James Logie 104

3 views
Skip to first unread message

Nguyet Edmondson

unread,
Jul 24, 2024, 7:21:22 PM7/24/24
to nikola-discuss

One major piece of work involved a 16 month long removal project at these two six story buildings (12 floors in total). Materials removed included millboard, asbestos rope, glazing putty, mastic, bitumen sealant, along with asbestos containing dust.

Mark and Felicity are a pleasure to work with. They managed the removal of asbestos from two of our older buildings first built in the 1970s. It was a substantial project throughout 5000 sq metres of six-storey buildings and had some uniquely tricky challenges. They came up with good removal methodologies, were excellent communicators and did a great job and all within the allocated time frame. MBC is on our panel of approved removalists and for good reason.

james logie 104


Download Filehttps://geags.com/2zLz46



All content on this site: Copyright 2024 Elsevier B.V. or its licensors and contributors. All rights are reserved, including those for text and data mining, AI training, and similar technologies. For all open access content, the Creative Commons licensing terms apply

4a15465005
Reply all
Reply to author
Forward
0 new messages