| Total 86 projects are covered in this issue.
| Updated between Jun 20-Jul 2, 2012
|
|
|
|
|
|
| Geocorn Bio products to set up starch products unit in West Godavari
|
|
Geocorn Bio products to set up starch products unit in West Godavari....Read More
|
|
| SABIC and Exxon Mobil Chemical JV to develop a synthetic rubber project in Jubail
|
|
SABIC and Exxon Mobil Chemical jointly developing a synthetic rubber
project in Saudi Arabia. The project will be in Jubail, at the ...Read More
|
|
| Phillips Carbon Black
|
|
Phillips Carbon Black to set up a carbon black unit Thervoykandigai
Industrial Estate in Thiruvallur district to the north of Chennai....Read More
|
|
| Posh Chemicals plans to set up a chemical project at Talamadla
|
|
Posh Chemicals plans to set up a chemical substances unit at Talamadla,
Bikanoor. The company has signed an MoU with the state government....Read More
|
|
| Cosmo Films Plans to set up BOPP films unit in Aurangabad
|
|
Cosmo Films Plans to set up a Bi-axially Oriented Polypropylene Films
(BOPP) films unit with capacity of 53000 tpa at Shendra Industrial ...Read More
|
|
|
|
|
|
| Brilliant Bio Pharma to set up Vaccine unit in Medak dt
|
|
Brilliant Bio Pharma to set up Vaccine unit in Medak dt...Read More
|
|
|
|
|
|
| Development Of National Highways Road From Seopur Baroda Khwajapur At Bhopal:
|
|
The project envisages development of national highways road from Seopur
Baroda Khwajapur on BOT basis at Bhopal. The estimated cost ...Read More
|
|
| Construction of Major Bridge across River Indrawati (Length 630 Meter) Near Village Pattigudam: Bid
|
|
The project envisages construction of Major Bridge across River
Indrawati (Length 630 Meter) Near Village Pattigudam in Maharastra.The ...Read More
|
|
| Construction of Foundation and Substructure of Major Bridge No 53 at Guwahati: Bid invited.
|
|
The project envisages construction of Foundation and Substructure of
Major Bridge No 53 at Guwahati. The estimated cost is Rs. 77,80,52,288/...Read More
|
|
| Construction of Foundation and Substructure of Major Bridge No.44 at Guwahati: Bid invited
|
|
The project envisages construction of Foundation and Substructure of
Major Bridge No.44 at Guwahati. The estimated cost is Rs. 89,54,14,637/...Read More
|
|
| Construction of Major Bridge across Warana River on Near Village Sawarde at Kolhapur: Bid invited
|
|
The project envisages construction of Major Bridge across Warana River
on Near Village Sawarde at Kolhapur. The estimated cost is ...Read More
|
|
| Construction of Major Bridge across River Malaprabha at Hubli: Bid invited for Bridge Cons.
|
|
The project envisages construction of Major Bridge across River Malaprabha at Hubli. The estimated cost is Rs. 27,14,86,798/-...Read More
|
|
| Construction of Major Bridges No.207 and 210 at Ernakulam : Bid invited for bridge construction.
|
|
The project envisages construction of Major Bridges No.207 And 210 at Ernakulam. The estimated cost is Rs. 12.16 Crores....Read More
|
|
| Construction of Major Bridge across Kukadi River at Km 87/100 Near Village Pimpalwandi at Pune: Bid
|
|
The project envisages construction of major bridge across Kukadi river
at km 87/100 near village Pimpalwandi on Pune Mashik road NH ...Read More
|
|
| Four Laining and Strengthening of Pune-Solapur- Hydrabad at Pune: Bid invited for 4 lanning
|
|
The project envisages four lanning and strengthening of Pune-Solapur-
Hydrabad Road N. H. 9 KM 8/800 to 1400 (E-tender No. 51).The ...Read More
|
|
| Construction of Major Bridge at Km 227/10 Of NH 208 In The State of Tamil Nadu at Tirunelveli: Bid
|
|
The project envisages construction of major bridge at km 227/10 of nh
208 in the state of Tamil Nadu. The estimated cost is Rs.5,77,30,000/...Read More
|
|
| Four Laning of Jorhat to Demow Section from Km 453.000 at New Delhi: Bid invited.
|
|
The project envisages four laning of Jorhat to Semow section from KM 453. 000 to KM 534,800 (design Chainage) of NH-37....Read More
|
|
| Construction of HL Bridge at 104, 100, 118, 950 Etc Of N.h 75 at Medininagar: Bid invited .
