1) Sound from rotator of the PLD II : Getting Quotation for rotaor as it is giving repetitively same problem.
3) Gas flow issue with MFC & its controller of PLD 3 : Pending4) Spare quartz windows are required for each PLD chamber. (4 nos) : Pending5) Cleaning quartz window & fixing quartz window must be added to SOP: Pending6) Heater Top surface cleaning must be done by last user.7) Laser refilling should be done during Office hours & Weekdays.8) All users need to be trained for Laser refilling.9) Weekend laser refilling with prior permission is allowed.10) Record KrF/ He Pressure after refilling11) Dedicated N2 cylinder is required for lasers : Done12) Flow meter and Valves need to be connected to both Laser for N2: Pending13) Notice for switch ON/ OFF N2 at laser side : Done14) Users need to keep the working place clean, Punishment will be given to those user who are not following the practice.15) PLD -4 need to made UP urgently : Turbo controller is swapped with Ar-ion milling and it is in procurement process.16) Maximum five days slot booking can be done by user.17) KrF Gas Leak Detector required : Pending18 ) Gas cabinet for KrF cylinder : Under process19) XXL size clean room gown for 1.1 Lab : Done20) Notice for closing Fume hood after use.: Done21) Extra Petri dishes required.: Done22) Exhaust pipe length must be increase for Old PLD Laser : DoneThanks & Regards,Manisha