IMPORTANT : Regarding Instruments turn on procedure after locked down

8 views
Skip to first unread message

Mk Jayaraj

unread,
Jul 7, 2020, 2:08:29 AM7/7/20
to oed...@googlegroups.com
VERY IMPORTANT PLEASE FOLLOW THE INSTRUCTIONS
jayaraj


Please see the instructions from Navneethan regarding the operation of instruments after long shutdown.
I had forwarded the mail from Navneethan LSS before also. regarding the special care you have to take care.
Please strictly follow the procedure. 

Dear Mr.Navneethan,

We had followed the procedure. I was back in office in April 27. The students ( few)who are staying the campus was visiting the lab since first week of May.  Raman was up in Mid of may. The present situation might have occured since the heavy rain started. We have put two dehumidifiers and Raman is installed in a small room and the temperature is 22. and when it starts operation it comes close to 23.
How ever i have warned the students to take special care and strictly follow the procedure
jayaraj



---------- Forwarded message ---------
From: Navaneethan <k...@laser-spectra.com>
Date: Tue, Jul 7, 2020 at 10:43 AM
Subject: Regarding Instruments turn on procedure after locked down
To: <m...@cusat.ac.in>, Anoop K K <ano...@cusat.ac.in>, Dept of Physics CUSAT <phys...@gmail.com>, <manojn...@gmail.com>, Midhun P Sathyan <midhunpsa...@gmail.com>
Cc: Morrison Sajjanam Morrison <fem...@gmail.com>


Dear Sir,

 

We hope you are all doing well.

All are now ready to go back to our labs.

So we want to give you the following advice.

Please follow it as strictly as possible.

 

1) For Laser Labs :

Switch on the AC only and leave it for may be two days.

This depends upon the size of the lab. Bigger labs more time. Also if you have dehumidifier please run along with AC.

Try to monitor the temp and the AC itself as the AC may get damaged or catch fire.

 

2) After 2 or 3 days make sure first all the instruments are off. Please check it.

Then switch on only the UPS. Allow the UPS to charge for half day.

Do not turn on any instrument.

After half day or one day you are ready to turn on the power of each unit one by one.

Watch for any abnormal behavior or smell from the power supply or anywhere else.

This is important.

 

3) All other labs who don't have any lasers only Spectrometers etc.. may also do the same procedure.

Only difference may be you don't have to wait for 2 or 3 days after turning on the AC .

 

4) We have waited for nearly 2 months. So waiting one or 2 days more will not make any difference. So please take time to switch on your instruments. If you need any more details or clarifications in this regard, please do contact us.

 

Good luck.

Regards,

Morrison


---------------------------------------------------------------------
Laser Spectra Services India Pvt Ltd.,
80/10, Ist Floor, Raj Towers,
M.S.Ramaiah Main Road,
Mathikere, Bangalore - 560 054.

Ph: +91-(0)80-23576 907,
Fax No. +91-(0)80-23576 904
Email: k...@laser-spectra.com

Office : ad...@laser-spectra.com
------------------------------------------------------------------

 



--


--
Dr.M.K.Jayaraj
Professor, Head
Department of Physics,
Dean, Faculty of Environmental Studies
Cochin University of Science and Technology


--


--
Dr.M.K.Jayaraj
Professor, Head
Department of Physics,
Dean, Faculty of Environmental Studies
Cochin University of Science and Technology


--
Dr.M.K.Jayaraj
Professor,
Department of Physics
Cochin University of Science and Technology