Fw: Mosswood NTP for Basketball Courts

10 views
Skip to first unread message

Westbrook, Terri

unread,
Jun 13, 2025, 3:50:52 PMJun 13
to Mosswood Park RAC, mosswood-park-rac, Mosswood Community Garden
Hello Mosswood Supporters,

We received the Notice to Proceed to renovate the basketball courts in June 2025. 

Sincerely,

Terri Westbrook 

Center Director 

Mosswood Recreation Center 

3612 Webster Street 

Oakland, CA  94609 

(510) 597-5038 - Phone 

(510) 882-4369 - Cell 

 

Imagine, Inspire, Invest…Experience Oakland with Us! 

“You can discover more about a person in an hour of play than in a year of conversation.” - Plato.  

 

This message and all attachments are intended only for the recipient(s) listed above and may contain CONFIDENTIAL AND PRIVILEGED information.  If you have received this message in error, please destroy all electronic and paper copies and inform the sender.  Thank you.


From: Kennedy, Amber <AKen...@oaklandca.gov>
Sent: Friday, June 13, 2025 12:46 PM
To: Williams, Quincy <QWil...@oaklandca.gov>; Evan Schwartz <ESch...@warriors.com>; Xie, Wei <WX...@oaklandca.gov>; Westbrook, Terri <TWest...@oaklandca.gov>; Hernandez, Thomas <THern...@oaklandca.gov>
Cc: Ziggy Pastwa <zi...@creativesportsconcepts.com>; Mike Taylor <mi...@creativesportsconcepts.com>; Chtaini, Mostafa, <MCht...@oaklandca.gov>
Subject: RE: Mosswood
 

Hi Quincy,

 

Yes, the NTP date is set for June 17, 2025. The NTP will be formally issued to all parties by our office administrative staff, likely on Tuesday morning. I’ve attached a preliminary copy here for your reference.

 

Moving forward, I’ll be your primary point of contact from the construction management side, so if anything comes up that I can assist with, please let me know!

 

Thank you and happy Friday!

 

Amber Kennedy

Resident Engineer

Bureau of Design and Construction

City of Oakland  |  Oakland Public Works Department  |  APWA Accredited Agency

250 Frank H. Ogawa Plaza, Ste. 4314  |  Oakland, CA  94612

Phone: (510) 423-8629  |  Email: AKen...@oaklandca.gov

 

From: Williams, Quincy <QWil...@oaklandca.gov>
Sent: Friday, June 13, 2025 11:26 AM
To: Evan Schwartz <ESch...@warriors.com>; Xie, Wei <WX...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>; Westbrook, Terri <TWest...@oaklandca.gov>; Hernandez, Thomas <THern...@oaklandca.gov>
Cc: Ziggy Pastwa <zi...@creativesportsconcepts.com>; Mike Taylor <mi...@creativesportsconcepts.com>; Chtaini, Mostafa, <MCht...@oaklandca.gov>
Subject: Re: Mosswood

 

Hi Evan,

 

That covers it...also, you will look at additional security measures for July 4th weekend. 

 

@Xie, Wei, can we get NTP for 6/17/2025 disseminated? Work will take approximately 4 weeks.

 

@Hernandez, Thomas, just in case/backup, does OPW have a generator for use at the site? Terri stated that the power at the fieldhouse sometimes fluctuates/not steady. If so, I will personally be responsible for its delivery and return if available.

 

Thanks,

 

Quincy Williams

Assistant Capital Improvement Project Coordinator

Parks, Recreation and Youth Development

250 Frank H. Ogawa Plaza Suite 3330

Oakland, CA 94612

 


From: Evan Schwartz <ESch...@warriors.com>
Sent: Friday, June 13, 2025 10:58 AM
To: Williams, Quincy <QWil...@oaklandca.gov>; Xie, Wei <WX...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>; Westbrook, Terri <TWest...@oaklandca.gov>; Hernandez, Thomas <THern...@oaklandca.gov>
Cc: Ziggy Pastwa <zi...@creativesportsconcepts.com>; Mike Taylor <mi...@creativesportsconcepts.com>; Chtaini, Mostafa, <MCht...@oaklandca.gov>
Subject: RE: Mosswood

 

Hi All – Quincy, Terri, the Creative Sports team and I had a chance to connect this morning, wanted to provide a few updates:

 

  • Mike and Creative Sports will provide a final work schedule asap. Actual start date is still TBD for now, but likely mid-to-late next week or possibly 6/23.