|
|
The project envisages construction of HL bridge at 104, 100, 118, 950
etc of n. H 75 at Medininagar. The estimated cost is Rs. 15,36,46,740/-...Read More
|
|
| Development Of National Highways Road From Four Laning Of Rewa Sidhi NH 75-E : Bid invited.
|
|
The project envisages development of national highways road from four
laning of Rewa Sidhi NH 75-E on BOT basis at Bhopal. The estimated ...Read More
|
|
| Development Of National Highways Road From Jaithari Rajendragm To Daramadas At Bhopal : Bid invited.
|
|
The project envisages development of national highways road from
Jaithari rajendragm daramadas, Karthua Chitrangi and Meohari Manpur ...Read More
|
|
|
|
|
|
| Nagarjuna Fertilizers is planning a Biological Hydrogen at Medak
|
|
agarjuna Fertilizers is planning a Biological Hydrogen at Wargal in Medak dt....Read More
|
|
|
|
|
|
| Moolchand Healthcare Ltd
|
|
Moolchand Healthcare plans to expand the current campus to over 1,000
beds and six specialty hospitals. In the first phase, the ...Read More
|
|
|
|
|
|
| NCL Industries to set up Clinker unit at Nalgonda dt : IEM filed
|
|
NCL Industries to set up Clinker unit at Simhapuri in Nalgonda dt...Read More
|
|
|
|
|
|
| Botad Branch Canal project: L&T bags Pump station project
|
|
The project envisages construction of distributaries and minors for the
Command Area under Botad Branch Canal ch. 22.605 to 59.152 ...Read More
|
|
|
|
|
|
| ITC is settinng up Grand Chola in Chennai
|
|
ITC is coming up with a 600 room hotel in Chennai on 160,000 sq. ft area. The ITC Grand Chola will have the largest convention ...Read More
|
|
| Sarovar Hotels is implementing the 'Golden Heights' Hotel Project in Karnataka
|
|
Sarovar Hotels is implementing the 120 rooms, 'Golden Heights' hotel
project at Rajaji Nagar, dist. Bangalore, Karnataka. Civil work ...Read More
|
|
| Sarovar Hotels and Resorts plans to set up three star hotel in chennai
|
|
Sarovar Hotels and Resorts is coming up with a three star budget hotel
under its 'Hometel' brand in Chennai with an investment of ...Read More
|
|
| Sarovar Hotels & Resorts is developing a hotel 'Balaji Sarovar Portico' in Solapur
|
|
Sarovar Hotels & Resorts is developing a hotel 'Balaji Sarovar
Portico' in Solapur district of Maharashtra. The hotel comprises ...Read More
|
|
| Sarovar Hotel is Developing " Park Plaza Hotel " at Jalandhar
|
|
Sarovar Hotel is Developing " Park Plaza Hotel " at Jalandhar....Read More
|
|
| Sarovar Hotel is Developing " Park inn " at Siliguri
|
|
Sarovar Hotel is Developing a property " Parkinn " at Siliguri....Read More
|
|
|
|
|
|
| Bonfiglioli is planning set up its second manufacturing plant at Mannur
|
|
Bonfiglioli is planning set up its second manufacturing plant at Mannur near Chennai.
...Read More
|
|
| Grace Infrastructure Pvt Ltd
|
|
Grace Infrastructure to take up expansion of its bolts and nuts capacity
from 260 million pieces per year at Thiruchitrambalam, Vanur ...Read More
|
|
| Toyota Kirloskar Auto Parts to establish castings and machining of engine parts facility
|
|
Toyota Kirloskar Auto Parts Ltd to establish castings and machining of
engine parts, adjacent to its existing plant in Bidadi industrial ...Read More
|
|
| Ykz Zip Fastners plans to manufacture Zip Fasteners in North 24-Paragans
|
|
Ykz Zip Fastners plans to manufacture Zip Fasteners Non Metalic, Zip Fasteners Metallic in North 24-Paragans....Read More
|
|
| Motherson Sumi Systems plans an Wiring harness unit in Kancheepuram
|
|
Motherson Sumi Systems plans to set up an integrated Wiring/Harness unit in Kancheepuram....Read More
|
|
| Sundaram Clayton to expand its Padi and Mahindra world city units
|
|
Sundaram Clayton plans capacity expansion at its plant located at Padi
and Mahindra World City. The company has recently commissioned ...Read More
|
|
|
|
|
|
| Avon India, is planning to set up its second unit : Scouting for location in South
|
|
Avon India, is planning to set up its second manufacturing unit in India
with an investment of $8 million in the next three years. The ...Read More
|
|
|
|
|
|
| Harley Davidson to setup manufacturing plant in India
|
|
Harley Davidson to setup manufacturing plant in India. Harley Davidson
team from the US has been doing rounds of preliminary assessment ...Read More
|
|
|
|
|
|
| UPSIDC to set up Mega food park in Lucknow
|
|
UPSIDC to to set up a Mega Food Park spread
over 100 acre in Lucknow...Read More
|
|
| Keventer Agro Ltd plans to develop a mega food park at Bhagalpur.
