kindly attach your chapter in this thread


format: please refer guidelines

-Title Page
-Certification
-Acknowledgements
-Table of Contents (including list of figures and list of tables)
-Executive summary

(for chap 1,2,3, please recompile it from our previous report attached and compile it in the new file)

chapter 1

-introduction (background, problem statement, objectives, scope of works)

chapter 2

-literature review

chapter 3

-conceptual process design and synthesis (level1 - level5)

chapter 4

-instrumentation and control

chapter 5

-safety and loss prevention

chapter 6

-waste treatment

chapter 7

-process economics and cost estimation



--
Thanks and Regards,

Siti Aishah binti Mohamad Zamberi
Bachelor (Hons) of Chemical Engineering,
Universiti Teknologi PETRONAS,
Bandar Seri Iskandar, 
31750 Tronoh, 
Perak Darul Ridzuan.
Mobile  : 019-4302832
E-mail  : pinkofan...@gmail.com


Chap 7 softcopy compile.docx

aishah zamberi

unread,
Nov 20, 2012, 10:54:14 PM11/20/12
to plant-desi...@googlegroups.com

this is our previous fydp1 report

thank you...
Correction CHAPTER all latest 3sept_2.00pm.docx

aishah zamberi

unread,
Nov 20, 2012, 10:58:17 PM11/20/12
to plant-desi...@googlegroups.com
this is the latest icon....
including pic+ stream tables + equipment spec

i think we just include the cooler but that one is for HI only... others we assume is not included..
icon.rar

aishah zamberi

unread,
Nov 20, 2012, 10:59:38 PM11/20/12
to plant-desi...@googlegroups.com
after chapter 7 should be:

-conclusion and recommendation 
-references

Akmal Affendy

unread,
Nov 21, 2012, 12:06:55 AM11/21/12
to plant-desi...@googlegroups.com
my part


--
You received this message because you are subscribed to the Google Groups "Plant Design Group 16" group.
To post to this group, send email to plant-desi...@googlegroups.com.
To unsubscribe from this group, send email to plant-design-gro...@googlegroups.com.
For more options, visit this group at http://groups.google.com/group/plant-design-group-16?hl=en.



--
RAJA NORAKMAL B. RAJA BAKHTIAR AFFENDY,

Bachelor (Hons) of Chemical Engineering,
Universiti Teknologi PETRONAS,
Bandar Seri Iskandar,
31750 Tronoh,
Perak Darul Ridzuan.
SAFETY AND LOSS PREVENTION2.docx

aishah zamberi

unread,
Nov 21, 2012, 10:22:15 PM11/21/12
to plant-desi...@googlegroups.com

hello, i hope akmal and wani can compile the report...

here is the front and back part for the report...

to osama, sam and waddaa, please attach your part in this thread...............


please use this pfd (without additional cooler) but find the information (stream table & equipments) based on previous post (ignore the cooler and stream after that)

later on after compilation is complete, please send to this thread in words file........ 

thank you,

regards,
aishah
1. COVER FYDP II (please change table of content, list of fig and table).docx
CONCLUSION AND RECOMMENDATIONS.docx
flowsheet visio.vsd
pfd flowsheet.bmp

wani syaz

unread,
Nov 21, 2012, 10:23:08 PM11/21/12
to plant-desi...@googlegroups.com
ok.i'm working on it.

wani syaz

unread,
Nov 21, 2012, 10:33:22 PM11/21/12
to plant-desi...@googlegroups.com
guys, can anyone help me compiling the material for fydp 2? because there are a lots of fydp 1 one that need to be amend. reply to this thread. asap. basically fydp 2 is not that difficult compared to  fydp 1. thanx.

aishah zamberi

unread,
Nov 21, 2012, 11:05:12 PM11/21/12
to plant-desi...@googlegroups.com
wani, maybe can ask akmal to compile chap 1,2,3... i will having fyp lab today, but i can help with chapter 1... i'll send it asap

On Thu, Nov 22, 2012 at 11:33 AM, wani syaz <wani....@gmail.com> wrote:
guys, can anyone help me compiling the material for fydp 2? because there are a lots of fydp 1 one that need to be amend. reply to this thread. asap. basically fydp 2 is not that difficult compared to  fydp 1. thanx.

--
You received this message because you are subscribed to the Google Groups "Plant Design Group 16" group.
To post to this group, send email to plant-desi...@googlegroups.com.
To unsubscribe from this group, send email to plant-design-gro...@googlegroups.com.
For more options, visit this group at http://groups.google.com/group/plant-design-group-16?hl=en.

Akmal Affendy

unread,
Nov 21, 2012, 11:07:23 PM11/21/12
to plant-desi...@googlegroups.com
sorry, I'm so busy with FYP. got last minute change to do for the pre-sedex. so sorry, guys.
RAJA NORAKMAL B. RAJA BAKHTIAR AFFENDY,
Bachelor (Hons) of Chemical Engineering,
Universiti Teknologi PETRONAS,
Bandar Seri Iskandar,
31750 Tronoh,
Perak Darul Ridzuan.

wani syaz

unread,
Nov 21, 2012, 11:14:08 PM11/21/12
to plant-desi...@googlegroups.com
i need a helper for fydp 2 because i'm doing fydp 1. no need for redundant work. nvm aishah.

