The ship Design I have will work the clean up in 3 stages On the Bow
the Over Size (larger then 3ft)will get hulled aboard and placed in
Cargo Contains. along both sides of the ship a platform is lowered to
the surface a wire frame conveyor belt on the front of the platform
then lowers into the water scoping up the medium size pieces (between
2in and 4ft) checked for sea life the sent up to the ship to be sorted
by recycling center. at the aft of the ship pumps pull the water onto
the ship where smaller pieces (less the 4in) will be screened and
checked for sea life the water and sea life are then returned to the
sea behind the ship more detail on each stage of the clean proses is
Coming there is just a lot of work to do and very little time to write
it all down. I have only been on this for about 3 week and some of
that time was while I aws in the Hospital after my Kidney Surgery.
On Apr 24, 12:01 pm, RavenGrrrl <
ravengr...@gmail.com> wrote:
> -- Look up for original message -- I like keeping the copy short