|
|
Keventer Agro Ltd plans to develop a mega food park at Bhagalpur....Read More
|
|
|
|
|
|
| Acalmar Oils & Fats to set up Vegetable Oils unit
|
|
Acalmar Oils & Fats to set up Vegetable Oils unit at Surayaraopet East Godavari dt....Read More
|
|
|
|
|
|
| Pravesha Industries is planning a HDPE drums and bottles unit at Medak Dt
|
|
Pravesha Industries is planning a HDPE drums and bottles unit at Medak Dt...Read More
|
|
|
|
|
|
| Sujana Metal Products to set up bars and Chirset unit in Mababoob Nagar
|
|
Sujana Metal Products to set up bars and Chirset unit in Mababoob Nagar....Read More
|
|
| Tecpro Systems Ltd plans to set up Iron angels and channels unit in Alwar
|
|
Tecpro Systems Ltd plans to set up a Angles Channels Square Flat Rounds
Tiron Beam, Shape & Section Of Iron & Non Alloy Steels, unit ...Read More
|
|
| NMDC to set up interplant pipeline and gas mixing and boosting station at Nagarnar project
|
|
The project envisages setting up of an interplant pipeline and gas
mixing and boosting station for 3.0 MTPA integrated steel plant ...Read More
|
|
| Vallabh Tinplate
|
|
Vallabh Tinplate Pvt Ltd is planning to sett up CR coil manufacturing unit at Village Beopror near Patiala....Read More
|
|
| KISCOL plans to set up a sponge iron unit
|
|
Kannappan Iron and Steel Company Ltd plans to set up a sponge iron unit
with capacity of 5000 tpm along with 12 MW coal based power ...Read More
|
|
| Super Ispat Udyog
|
|
Super Ispat Udyog plans to set up a hot rolled steel unit with a
capacity of 50,000 tpa at Kanganwal. The work is likely to start ...Read More
|
|
| Indian Technomac to set up a Ferro Chrome unit in Sirmur
|
|
Indian Technomac to set up a unit for Low Carbon/ Medium Carbon/ High
Carbon/ Ferro Chrome/ Slag production unit in Sirmur. The ...Read More
|
|
|
|
|
|
| Talluri Textyles to set up Coton Yarn unit in Khammam dt
|
|
Talluri Textyles to set up Coton Yarn unit in Khammam dt....Read More
|
|
| Cheran Weaves India plans a cotton weaving and finishing unit
|
|
Setting up a unit for weaving and finishing of cotton textiles at
Namakkal. The work is underway and completion is targeted in ...Read More
|
|
|
|
|
|
| Dalmia Laminators is to set up an HDPE & PP Woven Sacks unit
|
|
Dalmia Laminators is to set up an HDPE & PP Woven
Sacks , a Plastic Processing And Packaging manufacturing unit in Thiruvallur....Read More
|
|
|
|
|
|
| Indocon developers plans a sugar mill in Ahmednagar
|
|
Indocon developers plans a sugar mill at Rashin in Ahmednagar dt....Read More
|
|
| Shree Tatyasaheb is setting up sugar project in Kolhapur
|
|
Shree Tatyasaheb Kore Warana is planning to set up a Sugar mill at Warananagar in Kolhapur....Read More
|
|
| Parvati Sweeteners plans a a sugar project at Sankhnee, Bhitarwar dist
|
|
Parvati Sweeteners Setting up a sugar unit with capacity of 1800 tccpd at Sankhnee, Bhitarwar dist....Read More
|
|
|
|
|
|
| Ranjani Sugar plans a Baggase based Cogen unit in Sangli
|
|
Ranjani Sugar plans a Baggase based Cogen unit in Sangli....Read More
|
|
| Tridhara Sugar to set up Cogeneration unit in Parbhani
|
|
Tridhara Sugar to set up Cogeneration unit in Parbhani....Read More
|
|
| ACB India is developing a 1,200 MW coal-based thermal power plant in Sidhi
|
|
ACB India is developing a a 1,200 MW coal-based thermal power plant in
the Sidhi district, Madhya Pradesh. The power project will ...Read More
|
|
| ACB India is setting up a coal based power project at Champa-Janjgir
|
|
