Er I think I have the same problem.
So, suppose I am my All Active Tasks view and I add a new task called say "Test01".
And then I hit "Alt/S" that takes me to the start date for Test01
I then hit say "3D" then Enter, this puts the task 3 days into the future and therefore OFF my Active Tasks view!
Meanwhile so now the properties pane/window on the right still shows the properties for "Test01", although the list of tasks in the center of the page (correctly) no longer shows Test01.
But how can I now go back to the next task in the list ? (i.e. in the middle of the page on what is still my Active Tasks)
I tried hitting right arrow and/or left arrow, but this simply moves my cursor withing the Start Date field. ==> no use
If I hit Alt/Left arrow, I am taken to the previous item in the middle of the page, however only with a GREY background. i.e. it doesnt seem to be fully selected(!)
The only thing I can find is to also then hit Alt/1 and that turns the task into being fully selected (and so has a mid-blue background).
OK so this has the desired effect without using my mouse (the whole point!)... however this is a lot of keystrokes, and nothing else will do apparently.
i.e. To recap I need to hit Alt/LeftArrow and then Alt/1.
This is very fiddly!
Strangely just hitting Alt/1 without hitting Alt/LeftArrow doesnt work.
J
Surely there has to be a single hotkey to get me back to the main list, no?