Hi Fabian,
Thanks for all of the help with the model & especially with the quick responses.
I'm currently finalizing my model and trying to run some analysis on it, but there's a part of the costs.csv file that I don't understand. Specifically, there are negative marginal costs for a few elements, specifically:
DC and H2 links,
co2,
co2 stored,
and urban central water tanks.
I'm trying to split up system costs by sector and carrier, and I can't quite understand why these costs would be negative. Would it make more sense to ignore them, or to sign correct them?
The negative costs have a magnitude of only around 0.001% of the total costs, so they don't really affect the result, but I was just wondering if there's a way to explain where they come from.
Best,
Paul