Google Groups no longer supports new Usenet posts or subscriptions. Historical content remains viewable.
Dismiss

checked again on the power. 3

1 view
Skip to first unread message

jtdrfi20

unread,
Jun 25, 2011, 9:22:29 PM6/25/11
to

Symptom Check, adjust and determine the method of troubleshooting the
error shows: ... ... E58 ... ... spindle motor timeout: 1, check whether
the power supply into the line-side phase, if the phase →
voltmeter into line with supply voltage and maintenance. 2, heat relay
protection. First off, and then check whether the phase power line; see
the motor is overloaded, checked again on the power. 3, the spindle
control board 3A fuse blown. Replace fuse. 4, check the spindle control
board connector is solid, if any, damage to the connector ferrule
→ overhaul and replace the connector ferrule. 5,'custom
digitizing' (http://www.eagledigitizing.com/), the spindle control board
problem. Replace the spindle control board. 6, the spindle motor
failure. Spindle motor repair. 7, the main control board problem.
Replace the main control board. Set of 80 turn spindle slow motion, if
less than 80 rpm. Clockwise to adjust the spindle control board
potentiometer VR2,'digitized embroidery designs'
(http://www.eagledigitizing.com/), 80 turn up. Set of 80 turn spindle
slow motion,'embroidery designs' (http://www.eagledigitizing.com/), in
excess of 80 rpm. Counterclockwise to adjust the spindle control board
potentiometer VR2, 80 turn up. Set a maximum speed of 700 rpm, if less
than 700 rpm. Clockwise to adjust the spindle control board
potentiometer VR2, 700 turn up. Set a maximum speed of 700 rpm, in
excess of 700 rpm. Counterclockwise to adjust the spindle control board
potentiometer VR2, 700 turn up. Note: The spindle control board
potentiometer VR3 is the debugging process at the factory as a standard
value, this value is determined at the factory is good,'digitizing'
(http://www.eagledigitizing.com/), therefore prohibiting the scene
adjustment potentiometer VR3.


--
jtdrfi20

0 new messages