discontinue the service, and
 
    this
 
 
 
     kind
 
 
 
 
 
 
 
      issue need to discuss in the meeting not mail
or
  over
 
 
 
     the
 
 
 
 
 
 
 
      phone.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      Don't try to threatening or some other way, I
 
    will
 
 
 
     take
 
 
 
 
 
 
 
      legal action.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       I am waiting for Meeting, will discuss more
on
 
    this.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      Regards,
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      Anbuchezeian.R
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      --------------------------------------------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      On Thu, 4/30/15, 'manimalan balachandar'
  via
 
 
 
 
 
 
 
      rsdabinaya <rsdab...@googlegroups.com>
 
 
 
 
 
 
 
      wrote:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Subject: Re: [Abinaya Apartment] Bore well
 
    Quotation
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       To: "rsdab...@googlegroups.com"
 
 
 
 
 
 
 
      <rsdab...@googlegroups.com>
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Cc: "ags...@yahoo.com"
 
 
 
 
 
 
 
      <ags...@yahoo.com>
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Date: Thursday, April 30, 2015, 8:49 PM
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Well there is other way
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       around, discontinuation of services (water
and
 
    other
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       amenities) for the late
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       payers/defaulters.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       However that would be
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       too hard. Isn't that.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       A3, B2
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       or B5 please respond ASAP.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Regards,Balachandar.M
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
           On Sunday, April 26,
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       2015 8:24 PM, 'manimalan balachandar'
  via
 
 
 
 
 
 
 
      rsdabinaya
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       <rsdab...@googlegroups.com>
 
 
 
 
 
 
 
      wrote:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
        I agree
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       with everyone's view here. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       We need
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       full cooperation form all flat owners. The
below
 
    needs
 
 
 
     to
 
 
 
 
 
 
 
      be
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       addressed ASAP.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       The
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       pending flat owners should consider the
  situation
 
    and
 
 
 
 
 
 
 
      give
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       importance to the water issue and pay the
  money. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       I
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       propose either A3, B2 or B5 should take over
the
 
    next
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       rotational charge and the rest should
support
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       them.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Thanks and Regards,Balachandar.M
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
            On Sunday, April 26,
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       2015 1:10 AM, Annepu Giridhar Rao
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       <gered...@gmail.com>
 
 
 
 
 
 
 
      wrote:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       I endorse mr.pannerselvam views and
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       agree his suggestion.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       byB1 -
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       GiriAbhinaya Owners
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Association
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       On Sat, Apr 25, 2015 at
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       8:30 PM, Jayendran Panneerselvam <jayendran.p...@gmail.com>
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       wrote:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Hi All,
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Agree
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       with  Uthra. In addition to regular
maintenance
 
 
 
 
 
 
 
      activities,
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       he has taken the initiatives and spend his
time
  and
 
 
 
 
 
 
 
      effort
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       to solve an serious issue. I propose getting
A3,
 
    B2,
 
 
 
     B5
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       tenant's support to get money from owners.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       If owners agree we can issue the
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       following notice to A3, B2, B5 tenants with
 
    signature
 
 
 
 
 
 
 
      from
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       other owners.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Same can be put in notice board as
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       well.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Dear
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Tenants,
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       As you know
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       we are having the following water problem in
our
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       apartment
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       1) Water
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       being muddy2) Pump gets frequently repaired
as
 
 
 
 
 
 
 
      it
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       is running 24 hours and water might get
stopped
  any
 
 
 
 
 
 
 
      time
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       soon3) Maintenance is high due to 24 hours
of
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       pump running time.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Apartments near by do not face this
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       issue and getting clear water 365 days.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Our association has planned to put a
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       new borewell, pump and pipeline to solve
this
  issue
 
 
 
     at
 
 
 
 
 
 
 
      a
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       cost of 1 lakh which will in-turn cost Rs.
6,500
 
    per
 
 
 
 
 
 
 
      owner.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       13 owners have paid but your landlord is
one
  among
 
 
 
     the
 
 
 
 
 
 
 
      3
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       defaulters for more than a month. Please
ask
  them
 
    to
 
 
 
     pay
 
 
 
 
 
 
 
      the
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       amount immediately so that water issue can
be
 
    solved
 
 
 
     in
 
 
 
 
 
 
 
      a
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       week.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       By,
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Abhinaya Owners
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Association Note: Similarly if owners
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       feel lift is an issue, Please take ownership
of
  it,
 
 
 
     Get
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       quote, Propose a solution, we will all
support
  you.
 