 

  • Creative Sports will be able to put up temporary construction fencing to cordon off the basketball court area for the duration of the project.
    • They will also remove the basketball rims/nets first thing, which will hopefully dissuade people from using the court.

 

  • Once we have the final work schedule, Terri will email the RAC those updates so the broader community is aware.

 

@Williams, Quincy please let me know if I left anything out. Thanks again everyone, we’re very excited to get this project going.

 

Best,
Evan

 

Evan Schwartz

Senior Director, Golden State Community Foundation

Golden State

 

415.604.1892 (office)

goldenstate.com

Golden State Banner

 

 

From: Williams, Quincy <QWil...@oaklandca.gov>
Sent: Wednesday, June 11, 2025 5:56 PM
To: Xie, Wei <WX...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>; Westbrook, Terri <TWest...@oaklandca.gov>
Cc: Ziggy Pastwa <zi...@creativesportsconcepts.com>; Evan Schwartz <ESch...@warriors.com>; Mike Taylor <mi...@creativesportsconcepts.com>; Chtaini, Mostafa, <MCht...@oaklandca.gov>
Subject: Re: Mosswood

 

Hi Wei, I will confer with Evan. @Evan, let's discuss. Thanks, Quincy Sent via the Samsung Galaxy A13 5G,an AT&T 5G smartphone Get Outlook for Android From: Xie, Wei <WXie@oaklandca.gov> Sent: Wednesday, June 11, 2025 2:59:29 PM To:

Hi Wei,

 

I will confer with Evan.

 

@Evan, let's discuss.

 

Thanks,

 

Quincy 

 

Sent via the Samsung Galaxy A13 5G,an AT&T 5G smartphone
Get Outlook for Android

 


From: Xie, Wei <WX...@oaklandca.gov>
Sent: Wednesday, June 11, 2025 2:59:29 PM
To: Williams, Quincy <QWil...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>; Westbrook, Terri <TWest...@oaklandca.gov>
Cc: Ziggy Pastwa <zi...@creativesportsconcepts.com>; Evan Schwartz <ESch...@warriors.com>; Mike Taylor <mi...@creativesportsconcepts.com>; Chtaini, Mostafa, <MCht...@oaklandca.gov>
Subject: RE: Mosswood

 

Yes, we can set the date for 06/17/2025.

Also, during the last meeting, we did NOT discuss the public outreach/notification. Will Creative Sports be setting up some form of block-off, such as caution tape, barricades, or signage, to prevent public use of the basketball court during the renovation (especially during the resurfacing of the ground)?

 

 

Hi Terri,
Would it be possible for OPRYD to inform the neighborhood and broader community about the upcoming basketball court renovation at the next Mosswood RAC Monthly meeting?

 

Thanks,

 

Wei Xie, P.E.

Supervising Civil Engineer, Construction Management Division

Bureau of Design & Construction

City of Oakland | Public Works Dept | APWA Accredited Agency

250 Frank H. Ogawa Plaza, Ste. 4314 | Oakland, CA  94612

Phone: (510) 238-3471 |Cell: (510) 852-3669| Fax: (510) 238-6633

WX...@oaklandca.gov

 

Report A Problem | Call OAK 311From outside Oakland: (510) 615-5566

311.oaklandca.gov | OAK...@oaklandnet.com | Mobile app: Apple or Android

 

 

From: Williams, Quincy <QWil...@oaklandca.gov>
Sent: Wednesday, June 11, 2025 2:43 PM
To: Xie, Wei <WX...@oaklandca.gov>; Chtaini, Mostafa, <MCht...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>
Cc: Ziggy Pastwa <zi...@creativesportsconcepts.com>; Westbrook, Terri <TWest...@oaklandca.gov>; Evan Schwartz <ESch...@warriors.com>; Mike Taylor <mi...@creativesportsconcepts.com>
Subject: Re: Mosswood

 

Hello Wei and Amber,

 

Can we have it for 6/17/2025?

