I have stumbled upon interesting example of a bay platform scenario at Stratford and cannot work out how would you link the berth step to the change off signal in the situation where there isn't (at least I cannot see it) a specific signalling mapping in the TD spec file that would correlate to TD "from berth" that starts with A*** letter, in this case at platform 1. All signals and TRTS look to me as S1404 and L1404TRS records in the TD spec. Would just the time window will be enough in such a situations to work out the signal change for a particular headcode stepping from berth 'A404' at platform 1? I have made a little view of the situation based of the https://www.opentraintimes.com map and rail-wiki.