 
 
 
 
 
 
      Stopping
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       one work because of other is not an
solutions. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       --
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       J
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       On
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       Sat, Apr 25, 2015 at 5:30 PM, Annepu
Giridhar
  Rao
 
    <gered...@gmail.com>
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       wrote:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
        hi,
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       I
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       propose either A3, B2 or B5 should take over
the
 
    next
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       rotational charge and the rest should
support
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       them.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       rgds,B1 -
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       giri
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  %

vijay karthy

unread,
Jun 12, 2015, 2:03:03 AM6/12/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Dear All,

Last week drilling of bore well is completed. The total depth drilled is 230 feet against the planned depth of 180 feet as the water yield was not so good at 180 feet.

Today we are starting the installation of borewell pumps and pipelines. We are planning to install automatic on/off submersible pump to avoid pump running at dry condition. This will increase the life of pump and frequent repair works.

Because of the increase in borewell depth(additional 50 feet), automatic pump, additional electrical wiring, additional pipes, the actual budget is going up against the estimated budget. We will inform the exact expenditure on borewell once the works gets completed and the additional per head amounts to be collected.

Thanks & Regards
Vijay
B3 Abinaya Apts.






--------------------------------------------
On Sun, 31/5/15, vijay karthy <vij_...@yahoo.co.in> wrote:

Subject: [Abinaya Apartment] Bore well work
Date: Sunday, 31 May, 2015, 9:27 PM

Annepu Giridhar Rao

unread,
Jun 12, 2015, 3:01:24 AM6/12/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Vijay,


Please inform us the amount to be paid for the excess on the work carried out for the bore well.

Hope every one appreciates and co operate Mr vijay on contributing the additional amount to be incurred to complete the Bore well work as said and mentioned. 

separate Automatic on/off unit is a right option and very much needed for the cost of the motor. 

Kindly inform us the amount to be shared for both lift repair &  AMC and also for the staircase hand support bar as discussed in the last meeting.

Hope you had received the quotation. The quotation you had received will be valid for short period of time. it cannot be assumed the price quoted will be same after more than a month.


regards,
B1 - Giri

--
You received this message because you are subscribed to the Google Groups "rsdabinaya" group.
To unsubscribe from this group and stop receiving emails from it, send an email to rsdabinaya+...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Jayendran Panneerselvam

unread,
Jun 14, 2015, 6:51:12 AM6/14/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Thanks vijay for the efforts and updates.

--
J

manimalan balachandar

unread,
Jun 14, 2015, 11:45:16 AM6/14/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Thanks vijay for the efforts and updates. Looking forward to hear on remaining expenses share :-)

Regards,
Balachandar.M

Srinivasan Srinivasan

unread,
Jun 15, 2015, 12:11:42 AM6/15/15
to rsdab...@googlegroups.com, jer...@yahoo.com
Thanks for the wonderful work done by Vijay and the support given by others to bring out solution for the water issues. Also thanks Giri for the steps taken to solve the lift issue and to bring out neighbour site owner's issues with our apartment to the builder's knowledge.

regards,
Srinivasan

vijay karthy

unread,
Jun 16, 2015, 4:32:25 AM6/16/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Dear All,

Fixing of borewell pump and associated pipelines work is completed. From yesterday evening (15.06.2015), we are getting the borewell water and our overhead tanks are getting filled with borewell water. We thank all owners who stood united and provided all required supports for the completion of this borewell activities and special thanks to god.