developing a 1,200 MW coal-based thermal power plant in the
Champa-Janjgir district, Chhattisgarh. The power project will be
commissioned ...Read More
|
|
| ADWEA to set up a gas based power plant in Mirfa : Project approved
|
|
Abu Dhabi has approved the construction of a 1500 megawatt power plant
in Mirfa on build own and operate basis. The project comprises ...Read More
|
|
| Reliance Power to setup power plant in Butibori : Commissioned
|
|
Reliance Power Limited, a subsidiary under Reliance Anil Dhirubhai
Ambani Group will setup captive power plant at Butibori town in ...Read More
|
|
| Kameng Dam Hydro Power project : MOEF refuses project location
|
|
The project is 420 MW run of river hydro electric envisaged on kameng
river in East Kameng district. Presently, the project is ...Read More
|
|
| Bithnok lignite mine cum power project :
|
|
Neyveli Lignite Corporation to set up 250 MW thermal plant at Bithnok in
Bikaner district of Rajasthan and it will use CBFC technology ...Read More
|
|
| Pacific Iron plans a captive power plant at Jabalpur project
|
|
PIML plans to set up a 70-MW captive power project in Madhya Pradesh.
The project is part of its proposed integrated steel plant in ...Read More
|
|
| CESC plans three super-critical power projects at Balagarh
|
|
CESC plans three super-critical power
projects of 660 MW each at Balagarh....Read More
|
|
| Hargarh Power to set up WHR based Thermal Project at Jabalpur.
|
|
Hargarh Power Pvt Ltd to set up a new Thermal Project at Jabalpur. The project is WHR based project from sponge iron plant....Read More
|
|
| AP Genco to take up Vadarevu TPP Stage-I
|
|
AP Genco to take up 1600 MW Vadarevu TPP
Stage-I. The project is in nascent stage...Read More
|
|
| Muzaffarpur TPP stage II: Techpro bags Ash Handling System package
|
|
Kanti Bijlee Utpadan Nigam, a joint venture formed by NTPC and Bihar
State Electricity Board, has taken up the expansion of the Muzaffarpur ...Read More
|
|
| NTPC to implement Mouda STPP: Elecon bags Coal handling package
|
|
National Thermal Power Corporation is implementing a Mauda STPP (2x500
MW) in Nagpur district of Maharashtra. BHEL has been appointed ...Read More
|
|
| Vindhyachal STP Project (Stage-IV) : BHEL Bags Main plant package
|
|
NTPC will set up Vindhyachal Super Thermal Power Project (Stage-IV) at
Vindhyachal, District Sidhi of Madhya Pradesh. The project ...Read More
|
|
| AP Power Gen plans to set up a Thermal Power project at Sattupally.
|
|
AP Power Gen plans to set up 600 MW Thermal Power plant at Sattupally.
...Read More
|
|
| Jindal super Thermal project Phase I: L&T Bags Switchyard package
|
|
Jindal Power is implementing a coal based thermal power plant at Raigarh in Chhattisgarh. Jindal Power a leading metallurgical ...Read More
|
|
| AP Power Genp plans to set up Integrated Gasification Combined Cycle Power Plant
|
|
AP Power Generation plans to set up 182 MW Integrated Gasification
Combined Cycle Power Plant at Dr. Narla Tata Rao TPS. The project ...Read More
|
|
|
|
|
|
| Mahanadi Coalfields Ltd to set up washery at Balaram opencast mine site
|
|
Mahanadi Coalfields Ltd to set up 10 MTPA washery at the site of the
Balaram opencast project (OCP) with raw coal linkage from Hingula ...Read More
|
|
|
|
|
|
| ONGC to Revamp of Gas Compression plant at Galeki
|
|
ONGC will execute the Revamp of Gas Compression plant at Galeki, Assam
on turnkey basis. The project includes revamp of existing ...Read More
|
|
|