The 16.59-km Line 1 (PCMC – Swargate) will be elevated between the headquarters of the Pimpri-Chinchwad Municipal Corporation (PCMC building) in Pimpri to Range Hills, from where it will run underground. Line 2 will run from Vanaz to Ramwadi covering a distance of 14.66 km on an elevated viaduct.
Lines 1 and 2 are expected to be operational in 2021.