The development work is not yet completed. As part of further welfare activities as discussed and planned earlier, we need to take up further works such as repair and renewal of lift AMC, hand grab rail in staircase/steps, desilting of well water etc….Also as informed earlier, the final cost towards borewell activity exceed our planned budget due to drilling extra 50 feet bore, additional pipes and automatic motor with level controls.

Following are the cost breakups for borewell;

1. Planned budget for borewell Rs 104000
2. Actual expenditure for borewell Rs 110678(Rs 55500 for drilling bore, inserting pipes + Rs 53178 for automatic pump, level controllers, cables, pipelines, borewell cover + Rs 2000 for removing mud came out of borewell & cleaning of apartment)
3. Extra/additional expense on borewell Rs 6678 (i.e 110678 – 104000)

Now following is the additional amount required to be collected from all owners towards following activities;

a. Extra/addtional expense on borewell Rs 6678
b. Lift repair & AMC for both lifts Rs 40000
c. Hand grab rail in staircase/steps Rs 35000
d. Open well desilting Rs 6000
e. Total expenses Rs 87678
f. Contribution by each member Rs 5500 (i.e 87678/16)

Hence I request all owners to contribute Rs 5500 each to start the pending welfare activities which were discussed long back.

Thanks & Regards
Vijay
B3






--------------------------------------------
On Fri, 12/6/15, vijay karthy <vij_...@yahoo.co.in> wrote:

Subject: Re: [Abinaya Apartment] Bore well work
Date: Friday, 12 June, 2015, 11:33 AM

manimalan balachandar

unread,
Jun 16, 2015, 1:00:12 PM6/16/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Hello Vijay,

Thanks for the update. Great work. Thank you all for the contribution and cooperation.

Regards,
Balachandar.M -A1



--
You received this message because you are subscribed to the Google Groups "rsdabinaya" group.
To unsubscribe from this group and stop receiving emails from it, send an email to rsdabinaya+unsub...@googlegroups.com.

Annepu Giridhar Rao

unread,
Jun 16, 2015, 10:59:04 PM6/16/15
to rsdab...@googlegroups.com
Dear Vijay,

thanks for the efforts taken on completing the bore well work.

as mentioned the required contribution share Rs 5500 for both lift and associated other welfare works required to complete as mentioned will be handed over by today.

rgds,
B1 - Giri



--
You received this message because you are subscribed to the Google Groups "rsdabinaya" group.
To unsubscribe from this group and stop receiving emails from it, send an email to rsdabinaya+...@googlegroups.com.

vijay karthy

unread,
Jun 17, 2015, 4:22:55 AM6/17/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Dear All,

My account details are as follows;

Name: B VIJAYAKARTHY
A/C No:793545554
Bank:Indian Bank
Branch: Ramapuram Chennai
IFSC Code: IDIB000R071
MICR Code: 600019149

Please transfer Rs 5500 to this account. As a policy(which was practiced last time as well), we will begin the work only after all 16 owners are contributing this amount. Hope every member/owners agree.

Thanks & Regards
Vijay
B3






--------------------------------------------
On Tue, 16/6/15, vijay karthy <vij_...@yahoo.co.in> wrote:

Subject: Re: [Abinaya Apartment] Bore well work
To: rsdab...@googlegroups.com
Cc: "jer...@yahoo.com" <jer...@yahoo.com>, "ags...@yahoo.com" <ags...@yahoo.com>
Date: Tuesday, 16 June, 2015, 2:02 PM

vijay karthy

unread,
Jun 18, 2015, 12:19:01 PM6/18/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Hello Mr.Giri,

Received today Rs 5500 from you. Thanks for being always the first person in contributing money towards the welfare activities.

Thanks & Regards
Vijay
B3








--------------------------------------------
On Wed, 17/6/15, vijay karthy <vij_...@yahoo.co.in> wrote:

Subject: Abinaya Apartment - Lift repair & AMC
Date: Wednesday, 17 June, 2015, 1:52 PM

manimalan balachandar

unread,
Jun 19, 2015, 1:08:13 PM6/19/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Hello Vijay,

Transferred INR5500 today evening towards Lift repair and AMC.

