1960 Geotech 8700C. 65 years later

18 views
Skip to first unread message

Stephen Hammond

unread,
Aug 4, 2025, 1:37:47 PMAug 4
to Public Seismic Network Mailing List
Still operational and ready to go. 10Kg suspension arm, 10-30 second natural period, primary and calibration coils, airtight, waterproof enclosure - light/electric boom position sensor, electromagnetic damping.   They are so beautiful, it is almost a sin to put the cover on them and hide them in a dark place...
image0.jpeg
image1.jpeg

Reply all
Reply to author
Forward
0 new messages