Feature Request

11 views
Skip to first unread message

fv...@hotmail.com

unread,
Jun 11, 2011, 5:17:35 PM6/11/11
to Pomodairo
Hi,

can you add the option NOT to make breaks between pomodoros within a
task for tasks of >1 estimated pomodoros in between ?

See, some task may required prolonged concentration, immersion for
40-50 minutes, some better be interrapted between 10-15 minutes.

It does not seem like a dramatic redesign, but will bring the tool on
a next level of flexibility:

a). Add a check box in the Add New task dialog box (i.e. make
interraptions between the Pomodoros witih same tasks)
b). Depending on the check box state, do or skip breaks.

Thanks,
Roman
Reply all
Reply to author
Forward
0 new messages