Regards,
Balachandar.M - A1



--
You received this message because you are subscribed to the Google Groups "rsdabinaya" group.
To unsubscribe from this group and stop receiving emails from it, send an email to rsdabinaya+unsub...@googlegroups.com.

vijay karthy

unread,
Jun 20, 2015, 7:41:47 AM6/20/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Hi Balachandar,

I received Rs 5500 from you. Thanks for your support. Other members please transfer the amount.

Thanks & Regards
Vijay
B3



--------------------------------------------
On Fri, 19/6/15, 'manimalan balachandar' via rsdabinaya <rsdab...@googlegroups.com> wrote:

Subject: Re: [Abinaya Apartment] Re: Abinaya Apartment - Lift repair & AMC
To: "rsdab...@googlegroups.com" <rsdab...@googlegroups.com>
Date: Friday, 19 June, 2015, 10:35 PM
rsdabinaya+...@googlegroups.com.
For more options, visit
https://groups.google.com/d/optout.





--

You received this message because you are subscribed to the
Google Groups "rsdabinaya" group.

To unsubscribe from this group and stop receiving emails
from it, send an email to rsdabinaya+...@googlegroups.com.

vijay karthy

unread,
Jun 20, 2015, 11:38:06 PM6/20/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Dear All,

We received an message from "Cooper elevators" previously "Kannan Lift" that the lift repair works and AMC contract shall be signed & started at the earliest as any delay may lead to revision in their rates.

So i request all owners to transfer Rs 5500 by end of this month(June) so as to sign the AMC contract and start the lift operation from July month onwards. Attached is the copy of lift AMC.

If anyone has any reservations on proceeding with the Lift AMCs please reply and register your suggestions now itself.
Lift AMC.pdf

vijay karthy

unread,
Jun 21, 2015, 12:11:49 PM6/21/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Dear All,

We received Rs 5500/. today from B6 owner Mr.Seenuvasakumaran. Thanks for his support. Others please rush in.

Thanks & Regards
Vijay
B3




--------------------------------------------
On Sun, 21/6/15, vijay karthy <vij_...@yahoo.co.in> wrote:

Subject: Re: Abinaya Apartment - Lift repair & AMC
Date: Sunday, 21 June, 2015, 9:08 AM

vijay karthy

unread,
Jun 22, 2015, 11:07:28 AM6/22/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com

vijay karthy

unread,
Jun 22, 2015, 11:07:30 AM6/22/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Dear All,

We received today Rs 5500 from A2 owner Mr.Uthrakumar. Thanks Mr.Uthrakumar for your support.

Thanks & Regards
Vijay
B3


--------------------------------------------
On Sun, 21/6/15, vijay karthy <vij_...@yahoo.co.in> wrote:

Subject: Re: Abinaya Apartment - Lift repair & AMC
To: rsdab...@googlegroups.com
Cc: "jer...@yahoo.com" <jer...@yahoo.com>, "ags...@yahoo.com" <ags...@yahoo.com>
Date: Sunday, 21 June, 2015, 9:41 PM

vijay karthy

unread,
Jun 23, 2015, 4:07:46 AM6/23/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Dear All,

Today we received Rs 5500 from A7 owner Mr.Sai balaji. Thanks Sai for your support.

Thanks & Regards
Vijay
B3









--------------------------------------------
On Mon, 22/6/15, vijay karthy <vij_...@yahoo.co.in> wrote:

Subject: Re: Abinaya Apartment - Lift repair & AMC
To: rsdab...@googlegroups.com
Cc: "jer...@yahoo.com" <jer...@yahoo.com>, "ags...@yahoo.com" <ags...@yahoo.com>
Date: Monday, 22 June, 2015, 8:37 PM

Annepu Giridhar Rao

unread,
Jun 24, 2015, 1:56:57 PM6/24/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
To all members,


Just for reference of the Lift AMC soft copy attached.

