[VOTE] Vote to decide on production of a new PRIF revision

14 views
Skip to first unread message

Katherine Rasmussen

unread,
Aug 22, 2025, 9:39:21 PMAug 22
to PRIF Specification
Hello all,
     After the vote passed to adopt changes to prif_alias_create, the technical content on the main branch of the prif repository has been updated since the last vote to decide on the production of a new PRIF revision. Based on conversations in a recent PRIF Committee meeting, there is a desire to produce a new revision after the known defects in the current revision have been addressed. The known defects have now been addressed. I have also now been asked by a Committee member to hold a vote on producing a new revision and in accordance with the PRIF governance, this email announces the PRIF Committee vote on a new revision and the technical content to be included.

      Vote: Do you support a new revision (revision 0.6) to be produced with the technical changes that are staged on the main branch of the prif repository? (The latest commit on the main branch at the time of the commencement of the vote is commit hash d79cc067c08c2fa4169a6c5949c732f0dd7e5372).
Please note, this vote is only on the technical changes that will be added to revision 0.6. If this vote passes, any non-normative changes that are required for a new revision will be discussed in PR and do not require formal votes. 
Please note, if this vote passes, a candidate document will be produced with all changes, both technical and non-normative, and a comment period will commence before the revision is published. 

      The decision to produce a new revision with the current staged technical changes must receive approval from 50% of votes (excluding explicit abstentions) to be ratified. Only PRIF Committee members may vote and the options are Yes, No, or Abstain. This vote will remain open until 5 PM (Pacific Time) on Friday, August 29th. In order to register your vote, please reply all to this email and state your vote. If voting against, then your vote must include comments that explain your rationale.

Thank you for your time,
      Kate Rasmussen
      Lawrence Berkeley National Laboratory
      PRIF Community Lead

Katherine Rasmussen

unread,
Aug 22, 2025, 9:55:49 PMAug 22
to PRIF Specification
IMPORTANT CORRECTION on voting close date: This vote will remain open until 5 PM (Pacific Time) on Friday, September 5th. My apologies for misstating the incorrect date in the original email.

Richardson, Brad (JSC-EG311)[Jacobs Technology, Inc.]

unread,
Aug 25, 2025, 8:39:02 AM (13 days ago) Aug 25
to Katherine Rasmussen, PRIF Specification

I vote YES to produce a new revision.

 

Brad

 

From: prif...@googlegroups.com <prif...@googlegroups.com> on behalf of Katherine Rasmussen <krasm...@lbl.gov>
Date: Friday, August 22, 2025 at 8:56
PM
To: PRIF Specification <prif...@googlegroups.com>
Subject: [EXTERNAL] [BULK] [PRIF-spec] Re: [VOTE] Vote to decide on production of a new PRIF revision

CAUTION: This email originated from outside of NASA.  Please take care when clicking links or opening attachments.  Use the "Report Message" button to report suspicious messages to the NASA SOC.



--
You received this message because you are subscribed to the Google Groups "PRIF Specification" group.
To unsubscribe from this group and stop receiving emails from it, send an email to prif-spec+...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/prif-spec/CAGM9fz0MXd49rkOZmkTY%3Dhk_vu3w95O3kEnOZ5oN8xu%3DtOQY%3Dw%40mail.gmail.com.

Jean-Didier Pailleux

unread,
Aug 25, 2025, 9:19:59 AM (13 days ago) Aug 25
to Richardson, Brad (JSC-EG311)[Jacobs Technology, Inc.], Katherine Rasmussen, PRIF Specification

etienne renault

unread,
Aug 31, 2025, 2:01:28 PM (7 days ago) Aug 31
to Jean-Didier Pailleux, Richardson, Brad (JSC-EG311)[Jacobs Technology, Inc.], Katherine Rasmussen, PRIF Specification

Dan Bonachea

unread,
Sep 3, 2025, 4:47:50 PM (4 days ago) Sep 3
to etienne renault, Jean-Didier Pailleux, Richardson, Brad (JSC-EG311)[Jacobs Technology, Inc.], Katherine Rasmussen, PRIF Specification
I vote YES to ratify a new revision of the PRIF specification.

Katherine Rasmussen

unread,
Sep 3, 2025, 8:24:28 PM (4 days ago) Sep 3
to Dan Bonachea, etienne renault, Jean-Didier Pailleux, Richardson, Brad (JSC-EG311)[Jacobs Technology, Inc.], PRIF Specification
I vote YES for a new revision of the PRIF specification.

Damian Rouson

unread,
Sep 5, 2025, 7:21:43 PM (2 days ago) Sep 5
to Katherine Rasmussen, Dan Bonachea, etienne renault, Jean-Didier Pailleux, Richardson, Brad (JSC-EG311)[Jacobs Technology, Inc.], PRIF Specification
I vote YES.

I also just tried replying via Google Groups but it doesn't seem to have transmitted -- apologies if this email is a duplicate.

Damian

Reply all
Reply to author
Forward
0 new messages