 

Thanks,

 

Quincy Williams

Assistant Capital Improvement Project Coordinator

Parks, Recreation and Youth Development

250 Frank H. Ogawa Plaza Suite 3330

Oakland, CA 94612

 


From: Xie, Wei <WX...@oaklandca.gov>
Sent: Wednesday, June 11, 2025 2:38 PM
To: Williams, Quincy <QWil...@oaklandca.gov>; Chtaini, Mostafa, <MCht...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>
Cc: Ziggy Pastwa <zi...@creativesportsconcepts.com>; Westbrook, Terri <TWest...@oaklandca.gov>; Evan Schwartz <ESch...@warriors.com>; Mike Taylor <mi...@creativesportsconcepts.com>
Subject: RE: Mosswood

 

Yes, Amber will prepare and issue the NTP.

 

Just to confirm, based on our last meeting, is 06/23/2025 still a feasible date for the NTP?

 

Thanks,

 

Wei Xie, P.E.

Supervising Civil Engineer, Construction Management Division

Bureau of Design & Construction

City of Oakland | Public Works Dept | APWA Accredited Agency

250 Frank H. Ogawa Plaza, Ste. 4314 | Oakland, CA  94612

Phone: (510) 238-3471 |Cell: (510) 852-3669| Fax: (510) 238-6633

WX...@oaklandca.gov

 

Report A Problem | Call OAK 311From outside Oakland: (510) 615-5566

311.oaklandca.gov | OAK...@oaklandnet.com | Mobile app: Apple or Android

 

 

From: Williams, Quincy <QWil...@oaklandca.gov>
Sent: Wednesday, June 11, 2025 1:56 PM
To: Chtaini, Mostafa, <MCht...@oaklandca.gov>; Xie, Wei <WX...@oaklandca.gov>
Cc: Kennedy, Amber <AKen...@oaklandca.gov>; Ziggy Pastwa <zi...@creativesportsconcepts.com>; Westbrook, Terri <TWest...@oaklandca.gov>; Evan Schwartz <ESch...@warriors.com>; Mike Taylor <mi...@creativesportsconcepts.com>
Subject: Re: Mosswood

 

Excellent! Thanks Mo.

 

@Xie, Wei, could you disburse a Notice To Proceed?

 

Thanks,

 

Quincy Williams

Assistant Capital Improvement Project Coordinator

Parks, Recreation and Youth Development

250 Frank H. Ogawa Plaza Suite 3330

Oakland, CA 94612

 


From: Chtaini, Mostafa, <MCht...@oaklandca.gov>
Sent: Wednesday, June 11, 2025 1:54 PM
To: Williams, Quincy <QWil...@oaklandca.gov>
Cc: Xie, Wei <WX...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>; Ziggy Pastwa <zi...@creativesportsconcepts.com>; Westbrook, Terri <TWest...@oaklandca.gov>; Evan Schwartz <esch...@warriors.com>; Mike Taylor <mi...@creativesportsconcepts.com>
Subject: Re: Mosswood

 

Hi Quincy,

 

Nai Phan at the City Clerk's office has signed. You are good to go on our end. Please coordinate with Wei at CMD. 

 

Thanks,

 

Mostafa Chtaini | Administrative Analyst II

City of Oakland Capital Contracts Division

250 Frank H Ogawa Plaza, Oakland CA 94612

Tel: (510) 238-7252 Email: mcht...@oaklandca.gov

City of Oakland | Schedules, Contracts, and Compliance Forms

 


From: Williams, Quincy <QWil...@oaklandca.gov>
Sent: Wednesday, June 11, 2025 9:23 AM
To: Chtaini, Mostafa, <MCht...@oaklandca.gov>
Cc: Xie, Wei <WX...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>; Chtaini, Mostafa, <MCht...@oaklandca.gov>; Ziggy Pastwa <zi...@creativesportsconcepts.com>; Westbrook, Terri <TWest...@oaklandca.gov>; Evan Schwartz <esch...@warriors.com>; Mike Taylor <mi...@creativesportsconcepts.com>
Subject: Re: Mosswood

 

Hi Mo,

 

If I remember correctly, weren't we still waiting for the City Clerk's sign-off on record-keeping? Once that is completed, can we then have Wei issue a Notice To Proceed?

 

Thanks,

 

 

Quincy Williams

Assistant Capital Improvement Project Coordinator

Parks, Recreation and Youth Development

250 Frank H. Ogawa Plaza Suite 3330

Oakland, CA 94612

 


From: Evan Schwartz <ESch...@warriors.com>
Sent: Tuesday, June 10, 2025 10:30 AM
To: Westbrook, Terri <TWest...@oaklandca.gov>; Williams, Quincy <QWil...@oaklandca.gov>; Mike Taylor <mi...@creativesportsconcepts.com>
Cc: Xie, Wei <WX...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>; Chtaini, Mostafa, <MCht...@oaklandca.gov>; Ziggy Pastwa <zi...@creativesportsconcepts.com>
Subject: RE: Mosswood

 

Very helpful, thanks Terri. We will be sure to keep this in mind as we confirm the project schedule.