Please kindly have a note on the details as provided by the company. as informed the contract form with signed on behalf of apartment to be handover by and before by this month end to start the repair work and put in normal operation state.

This is just for Information. 

lift amc.pdf

vijay karthy

unread,
Jun 28, 2015, 8:16:02 AM6/28/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Dear All,

In last 3 days, we received Rs 5500 from following Owners;

1. A4 Owner, Mr.Jeyandran
2. A9 Owner, Ms. Anne
3. B2 Owner Mr. Srinivasan
4. B4 Owner Mr. Pitchaiya

We thank above owners for their support.

Thanks & Regards
Vijay
B3





--------------------------------------------
On Tue, 23/6/15, vijay karthy <vij_...@yahoo.co.in> wrote:

kh7
Subject: Re: Abinaya Apartment - Lift repair & AMC
To: rsdab...@googlegroups.com
Cc: "jer...@yahoo.com" <jer...@yahoo.com>, "ags...@yahoo.com" <ags...@yahoo.com>
Date: Tuesday, 23 June, 2015, 1:37 PM

vijay karthy

unread,
Jun 30, 2015, 12:32:52 PM6/30/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Dear All,

We received today Rs 5500 from A6 Owner Mrs.Senchulakshmi. We thank her for the support. As of now we received money from 11 out of 16 owners. We received confirmation from 2 owners that in 2 days time they will transfer the money. We are following with the rest 3 owners.

Thanks & Regards
Vijay
B3





--------------------------------------------
On Sun, 28/6/15, vijay karthy <vij_...@yahoo.co.in> wrote:

Subject: Re: Abinaya Apartment - Lift repair & AMC
To: rsdab...@googlegroups.com
Cc: "jer...@yahoo.com" <jer...@yahoo.com>, "ags...@yahoo.com" <ags...@yahoo.com>
Date: Sunday, 28 June, 2015, 5:45 PM

Annepu Giridhar Rao

unread,
Jul 1, 2015, 4:31:34 AM7/1/15
to rsdab...@googlegroups.com
Hi vijay,

Hope the remaining members contribute at the earliest.

 

Please contact -  Abisha - 9344152203 -  of kannan lifts to start repairing work for the both lifts. 


Lot of cleaning work need to done from their end on these lift areas.


The above number is the source of contact for registering the complaint and getting the status of the complaint if not closed in reasonable time.

 

The above person is responsible on recording the complaints from our side and assigns the job to their service team. Service Calls recorded and maintained by them separately for these both lifts.

 

It is advised not to register the complaint with the service team person directly who attends so.

 

To start so, as informed and agreed, we have to pay Rs 10000 in cash.

 

Once completed, Hand over the signed contracts with the balance amount Rs 30,000 as agreed to place the AMC in force for a year.


thanking you and all the members for the support.

 


rgds,
B1 - Giri


vijay karthy

unread,
Jul 1, 2015, 11:35:35 AM7/1/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Dear All,

Today we received Rs 5500 from following owners;

1. A3 Owner Mr.Anbu
2. B4 Owner Mr.Amarnath
3. A8 Owner, Mr.Prabhu

We thank the above owners for their continuous support. Now the only pending contribution is from B5 & B7 owners.

Thanks & Regards
Vijay
B3





--------------------------------------------
On Tue, 30/6/15, vijay karthy <vij_...@yahoo.co.in> wrote:

Subject: Re: Abinaya Apartment - Lift repair & AMC
To: rsdab...@googlegroups.com
Cc: "jer...@yahoo.com" <jer...@yahoo.com>, "ags...@yahoo.com" <ags...@yahoo.com>
Date: Tuesday, 30 June, 2015, 10:02 PM

vijay karthy

unread,
Jul 6, 2015, 11:23:06 AM7/6/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Dear All,

We received Rs 5500 from B5 & B7 owners, We thank them for their support. Since we received money from all the owners, today we provided Rs10,000 as advance to "Cooper Elevators" and they started the work. Will update the status of the lifts once the repair work gets completed.

