NiGhTMaRe
unread,Jan 30, 2012, 7:56:50 AM1/30/12Sign in to reply to author
Sign in to forward
You do not have permission to delete messages in this group
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to mogile
Hey their,
I have a MogileFS system with 2 trackers and 12 content nodes (total:
90700 GB). I want to drain some old servers (e.g. dev4: 348.914 GB) to
my new servers.
Rebalance Policy is no problem, but network load of my trackers is
really high during a rebalance (Tracker1: 1 Gbit/s Port, Tracker 2:
100 Mbit/s Port).
So my website is really slow or temporaly not available during a
rebalance.
My idea was to decrease my worker/rebalance jobs, to get a lower load,
but I'm not sure if this is the right way.
Does anyone have an idea, how I rebalance/drain my old contentservers
slowly with low load?