 

Quincy/Wei/Amber/Mostafa – could someone provide direction on next steps please?

 

Evan Schwartz

Senior Director, Golden State Community Foundation

Golden State

 

415.604.1892 (office)

goldenstate.com

Golden State Banner

 

 

From: Westbrook, Terri <TWest...@oaklandca.gov>
Sent: Tuesday, June 10, 2025 10:20 AM
To: Evan Schwartz <ESch...@warriors.com>; Williams, Quincy <QWil...@oaklandca.gov>
Cc: mi...@creativesportsconcepts.com; Xie, Wei <WX...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>; Chtaini, Mostafa, <MCht...@oaklandca.gov>
Subject: Re: Mosswood

 

Hello all, I am back! We started summer Town Camp yesterday. The camp is set up near the basketball courts for now. The Mosswood Meltdown concert is on Saturday, July 19th & Sunday, 20th. Please keep me in the loop pertaining to the project

Hello all, 

 

I am back!  We started summer Town Camp yesterday. The camp is set up near the basketball courts for now. The Mosswood Meltdown concert is on Saturday, July 19th & Sunday, 20th. Please keep me in the loop pertaining to the project start date. Thank you. 

 

The Mosswood Meltdown will only use only part of the Webster Street side of the park (the basketball court side). 95% of the concert will be on the Meadow Broadway side of the park. 

 

Sincerely, 

 

Terri Westbrook 

Center Director 

Mosswood Recreation Center 

3612 Webster Street 

Oakland, CA  94609 

(510) 597-5038 - Phone 

(510) 882-4369 - Cell 

 

Imagine, Inspire, Invest…Experience Oakland with Us! 

“You can discover more about a person in an hour of play than in a year of conversation.” - Plato.  

 

This message and all attachments are intended only for the recipient(s) listed above and may contain CONFIDENTIAL AND PRIVILEGED information.  If you have received this message in error, please destroy all electronic and paper copies and inform the sender.  Thank you.


From: Evan Schwartz <ESch...@warriors.com>
Sent: Monday, June 9, 2025 2:41 PM
To: Williams, Quincy <QWil...@oaklandca.gov>; Westbrook, Terri <TWest...@oaklandca.gov>
Cc: mi...@creativesportsconcepts.com <mi...@creativesportsconcepts.com>; Xie, Wei <WX...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>; Chtaini, Mostafa, <MCht...@oaklandca.gov>
Subject: RE: Mosswood

 

Thank you, Quincy (and all). I will await further instructions on what is needed from the Warriors and Creative Sports end. We’re excited to get started so would love to keep this momentum!

 

Evan Schwartz

Senior Director, Golden State Community Foundation

Golden State

 

415.604.1892 (office)

goldenstate.com

Golden State Banner

 

 

From: Williams, Quincy <QWil...@oaklandca.gov>
Sent: Monday, June 9, 2025 12:20 PM
To: Westbrook, Terri <TWest...@oaklandca.gov>
Cc: Evan Schwartz <ESch...@warriors.com>; mi...@creativesportsconcepts.com; Xie, Wei <WX...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>; Chtaini, Mostafa, <MCht...@oaklandca.gov>
Subject: Fw: Mosswood

 

Hi Terri, I'm sure you are busy with your first day of summer camp. Good luck with that. There was a meeting today that included me, Fred Kelley, Evan, the Creative Sports Concept team, and the OPW Construction Management team. We had to discuss

Hi Terri,

 

I'm sure you are busy with your first day of summer camp. Good luck with that. There was a meeting today that included me, Fred Kelley, Evan, the Creative Sports Concept team, and the OPW Construction Management team. We had to discuss the following actions so that repaving Mosswood could proceed. Wei/Amber will respond with what is required on the city side (Purchase Order, payment, and other items). I have looped in Mo for a response, on his end. Once we receive a Notice to Proceed from Wei/Amber, repaving can begin. Evan and Mike will communicate with you to ensure that events scheduled for the site or courts aren't interrupted. Once the process starts (tentatively June 23, hopefully June 16), it will take approximately 4 weeks. It was mentioned that a July 11/Mosswood meltdown is upcoming. More to come.

