Groups
Groups
Sign in
Groups
Groups
pslab-fossasia
Conversations
About
Send feedback
Help
[Scrum] Yugesh Kumar - PSLab - 20250705 - False
14 views
Skip to first unread message
yugeshkumar3549
unread,
Jul 5, 2025, 2:24:01 PM
7/5/25
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to pslab-fossasia
1. What did I do yesterday?
Completed work in configuration screen and
made PR (#2769) -
feat: added configuration screen for luxmeter and stored settings
open
(pslab-android)
- Opened Issue(#2768) -
Port configuration screen for instruments and store the configuration.
open
2. What did I do today?
Made suggested changes, applied themeing in PR(
#2769
)
(
pslab-android)
- Made PR (#2771) -
feat: added guide drawer for barometer
open
3. What is stopping me from doing my work?
Nothing.
Reply all
Reply to author
Forward
0 new messages