2/17/2025 - 3/3/2025 Updates

1 view
Skip to first unread message

Maristella Heo

unread,
Mar 3, 2025, 9:53:19 PM3/3/25
to northwestern-...@googlegroups.com
Winter Newsletter - 3.3.2025

Copy of DCP_8809 (2).jpg Copy of DCP_8817 (2).jpg

The electrical side of the team has been busy working to hit the electrical integration deadline. They've been validating that drive critical components can all function with one another on the bench. The electronic control unit has been deemed ready for driving, and the team is working to finalize testing for assembly onto the car.

Copy of DCP_8755 (2).jpg Copy of DCP_8679 (2).jpg

On the mechanical side, Accumulator adhered the rear mounts onto the accumulator container. The subteam is almost at the point where they can discharge the battery and deliver high voltage and current. Accumulator also made great progress on the LV battery and spot welded the cells over the weekend. Meanwhile, Suspension is remachining new front uprights, and Chassis is starting to machine the pedalbox. Aerodynamics received molds from Stratasys, so they have begun preparations to cure parts for the wings.
Reply all
Reply to author
Forward
0 new messages