Production documentation

25 views
Skip to first unread message

ctech

unread,
Apr 8, 2013, 2:50:38 PM4/8/13
to open...@googlegroups.com
this is the bill of materials/flow chart for the kit, the asembled
version is almost indetical
OpenDroid.png

Robert Lefebvre

unread,
Apr 8, 2013, 2:55:08 PM4/8/13
to open...@googlegroups.com
Hi, I ordered the "unassembled" kit, but I don't know what that actually means.  What will I get exactly?  Will I have to buy more stuff?  How much assembly?  I'd be willing to upgrade to full assembled depending on answers.

Thanks,
Rob


On 8 April 2013 14:50, ctech <ctec...@gmail.com> wrote:
this is the bill of materials/flow chart for the kit, the asembled
version is almost indetical

--
You received this message because you are subscribed to the Google Groups "OpenGrab" group.
To unsubscribe from this group and stop receiving emails from it, send an email to opengrab+u...@googlegroups.com.
To post to this group, send email to open...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.



ctech

unread,
Apr 8, 2013, 3:10:10 PM4/8/13
to open...@googlegroups.com
your willing to upgrade depending on the answer, well you assembling
it is so complicated that you should not attempted it unless you are
an engineer with 15 years of experience....

jokes aside, i am in the process of photographing all the steps
involved in the assembly so hang tight

healthyfatboy

unread,
Apr 9, 2013, 8:51:49 AM4/9/13
to open...@googlegroups.com
I too am interested in this question. I'll be watching to see how things go!
Reply all
Reply to author
Forward
0 new messages