 

Thanks,

 

Quincy Williams

Assistant Capital Improvement Project Coordinator

Parks, Recreation, and Youth Development

250 Frank H. Ogawa Plaza Suite 3330

Oakland, CA 94612

 


From: Williams, Quincy <QWil...@oaklandca.gov>
Sent: Thursday, June 5, 2025 3:05 PM
To: Xie, Wei <WX...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>
Cc: Kelley, Fred <FKe...@oaklandca.gov>; Tran, Paul <PTr...@oaklandca.gov>; Pon, Craig <cp...@oaklandca.gov>; Garland, Liam <LGar...@oaklandca.gov>
Subject: Re: Mosswood

 

Hi Wei,

 

Yep, Amber just pinged me. I've attached the signed contract for your review. I will review schedules and send a meeting invitation between the City, Creative Sports (Vendor for Mosswood resurfacing) and The Warriors Foundation.

 

Thanks,

 

Quincy Williams

Assistant Capital Improvement Project Coordinator

Parks, Recreation and Youth Development

250 Frank H. Ogawa Plaza Suite 3330

Oakland, CA 94612

 


From: Xie, Wei <WX...@oaklandca.gov>
Sent: Thursday, June 5, 2025 2:59 PM
To: Williams, Quincy <QWil...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>
Cc: Kelley, Fred <FKe...@oaklandca.gov>; Tran, Paul <PTr...@oaklandca.gov>; Pon, Craig <cp...@oaklandca.gov>; Garland, Liam <LGar...@oaklandca.gov>; Garland, Liam <LGar...@oaklandca.gov>
Subject: RE: Mosswood

 

Hi Quincy,

 

Amber will be contacting you to schedule a pre-construction meeting and proceed with the next steps. By the way, do you know if the contract has been fully executed? We’ll need the CPO and SPO in place before we can issue the NTP.

 

Thanks,

 

Wei Xie, P.E.

Supervising Civil Engineer, Construction Management Division

Bureau of Design & Construction

City of Oakland | Public Works Dept | APWA Accredited Agency

250 Frank H. Ogawa Plaza, Ste. 4314 | Oakland, CA  94612

Phone: (510) 238-3471 |Cell: (510) 852-3669| Fax: (510) 238-6633

WX...@oaklandca.gov

 

Report A Problem | Call OAK 311From outside Oakland: (510) 615-5566

311.oaklandca.gov | OAK...@oaklandnet.com | Mobile app: Apple or Android

 

 

From: Williams, Quincy <QWil...@oaklandca.gov>
Sent: Thursday, June 5, 2025 12:59 PM
To: Xie, Wei <WX...@oaklandca.gov>; Garland, Liam <LGar...@oaklandca.gov>
Cc: Kelley, Fred <FKe...@oaklandca.gov>; Tran, Paul <PTr...@oaklandca.gov>; Pon, Craig <cp...@oaklandca.gov>; Garland, Liam <LGar...@oaklandca.gov>
Subject: Re: Mosswood

 

Hi Liam and Wei,

 

I was hoping we could schedule a meeting on Mosswood sooner rather than later. This repaving project has been at least 3 years in the making. The Warriors Foundation, along with OPRYD and the community that uses Mosswood are anxious to have this project completed. I could look at schedules for the next 2 weeks and schedule a Teams meeting.

 

Thanks,

 

Quincy Williams

Assistant Capital Improvement Project Coordinator

Parks, Recreation and Youth Development

250 Frank H. Ogawa Plaza Suite 3330

Oakland, CA 94612

 


From: Garland, Liam <LGar...@oaklandca.gov>
Sent: Wednesday, June 4, 2025 12:51 PM
To: Williams, Quincy <QWil...@oaklandca.gov>
Cc: Aleem, Harith <HAl...@oaklandca.gov>; Kelley, Fred <FKe...@oaklandca.gov>; Tran, Paul <PTr...@oaklandca.gov>; Pon, Craig <cp...@oaklandca.gov>; Xie, Wei <WX...@oaklandca.gov>
Subject: RE: Mosswood

 

Hi Quincy, sounds good. Hoping we can schedule for early July. For OPW, please include me, Paul, and Craig. Thank you!

