A construction project's complexity can lead to unexpected issues and costs. In Navisworks Simulation 2022, you can simulate your project in virtual reality. This technique increases productivity and prevents failures.
Link object movement with both TimeLiner and Clash Detective together for full time-based interference checking. Scheduling the moving of a crane on-site could coincide with the delivery of construction materials, all simulated in Autodesk NavisWorks Manage 2009, all checked for scheduling and interference issues, all adding up to a powerful, automated workspace simulation and planning tool.
Autodesk is now shipping the 2009 versions of its comprehensive software solutions for building information modeling (BIM) including Revit Architecture, Revit Structure, Revit MEP, AutoCAD Civil 3D, and Autodesk NavisWorks software solutions. BIM is an integrated workflow built on coordinated, reliable information about a project from design through construction and into operations. By adopting BIM, architects, engineers, contractors and owners can easily create coordinated, digital design information and documentation; use that information to more accurately visualize, simulate, and analyze performance, appearance and cost; and reliably deliver the project faster, more economically and with reduced environmental impact. The 2009 Autodesk BIM Solutions include:
Autodesk NavisWorks 2009 software solutions (Autodesk NavisWorks Review, Autodesk NavisWorks Manage, Autodesk NavisWorks Simulate, and Autodesk NavisWorks Freedom) improve coordination, collaboration, and project sequencing for design and construction projects. With the 2009 versions of the Autodesk NavisWorks solutions, users can aggregate design models and data from documents created on both Autodesk and non-Autodesk software applications; develop more comprehensive views of projects and analyze for clash detection; and make better design and construction decisions. www.autodesk.com/navisworks
aa06259810