Hi, everyone.
I am modeling the electricity grid of Costa Rica using PyPSA. Right now, I have no information added to the column "p_max_pu" of the hydro power plants.
For the solar and wind, I have downloaded time series of electricity output per wind or solar farm using Renewables.Ninja.
Any tip about how to do it for the hydro power plants?
Thanks,
Alonso Jimenez
MEng Student in Energy and Environmental Management. Germany.