Groups
Groups
Sign in
Groups
Groups
pslab-fossasia
Conversations
About
Send feedback
Help
[Scrum] Tejas Garg - PSLab - 20251002 - False
7 views
Skip to first unread message
Tejas Garg
unread,
Oct 2, 2025, 4:16:47 AM
10/2/25
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to pslab-fossasia
1. What did I do yesterday?
(pslab-mini-hardware)
- Opened Issue(#54) -
Update Via sizes
closed
: Opened an Issue for updating via sizes.
(pslab-mini-hardware)
- Made PR (#55) -
fix: Update Via Size
closed
: Made PR for updating via sizes.
(pslab-mini-hardware)
- Made PR (#53) -
README update
closed
: Updated README with updated images.
Worked on JLCPCB-specific BOM and CPL files and placed an order for the prototype.
2. What I plan to do today?
(pslab-mini-hardware)
- Opened Issue(#57) -
Adding output files
open
: I have opened an Issue for adding output files to the Repository
(pslab-mini-hardware)
- Opened Issue(#56) -
Fix Q1, Q2 Footprint
open
: Opened an issue for fixing the incorrect footprint of Q1 and Q2.
(pslab-mini-hardware)
- Made PR (#59) -
Adding Output files
open
: Made a PR for adding the output files.
(pslab-mini-hardware)
- Made PR (#58) -
Fixing footprints
open
: Made a PR for correcting the footprint.
Since there were changes in the design files, I have cancelled the previous order for the prototype and placed a fresh order with the updated design.
I will follow up with JLCPCB on the prototype and work on any other improvements as required.
3. What is stopping me from doing my work?
Nothing, all good :)
Reply all
Reply to author
Forward
0 new messages