Soon we will be starting the hand grab rail work in staircase and the de-silting work in the open well.

Thanks & Regards
Vijay
B3





--------------------------------------------
On Wed, 1/7/15, vijay karthy <vij_...@yahoo.co.in> wrote:

Subject: Re: Abinaya Apartment - Lift repair & AMC
To: rsdab...@googlegroups.com
Cc: "jer...@yahoo.com" <jer...@yahoo.com>, "ags...@yahoo.com" <ags...@yahoo.com>
Date: Wednesday, 1 July, 2015, 9:04 PM

vijay karthy

unread,
Jul 13, 2015, 12:16:42 PM7/13/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Dear All,

Today the lift repair works for both A and B block got completed and both the lifts are operational now. Total amount spent for the lift repair and AMC is Rs 40,000. We signed today the AMC for next one year.

We thank Mr.Giri for his initiation in this regard.

All owners are requested to follow the following instructions while operating the lift and pass on the same message to their tenants as well;

1. Max capacity of lift is 6 persons. Any loads inserted into lift (particularly during house shifting) heaver this equivalent weight will lead to lift failure.
2. While travelling in lift, lift doors shall be opened only after the voice massage announces the arrival of particular floor. Any attempt to open the door before this announcement will stop the lift in between and the person will get struck inside the lift.
3. When get struck inside the life, the concerned person can call for attention by pressing the alarm bell inside the lift (with a bell symbol). Our security is given instructions to come to rescue.
4. While travelling in lift, if the power goes OFF, no need for panic as the battery provided will bring the lift slowly to the nearby floor and door shall be opened only after reaching that floor.

Please pass on above instructions to all your loved ones and to your tenants as safety shall be our first priority.

Thanks & Regards
Vijay
B3








--------------------------------------------
On Mon, 6/7/15, vijay karthy <vij_...@yahoo.co.in> wrote:

Subject: Re: Abinaya Apartment - Lift repair & AMC
To: rsdab...@googlegroups.com
Cc: "jer...@yahoo.com" <jer...@yahoo.com>, "ags...@yahoo.com" <ags...@yahoo.com>
Date: Monday, 6 July, 2015, 8:53 PM

Sai Balaji

unread,
Jul 13, 2015, 12:20:08 PM7/13/15
to rsdab...@googlegroups.com, ags...@yahoo.com, jer...@yahoo.com

Thanks Mr. Giri and vijay for all the work. 

Regards. ..sai

Annepu Giridhar Rao

unread,
Jul 13, 2015, 3:22:24 PM7/13/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com

Dear all members,

Like every member, the initiation taken for resolving the lift issue for the welfare of our apartments. It was great opportunity to serve on my part for apartment welfare during unscheduled short medical vacation trip.

Like every member i am eager to walk in to home using the lift on next Chennai visit. Not used the lift even once from the day one after occupying the flat.

Let us thanks all members for the cooperation and coordination on the contributing the share required as agreed within short period where both lifts has been back in normal working  condition. 

I would like to thank Mr.Vijay Karthik once again on carrying out task bore well, lift repairing and the tasks already planned to execute sequentially.

regards,
B1 - Giri

 











Jayendran Panneerselvam

unread,
Jul 13, 2015, 11:31:36 PM7/13/15
to rsdab...@googlegroups.com, ags...@yahoo.com, jer...@yahoo.com

Thanks girl and vijay.

...

vijay karthy

unread,
Jul 25, 2015, 11:55:31 AM7/25/15
to rsdab...@googlegroups.com, jer...@yahoo.com, ags...@yahoo.com
Dear All,

The staircase hand grab rail is completed. Total expenditure for this work is Rs 29,000. Thanks all for your support.

Thanks & Regards
Vijay
B3









--------------------------------------------
On Mon, 13/7/15, vijay karthy <vij_...@yahoo.co.in> wrote:

Subject: Re: Abinaya Apartment - Lift repair & AMC
To: rsdab...@googlegroups.com