 

From: Williams, Quincy <QWil...@oaklandca.gov>
Sent: Wednesday, June 4, 2025 12:23 PM
To: Garland, Liam <LGar...@oaklandca.gov>
Cc: Aleem, Harith <HAl...@oaklandca.gov>; Kelley, Fred <FKe...@oaklandca.gov>; Tran, Paul <PTr...@oaklandca.gov>; Pon, Craig <cp...@oaklandca.gov>; Xie, Wei <WX...@oaklandca.gov>
Subject: Re: Mosswood

 

Hi Liam,

 

Thanks for the response. Let's schedule a meeting to discuss the process regarding future gift-in-place donations. I could send out a Teams invite if that works for you /others?

 

Thanks,

 

Quincy Williams

Assistant Capital Improvement Project Coordinator

Parks, Recreation, and Youth Development

250 Frank H. Ogawa Plaza Suite 3330

Oakland, CA 94612

 


From: Garland, Liam <LGar...@oaklandca.gov>
Sent: Wednesday, June 4, 2025 12:16 PM
To: Williams, Quincy <QWil...@oaklandca.gov>
Cc: Aleem, Harith <HAl...@oaklandca.gov>; Kelley, Fred <FKe...@oaklandca.gov>; Tran, Paul <PTr...@oaklandca.gov>; Pon, Craig <cp...@oaklandca.gov>; Xie, Wei <WX...@oaklandca.gov>
Subject: RE: Mosswood

 

Hi Quincy: let me know if this works. After quick discussions this morning, here’s where OPW is ready to land on this project. Amber from Paul’s team will lend some CM support to the project given she’s providing CM on the Mosswood project. Craig will lend what he can in terms of his team’s support, but given Hank’s departure, that probably won’t be much. (In normal circumstances, Hank would have been the go-between in implementing a gift-in-place donation via ballcourt resurfacing.) For future gift-in-place donations related to construction, I’d suggest an early heads up by email to Craig and Paul, with copies to me and Richard, and then we’ll get back to you with a proposed solution. If we can’t figure out a solution,  then we’ll escalate it up to Josh and Fred and figure it out from  there. Hope this helps and if it’s still worth a convo, let us know. Thanks! Liam

 

From: Xie, Wei <WX...@oaklandca.gov>
Sent: Wednesday, June 4, 2025 9:46 AM
To: Williams, Quincy <QWil...@oaklandca.gov>
Cc: Aleem, Harith <HAl...@oaklandca.gov>; Kelley, Fred <FKe...@oaklandca.gov>; Tran, Paul <PTr...@oaklandca.gov>; Garland, Liam <LGar...@oaklandca.gov>
Subject: RE: Mosswood

 

Looping in Paul and Liam on this discussion.

 

Wei Xie, P.E.

Supervising Civil Engineer, Construction Management Division

Bureau of Design & Construction

City of Oakland | Public Works Dept | APWA Accredited Agency

250 Frank H. Ogawa Plaza, Ste. 4314 | Oakland, CA  94612

Phone: (510) 238-3471 |Cell: (510) 852-3669| Fax: (510) 238-6633

WX...@oaklandca.gov

 

Report A Problem | Call OAK 311From outside Oakland: (510) 615-5566

311.oaklandca.gov | OAK...@oaklandnet.com | Mobile app: Apple or Android

 

 

From: Williams, Quincy <QWil...@oaklandca.gov>
Sent: Wednesday, June 4, 2025 9:44 AM
To: Xie, Wei <WX...@oaklandca.gov>
Cc: Aleem, Harith <HAl...@oaklandca.gov>; Kelley, Fred <FKe...@oaklandca.gov>
Subject: Re: Mosswood

 

Hi Wei,

 

I want to schedule a meeting with you and Director Kelley to discuss the process for involving the Bureau of Design and Construction in gift-in-place donations. Based on our conversation on Monday, I am concerned that if projects benefiting OPRYD (gift-in-place donations) require BDC personnel to be involved and paid for services, this may negatively impact how we receive and implement improvements. 

 

Thanks,

 

Quincy Williams

Assistant Capital Improvement Project Coordinator

Parks, Recreation and Youth Development

250 Frank H. Ogawa Plaza Suite 3330

Oakland, CA 94612

 


From: Xie, Wei <WX...@oaklandca.gov>
Sent: Wednesday, June 4, 2025 9:34 AM
To: Williams, Quincy <QWil...@oaklandca.gov>
Subject: RE: Mosswood

 

Hi Quincy,

 

Please hold off on initiating the contract. The attached outstanding concerns and issues need to be resolved before moving forward.

