Mike Schroepfer wrote:
> Hey Folks,
>
> I've updated the Bon Echo Status meeting notes:
>
> http://wiki.mozilla.org/Firefox2/StatusMeetings/2006-09-19
>
> Of note:
>
> 1) We can have grace period for the l10n pull to 5PM PDT Today Sept 19
> 2006. This is the latest we can pull from l10n without pushing back
> the RC1 schedule. Axel will manage any critical l10n landings between
> now and 5PM. After that we are closed for l10n.

Went through the current list of approval requests.

Schrep, we didn't get to the point of Thunderbird and Calendar, are you
going to follow up on that?

> 2) Given the code freeze time and l10n pull our target range for
> releasing RC1 is next week. This is the time required to complete l10n
> builds, testing, updates and testing, staging, etc. and assumes we don't
> run into any show stopper bugs.
>
> 3) We'll be doing a Major update test later today. All of the changes
> required on the server side have been completed. Look to Preed/Seth for
> more information on this later today...
>
> 4) We'll continue to hold the 10AM PDT time every day for bug triage and
> any project issues. #bonecho or 650-903-0800x91, conf 8602. Please
> join if you have any pressing issues requiring discussion.
>
> 5) Don't hesitate to post here or join a meeting if you have anything to
> discuss.
>
> Overall FF2 RC1 is looking really great!
>

Axel

Mike Schroepfer

unread,
Sep 19, 2006, 5:35:18 PM9/19/06
to Axel Hecht
> Schrep, we didn't get to the point of Thunderbird and Calendar, are you
> going to follow up on that?
>

Yes. Toolkit/core gecko is both code and l10n frozen on the 1.8
branch. Changes in code or l10n specific to mailnews or calendar are
still permitted given the appropriate reviews/approvals by those teams.

Cheers,

Schrep