Eb2678 Revision P

0 views
Skip to first unread message

Agnella Datson

unread,
Aug 3, 2024, 3:07:13 PM8/3/24
to nforerpadar

EB 2678 Compliance ChecklistA. GENERAL1. Is the supplier aware that materials and workmanship forming part ofthis or any order, may be inspected and tested at any time and placebefore, during and after manufacture by Purchaser and/orGovernment Inspection? (2678J, Para. 8.1)Yes No N/A2. Is the supplier aware of specification effectivity requirements andthat the purchase order will denote the applicable specification anddrawing revisions, although not necessarily the latest available?(2678J, Para. 3.1)3. Is the supplier aware that any change to the design of the item(s)being procured under this purchase order will require the approval ofthe Purchaser? (2678J, Para. 4.1)4. Does the supplier understand that, in all cases, the purchase ordertakes precedence in conflicts and disputes, including existingspecification or drawing requirements? (2678J, Overview)B. APPLICABLE FORMS1. Has the supplier been instructed in the proper usage of VendorInformation Requests (VIR, EB Form 84-00-2205) for interpretations,drawings or specification changes, nonconforming acceptance andrepair welding authorization? (2678J, Para.1.1(a))2. Does the supplier understand that, when denoted in the purchaseorder, welding and NDT procedures, special processes andradiographic film require Purchaser approval as documented on aVendor Procedure Approval Request? (VPAR, EB Form 84-00-2974) (2678J, Para.1.1(b))January 2009 Page 1 of 8

EB 2678K Compliance Checklist A. GENERAL 1. Is the supplier aware that materials and workmanship forming part of this or any order, may be inspected and tested at any time and place before, during and after manufacture by Purchaser and/or Government Inspection? (2678K, Para. 8.1) Yes No N/A 2. Is the supplier aware of specification effectivity requirements and that the purchase order will denote the applicable specification and drawing revisions, although not necessarily the latest available? (2678K, Para. 3.1) 3. Is the supplier aware that any change to the design of the item(s) being procured under this purchase order will require the approval of the Purchaser? (2678K, Para. 4.1) 4. Does the supplier understand that, in all cases, the purchase order takes precedence in conflicts and disputes, including existing specification or drawing requirements? (2678K, Overview) B. APPLICABLE FORMS 1. Has the supplier been instructed in the proper usage of Vendor Information Requests (VIR, EB Form 84-00-2205) for interpretations, drawings or specification changes, nonconforming acceptance and repair welding authorization? (2678K, Para.1.1(a)) 2. Does the supplier understand that, when denoted in the purchase order, welding and NDT procedures, special processes and radiographic film require Purchaser approval as documented on a Vendor Procedure Approval Request? (VPAR, EB Form 84-00- 2974) (2678K, Para.1.1(b)) October 2010 Page 1 of 8

c80f0f1006
Reply all
Reply to author
Forward
0 new messages