 

Thanks,

 

 

Wei Xie, P.E.

Supervising Civil Engineer, Construction Management Division

Bureau of Design & Construction

City of Oakland | Public Works Dept | APWA Accredited Agency

250 Frank H. Ogawa Plaza, Ste. 4314 | Oakland, CA  94612

Phone: (510) 238-3471 |Cell: (510) 852-3669| Fax: (510) 238-6633

WX...@oaklandca.gov

 

Report A Problem | Call OAK 311From outside Oakland: (510) 615-5566

311.oaklandca.gov | OAK...@oaklandnet.com | Mobile app: Apple or Android

 

 

From: Williams, Quincy <QWil...@oaklandca.gov>
Sent: Wednesday, June 4, 2025 9:31 AM
To: Evan Schwartz <ESch...@warriors.com>
Cc: Westbrook, Terri <TWest...@oaklandca.gov>; Xie, Wei <WX...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>; Armstrong, Cynthia L. <CArms...@oaklandca.gov>; Morris, Frederick <FMo...@oaklandca.gov>
Subject: Re: Mosswood

 

Hi Evan,

 

Would next week (Mon or Tuesday) work for Creative Sports? Also, who is the point person at Creative? I will send an invite to all on this email thread.

 

Thanks,

 

Quincy Williams

Assistant Capital Improvement Project Coordinator

Parks, Recreation and Youth Development

250 Frank H. Ogawa Plaza Suite 3330

Oakland, CA 94612

 


From: Evan Schwartz <ESch...@warriors.com>
Sent: Wednesday, June 4, 2025 9:25 AM
To: Williams, Quincy <QWil...@oaklandca.gov>
Cc: Westbrook, Terri <TWest...@oaklandca.gov>; Xie, Wei <WX...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>; Armstrong, Cynthia L. <CArms...@oaklandca.gov>; Morris, Frederick <FMo...@oaklandca.gov>
Subject: Re: Mosswood

 

They can make that work. Let me know what else you need and if we can get this kickoff call scheduled.

 

On Jun 3, 2025, at 2:32PM, Williams, Quincy <QWil...@oaklandca.gov> wrote:



Hi Evan, Can Creative Sports look at starting June 16th (after NTP is issued)? Thanks, Quincy Williams Assistant Capital Improvement Project Coordinator Parks, Recreation and Youth Development 250 Frank H. Ogawa Plaza Suite 3330 Oakland, CA

Hi Evan,

 

Can Creative Sports look at starting June 16th (after NTP is issued)?

 

Thanks,

 

Quincy Williams

Assistant Capital Improvement Project Coordinator

Parks, Recreation and Youth Development

250 Frank H. Ogawa Plaza Suite 3330

Oakland, CA 94612

 


From: Evan Schwartz <ESch...@warriors.com>
Sent: Tuesday, June 3, 2025 11:56 AM
To: Williams, Quincy <QWil...@oaklandca.gov>
Cc: Westbrook, Terri <TWest...@oaklandca.gov>; Xie, Wei <WX...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>
Subject: RE: Mosswood

 

Yes, apologies. Backboards, rims, and nets.

 

Evan Schwartz

Senior Director, Golden State Community Foundation

Golden State

 

415.604.1892 (office)

goldenstate.com

<image001.png>

 

 

From: Williams, Quincy <QWil...@oaklandca.gov>
Sent: Tuesday, June 3, 2025 11:45 AM
To: Evan Schwartz <ESch...@warriors.com>
Cc: Westbrook, Terri <TWest...@oaklandca.gov>; Xie, Wei <WX...@oaklandca.gov>; Kennedy, Amber <AKen...@oaklandca.gov>
Subject: Re: Mosswood

 

Hi Evan, Thanks for the email. Also, in the package it mentions: Replace basketball hoops and rims. So that means the Backboards and rims correct? Quincy Williams Assistant Capital Improvement Project Coordinator Parks, Recreation and Youth

Hi Evan,

 

Thanks for the email. Also, in the package it mentions:

 

Replace basketball hoops and rims.  So that means the Backboards and rims correct?

