I wish I could join Ryan, Hannes, and Shahid in enjoying the sites
around Chicago today but I still have work to be done. Here is
a list of the tests I have completed so far below.
Here is a bit of trivia to consider while reviewing the tests below. The
temperature this morning was a balmy 15F / -9 C and with the
window blowing between 15-20 mph, the weather report claims that it
feels like 1F / -17 C.
Consistent Time <No Peer Required>
PDQ Continuations
Tiani Cisco
Karos Rialto
PDQ Exact Name
Tiani Cisco
Leafsprout DHS
Perceptive
Karos Rialto
PDQv3 Exact Name
Tiani Cisco
PACS Gear
Perceptive
Leafsprout DHS
Intersystems
PDQ Multiple Query
Perceptive
Tiani Cisco
Karos Rialto
Leafsprout DHS
PDQv3 Multiple Query
Tiani Cisco
PACS Gear
Perceptive
Leafsprout DHS
PIX/PDQ Load
<No Peer Required>
PIX Query
Regenstrief
Perceptive
GE Centricity
Tiani Cisco
LeafSprout DHS
PIX Manager Config
<No Peer Required>
PIXv3 Client
Intersystems
Tiani Cisco
Perceptive
Leafsprout DHS
PIXv3 Feed
Tiani Cisco
--
Odysseas Pentakalos, Ph.D., PMP
Chief Technology Officer
SYSNET International, Inc.
2930 Oak Shadow Drive
Oak Hill, Virginia 20171
mailto:
odys...@sysnetint.com
(703) 855-2029