Osama B. Syed

unread,
Nov 21, 2012, 11:23:36 PM11/21/12
to plant-desi...@googlegroups.com
Dear Wani, 

I am also making some ammendments in FYDP 1 especially for the type of reactor. I am going to post it soon

On Thu, Nov 22, 2012 at 12:14 PM, wani syaz <wani....@gmail.com> wrote:
i need a helper for fydp 2 because i'm doing fydp 1. no need for redundant work. nvm aishah.

--

aishah zamberi

unread,
Nov 21, 2012, 11:48:25 PM11/21/12
to plant-desi...@googlegroups.com
for fydp 2

chapter 5,7, conclusion and rec is already here... 

we only need chapter 4 and 6 to merge in one file together with fydp 1 (chap1,2,3)



waad gasim

unread,
Nov 21, 2012, 11:57:41 PM11/21/12
to plant-desi...@googlegroups.com
osama i am here if u need any help 
whr r u ?

waad gasim

unread,
Nov 21, 2012, 11:58:12 PM11/21/12
to plant-desi...@googlegroups.com
cus i need ur help 2 to finish our part 

wani syaz

unread,
Nov 22, 2012, 12:03:39 AM11/22/12
to plant-desi...@googlegroups.com
Osama, kindly include your part here. thanx.
Correction CHAPTER all latest 22nov.doc

Osama B. Syed

unread,
Nov 22, 2012, 1:15:53 AM11/22/12
to plant-desi...@googlegroups.com

Dear Wani,
 
Kindly please find the latest report including Chapter 6 on waste management  and please note the following ammendments that I have made in our FYDP 1 section. Thank you :)
 
Ammendments that I have made:

Conceptual Design for reactor changed to Fixed Bed
Page 68: line 3 changed from distillation unit to stripper
Page 87: Heading changed to stripper
Page 88: Table heading changed to stripper
Page 79: Adjusted the mixer diagram

Thank you again

Correction CHAPTER all latest 22nov.zip

dhukpuou M.R.D

unread,
Nov 22, 2012, 10:49:22 PM11/22/12
to plant-desi...@googlegroups.com
Hello friends,
Please find attached the latest with corrections on chapter 4(my part)

--
You received this message because you are subscribed to the Google Groups "Plant Design Group 16" group.
To post to this group, send email to plant-desi...@googlegroups.com.
To unsubscribe from this group, send email to plant-design-gro...@googlegroups.com.
For more options, visit this group at http://groups.google.com/group/plant-design-group-16?hl=en.



--

# . Ukitaka salama ya dunia zuia ulimi wako

                       dmsA,    ChE


Correction CHAPTER all latest 23nov.doc

wani syaz

unread,
Nov 23, 2012, 12:54:52 AM11/23/12
to plant-desi...@googlegroups.com
sam, how about p&id? or i'll just proceed with this?

dhukpuou M.R.D

unread,
Nov 23, 2012, 1:41:02 AM11/23/12
to plant-desi...@googlegroups.com
Hello Wani,
Yeah just proceed with that. I hope the summary won't be an issue.

On Fri, Nov 23, 2012 at 1:54 PM, wani syaz <wani....@gmail.com> wrote:
sam, how about p&id? or i'll just proceed with this?

--
You received this message because you are subscribed to the Google Groups "Plant Design Group 16" group.
To post to this group, send email to plant-desi...@googlegroups.com.
To unsubscribe from this group, send email to plant-design-gro...@googlegroups.com.
For more options, visit this group at http://groups.google.com/group/plant-design-group-16?hl=en.

wani syaz

unread,
Nov 23, 2012, 1:49:45 AM11/23/12
to plant-desi...@googlegroups.com
it's not a summary. i'ts p&id. the whole p&id. as important as PFD. hope you can finish it before presentation.

dhukpuou M.R.D

unread,
Nov 23, 2012, 4:08:51 AM11/23/12
to plant-desi...@googlegroups.com
ok

On Fri, Nov 23, 2012 at 2:49 PM, wani syaz <wani....@gmail.com> wrote:
it's not a summary. i'ts p&id. the whole p&id. as important as PFD. hope you can finish it before presentation.

--
You received this message because you are subscribed to the Google Groups "Plant Design Group 16" group.
To post to this group, send email to plant-desi...@googlegroups.com.
To unsubscribe from this group, send email to plant-design-gro...@googlegroups.com.
For more options, visit this group at http://groups.google.com/group/plant-design-group-16?hl=en.

Osama B. Syed

unread,
Nov 23, 2012, 7:28:46 AM11/23/12
to plant-desi...@googlegroups.com
Please find the report that I submitted to Dr Rajashekhar after including the table of content.
 
Please note that Dr. Raj says the report must not be more than 100 pages inlcuding appendix. Hence we would need to cut down on the number of pages or there might be penalized for the final report.

Group 16 FYDP Report (Draft).pdf

aishah zamberi

unread,
Nov 24, 2012, 8:23:44 PM11/24/12
to plant-desi...@googlegroups.com
dear friends,

i think we can leave all the calculation as the appendix (mass & energy balance) to reduce the page number