 

Quincy Williams

Assistant Capital Improvement Project Coordinator

Parks, Recreation and Youth Development

250 Frank H. Ogawa Plaza Suite 3330

Oakland, CA 94612

 


From: Evan Schwartz <ESch...@warriors.com>
Sent: Tuesday, June 3, 2025 11:37 AM
To: Williams, Quincy <QWil...@oaklandca.gov>
Cc: Westbrook, Terri <TWest...@oaklandca.gov>
Subject: RE: Mosswood

 

Hi Quincy,

 

I wanted to flag that the work schedule provided in the packaged agreement is slightly out of date. I’d like to propose the below revised schedule, but of course we understand this is fluid and dependent on approvals and other factors.

 

Task                                                               Completion Date

Repair cracks on court surface              June 30, 2025

Recoat and paint playing area                July 7, 2025

Repaint playing lines                                 July 14, 2025

Replace bench seating                             July 21, 2025

Replace basketball rims and nets         July 21, 2025

 

I also wanted to clarify that we did not include a line item for project management in the budget; what we submitted includes the cost of all labor by and materials from our contractor.

 

Please let me know any questions, and we look forward to scheduling the kickoff call with all needed parties.

 

Thanks much,

Evan

 

Evan Schwartz

Senior Director, Golden State Community Foundation

Golden State

 

415.604.1892 (office)

goldenstate.com

<image001.png>

 

 

From: Williams, Quincy <QWil...@oaklandca.gov>
Sent: Friday, May 30, 2025 1:41 PM
To: Evan Schwartz <ESch...@warriors.com>
Subject: Re: Mosswood

 

Thanks. Is what's in the contract the Design? Quincy Williams Assistant Capital Improvement Project Coordinator Parks, Recreation and Youth Development 250 Frank H. Ogawa Plaza Suite 3330 Oakland, CA 94612 From: Evan Schwartz <ESchwartz@warriors.com>

Thanks. Is what's in the contract the Design?

 

<image002.png>

 

Quincy Williams

Assistant Capital Improvement Project Coordinator

Parks, Recreation and Youth Development

250 Frank H. Ogawa Plaza Suite 3330

Oakland, CA 94612

 


From: Evan Schwartz <ESch...@warriors.com>
Sent: Friday, May 30, 2025 1:10 PM
To: Williams, Quincy <QWil...@oaklandca.gov>
Subject: RE: Mosswood

 

Thanks, Quincy. Answers below.

 

Evan Schwartz

Sr. Director, Philanthropy

Warriors Community Foundation

415.604.1892 (office)

<image003.png>

website | tickets | app | social | find us

7x NBA Champs | 1947 | 1956 | 1975 | 2015 | 2017 | 2018 | 2022

 

From: Williams, Quincy <QWil...@oaklandca.gov>
Sent: Friday, May 30, 2025 12:57 PM
To: Evan Schwartz <ESch...@warriors.com>
Subject: Mosswood

 

Hi Evan, I am having an internal meeting with colleagues to discuss this project next Tuesday. Could you answer some of the following questions for me? Are there any constraints associated with this contract, such as funding deadlines or specific

Hi Evan,

 

I am having an internal meeting with colleagues to discuss this project next Tuesday. Could you answer some of the following questions for me?

 

  • Are there any constraints associated with this contract, such as funding deadlines or specific requirements tied to the funding? Not that I am aware of, beyond the logo inclusion on the approved court design.

 

  • Is the vendor (Creative Sports) responsible for preparing shop drawing submittals (design) and completing the construction accordingly? Warriors are leading the design aspect, Creative Sports will complete the construction.

 

Thanks,

 

Quincy Williams

Assistant Capital Improvement Project Coordinator

Parks, Recreation and Youth Development

250 Frank H. Ogawa Plaza Suite 3330

Oakland, CA 94612

 

 

NTP _ Mosswood Basketball Court Resurfacing _ Preliminary Copy.pdf

William Manley

unread,
Jun 13, 2025, 6:23:02 PMJun 13
to mosswood...@googlegroups.com
Congratulations


--
You received this message because you are subscribed to the Google Groups "Mosswood-Park RAC" group.
To unsubscribe from this group and stop receiving emails from it, send an email to mosswood-park-...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/mosswood-park-rac/PH8PR09MB9166503162F85A9B9CA68F71D077A%40PH8PR09MB9166.namprd09.prod.outlook.com.
Reply all
Reply to author
Forward
0 new messages