aishah zamberi

unread,
Dec 14, 2012, 9:54:27 PM12/14/12
to plant-desi...@googlegroups.com
to all,

please complete your report by monday 12 as i would like to submit it after lunch.. please submit your softcopy to me by 10am monday and make sure to bring along your completed binding report with printed drawings~

to do list:
1) print p&id in A1 (wani)
2) print plant layout in A3 (akmal)
3) print your major equipment design in A3 (all)
4) compile and binding your individual report (not more than 20 pages including major and minor) (all)
5) compile the group report (100 pages + 20 appendix) (aishah)
6) softcopy of group report in cd (aishah)
7) softcopy of individual report in cd (aishah)

--
Thanks and Regards,

Siti Aishah binti Mohamad Zamberi
Bachelor (Hons) of Chemical Engineering,
Universiti Teknologi PETRONAS,
Bandar Seri Iskandar, 
31750 Tronoh, 
Perak Darul Ridzuan.
Mobile  : 019-4302832
E-mail  : pinkofan...@gmail.com


aishah zamberi

unread,
Dec 14, 2012, 9:56:24 PM12/14/12
to plant-desi...@googlegroups.com
reminder~

marks will be deducted if you exceed the page numbers limit
thx~

Akmal Affendy

unread,
Dec 15, 2012, 11:28:47 PM12/15/12
to plant-desi...@googlegroups.com
we need to submit together right? so, where & when should we meet? and for the individual report, need to use comb binding or compile together with the group report file?


--
You received this message because you are subscribed to the Google Groups "Plant Design Group 16" group.
To post to this group, send email to plant-desi...@googlegroups.com.
To unsubscribe from this group, send email to plant-design-gro...@googlegroups.com.
For more options, visit this group at http://groups.google.com/group/plant-design-group-16?hl=en.



--
RAJA NORAKMAL B. RAJA BAKHTIAR AFFENDY,

Bachelor (Hons) of Chemical Engineering,
Universiti Teknologi PETRONAS,
Bandar Seri Iskandar,
31750 Tronoh,
Perak Darul Ridzuan.

aishah zamberi

unread,
Dec 16, 2012, 2:05:43 AM12/16/12
to plant-desi...@googlegroups.com
individual should be comb binding and compile together in one file

i think all of us need to gather tmmrow at 3pm to submit the report
hopefully we can meet at block 4

bring your report + drawings 
for softcopy of your report, please uploaded here... thx~  

aishah zamberi

unread,
Dec 16, 2012, 2:08:02 AM12/16/12
to plant-desi...@googlegroups.com
one more thing, akmal can you bring the plant layout drawing tmmrw... thx

and to wani, can you print the p&id in A1 and bring them together tmmrw for submission... thx

i'm in the middle of printing our group report as well as preparing the file and softcopy for our group work

waad gasim

unread,
Dec 16, 2012, 6:25:15 AM12/16/12
to plant-desi...@googlegroups.com
btw guys i got the RE inforcement Ring 4 free
so if any 1 need to use 
i ll bring with me to our meeting 
good luck guys this our last job together 

waad gasim

unread,
Dec 16, 2012, 8:32:58 PM12/16/12
to plant-desi...@googlegroups.com
dear group mate 
i need help plz who s free let me know 
cus i don't wanna dely it 
bt as u all knows i got problems with FYDP1 
result 
alhamdllah jst on Thusday morning i got it and passed even thus i coludn't attend our oral 
and now alhamdllah i ll b grad on May 
cus u all notice that i m not from this batch 
if i was not participate that much this sem it was because of there sometimes i think may b waddaa u need to repeat this course 
i was more frustrated bt alhamdllah God give me my grade back 
so now also if know 1 of u know i didn't took PPD yet 
so my info about design is not like all of u 
plz help 
and Aisha i don't think i ll make it at 10 am 
cus i m so far 
plz if any 1 of u s finished his part 
plz help me to finish this course with u guys and not need to repeat ir back again with my batch 
  • p.s. my problem is there was some1 hack my prism and withdrawn 4 me the FYP1 AND FYDP1, all of u knows that i admit to hospital bcause of this prob, i don't wht to say more than alhamdllah   

aishah zamberi

unread,
Dec 17, 2012, 3:27:51 AM12/17/12
to plant-desi...@googlegroups.com
please attach your part by tmmrw~

we will submit this together on wednesday morning at 10am

Akmal Affendy

unread,
Dec 17, 2012, 4:17:26 AM12/17/12
to plant-desi...@googlegroups.com
Wani and I got a test Wednesday morning

aishah zamberi

unread,
Dec 17, 2012, 9:41:03 PM12/17/12
to plant-desi...@googlegroups.com
ok, so we'll submit after your test...what time is that?

once again, to the rest,

please attach your individual softcopy by this night as i need to compile the report...
also tmmrw bring along the hardcopy + A3 drawings.... thx~

Akmal Affendy

unread,
Dec 17, 2012, 9:41:54 PM12/17/12
to plant-desi...@googlegroups.com
9-11. ok

wani syaz

unread,
Dec 20, 2012, 5:48:13 AM12/20/12
to plant-desi...@googlegroups.com

ive sent out the reports. and he mentioned that any 5 pages exceeded, 1 marks will be deducted.
 
--
With Regards,

Nurul Syazwani bte Abd. Jabar
Candidates for Bachelor (Hons) of Chemical Engineering,
Universiti Teknologi PETRONAS,                       
Bandar Sri Iskandar, 
31750 Tronoh, Perak.

H/P    : (013) 5302721
email : wani....@gmail.com
 

Akmal Affendy

unread,
Dec 20, 2012, 6:02:07 AM12/20/12
to plant-desi...@googlegroups.com
thanks, wani


--
You received this message because you are subscribed to the Google Groups "Plant Design Group 16" group.
To post to this group, send email to plant-desi...@googlegroups.com.
To unsubscribe from this group, send email to plant-design-gro...@googlegroups.com.
For more options, visit this group at http://groups.google.com/group/plant-design-group-16?hl=en.



--
RAJA NORAKMAL B. RAJA BAKHTIAR AFFENDY,
Bachelor (Hons) of Chemical Engineering,
Universiti Teknologi PETRONAS,

Osama B. Syed

unread,
Dec 20, 2012, 12:11:07 PM12/20/12
to plant-desi...@googlegroups.com
Thanks wani :)