You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to ns-3-...@googlegroups.com
Hello Marco,
I have already posted a mail regarding ABS implementation. You have given me some ideas regarding its implementation. Now I have implemented ABS as follows, 5 th and 10th sub-frames are selected as the ABS frame. In RR scheduler I skipped the scheduling of UE if the frame is 5 or 10 by making code changes in DoSchedDlTriggerReq. Only HARQ retransmission alone is done in this frame. Then I changed the CQI calcultion to be based on data frame by making changes in lte-helper, LteSinrChunkProcessor and lte-ue-phy. But even after implementing this my cqi and mcs in not changing in mac trace. Is there any othre way I can check this (that the data frame is not scheduled to any user). Do I have to make any more changes to make CQI calculation work fine.
Curretly I am testing with a simple scenario with 1 enb and 1 UE and checking whether any changes in CQI calculation during ABS frame ( 5 and 10 in my case).
Thanks & regards Archana
mailm...@gmail.com
unread,
Mar 29, 2014, 4:13:44 AM3/29/14
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message