NOTAM
Methodist Mansfield Medical Center – FAA Identifier 0XA9
2700 E Broad Street
Mansfield, TX 76063
N32-34.033500 x W097-05.735333
Date – Saturday July 26th, 2025
Hours – 09:00 – 16:00
Where – 0XA9 – Methodist Mansfield Medical Center
Project – OR10 AHU Screen Wall Delivery
Overview – This project is to lift steel for a new screen wall for the AHU from ground floor to the roof.
Crane – National – NBT60XL
Boom – 132’
Radius – 95’
* Our Helipad will remain open as this crane will be operating on the South side of the Facility and will communicate to the crane operator directly for any incoming/outgoing flights.
Please see attached crane information for details.
Thank you,
Alisa Carlson
Senior Project Manager
Methodist Health System
Planning, Design, and Construction
403 W. Campbell Road
POB I; Ste #205
Richardson, Texas 75080
O: 469-204-6702
C: 214-794-0425
***********************************************************************
This electronic transmission contains information from Methodist Health
System and should be considered confidential and privileged. The
information contained in the above messages is intended only for the
use of the individual(s) and entity(ies) named above. If you are not the
intended recipient, be aware that any disclosure, copying, distribution,
or use of this information is prohibited. If you receive this transmission
in error, please notify the sender immediately by return e-mail.
Methodist Health System, its subsidiaries and affiliates hereby claim all
applicable privileges related to the transmission of this communication.