Welcome to the Internet Job Locator
http://www.joblocator.com/
______________________________________________________
Resume # : 15196
Header : Offshore Structural Engineer(Oil/Gas)
Date : October 31 1997
Name : Khaled Sherif
Address : 1, Hafez Ramadan St.- Ste. 52
Naser City, Cairo 11759
Country : Egypt
Phone # : +(202)271-7144 Fax # :
Email : sher...@soficom.com.eg
Resume
===================================
Curriculum Vitae of Khaled Sherif
===================================
As of: November, 1997
PERSONAL DATA
-------------
Name: Khaled A. Sherif
Date of birth: July 20, 1959.
Marital status: Married.
Nationality: Egyptian.
Languages: Fluent in Arabic and English, beginner's level in French, basics in Italian.
Address (Home): 1, Hafez Ramadan St., Suite 52
Nasr City, 6th Region, Postcode 11759,
Cairo, Egypt.
Phone No. (Evening): +(202) 271-7144.
E-mail: sher...@soficom.com.eg
EDUCATION
---------
- B.Sc.: Structural engineering (with honor) from Ain Shams University, Cairo, Egypt, 1982.
- Post graduate: Courses in structural engineering at Ain Shams University, Cairo, Egypt, 1985.
- Post graduate: Fellowship in structural engineering at Rice University, Houston, Texas, 1987.
REGISTRATION & MEMBERSHIP
-------------------------
- Member, Engineering Egyptian Syndicate -- since 1982.
- Member, American Concrete Institute (ACI); 1988-1991.
- Associate member, American Society Of Civil Engineers (ASCE); 1991-1996.
- Member, American Society Of Civil Engineers (ASCE) -- since 1996.
- Member, American Society Of Civil Engineers - Egypt Section (ASCE-EGS) -- since 1996.
SUMMARY OF EXPERIENCE
---------------------
Experienced for 15 years in engineering management, structural engineering, engineering supervision and computer software applications. Directly involved for more than 13 years in OIL & GAS offshore and onshore industry. Practiced for 2 years in structural engineering of residential and industrial projects.
Experience includes:
- Managing of engineering projects for last 3 years according to procedures comply with ISO 9001
- Internal auditing of environmental management system (EMS) in accordance with ISO 14001.
- Supervising and performing static, dynamic and fatigue computer analysis of offshore structures for over 11 years.
- Developing of engineering guides for installation of offshore structures.
- Reviewing and performing structural steel analysis, design and detailing for over 11 years.
- Reviewing and performing structural concrete analysis, design and detailing for over 6 years.
- Conducting reports and proposals for last 6 years.
- Responsibility for issuing material requisitions and vendor negotiation up to USD 100,000.
- Sum-up of 4 months of training and supervising for engineers and designers in engineering and drafting of structural onshore and offshore oil/gas projects.
- Supporting cost engineers and estimators for last 4 years.
- Supervising and participating in building and foundation construction for a sum-up of 1 year.
- Utilizing of numerous software since 1984.
- Satisfactory experience with communication software and operating systems including DOS, UNIX and Windows.
- Over 300 hours of searching and using the Internet -- begun in 1996.
DETAILED EXPERIENCE
-------------------
++ Employer: Engineering For Petroleum & Process Industries, ENPPI (July 1991 to date)
++ Job title: Lead Civil Engineer
Responsible for management, supervision, software troubleshooting, cost estimate, scheduling and overall review of conceptual and detailed design of oil/gas projects. Work included:
* BRITISH GAS INTERNATIONAL, ROSETTA OFFSHORE FIELD DEVELOPMENT (1997).
Project Engineering Leader: Responsible for leading a multi-disciplinary task group to review conceptual design and conduct basic engineering for 365 MMSCFD gas development. Project comprises offshore platform at 56 m water depth in the Mediterranean, 75 km offshore pipeline, 35 km onshore pipeline and onshore terminal.
* ENPPI, ENVIRONMENTAL MANAGEMENT SYSTEM (1997).
Task Force Leader: Responsible for qualifying company's headquarters activities to comply with the requirements of ISO 14001. Determined environmental aspects, significant impacts and prepared an environmental program for company's implementation.
* KHALDA (REPSOL), WESTERN DESERT GAS PROJECT (1996).
Technical Leader: Reviewed civil and structural scope of Front End Engineering & Design (FEED). The project aims to develop a gas field of estimated 470 BCF of associated gas and connect it to the Egyptian gas network. The FEED executed by ABB Lummus Global, Ltd.
* ENPPI, UTILIZATION OF Que$tor COMPUTER SOFTWARE (1996).
Special assignment: Acquainted and assisted company's cost estimators to utilize the computer software Que$tor. This software developed by MAI Consultants Limited, Surrey, England. Que$tor is used during evaluation stage to cost estimate, schedule, provide investment profiles and economic analysis of new offshore oil and gas developments.
* ENPPI, HEADQUARTERS EXTENSION (1995-1997).
Deputy Project Manager: Responsible for project management and technical coordination between different engineering disciplines to design, procure and construct extension to company's existing office building. The project worth USD 3.5 million.
* SUCO (BP/ SHELL/ DEMINIX), COIL TUBING OPERATION/ DYNAMIC RESPONSE ANALYSIS (1995).
Project Manager and Structural Leader: Performed dynamic analysis for RAS BADRAN C offshore platform. Conducted deterministic dynamic response due to sea waves and currents to check the platform during a temporary coil tubing operation. Assignment included all project management role. This platform located at the Gulf Of Suez, Egypt, at water depth of 43 m.
* BAPETCO (SHELL), GEMSA OFFSHORE FIELD/ PHASE II DEVELOPMENT (1995).
Structural Leader: Responsible for civil scope of basic engineering to increase oil production of GEMSA SE-4 & 5 offshore existing platform. Supervised stability study of new 6 -- 8 km power fluid offshore pipeline. Performed structural inplace analysis to qualify the platform for extra loads on deck. The platform located at the Gulf Of Suez, Egypt, at water depth of 19 m.
* OSOCO (TOTAL), VISUAL INSPECTION OF GAMMA-A OFFSHORE PLATFORM (1995).
Structural Leader: Responsible for general visual inspection of the above water and splash zone parts of GAMMA-A offshore platform. Evaluated the structure's current status and proposed the required future surveys and inspections.
* PETROBEL (AGIP), REPAIR OF BELAYIM OFFSHORE INSTALLATIONS, PHASE III (1994-1995).
Structural Leader: Assignment included performing and supervising complete static and fatigue inplace analyses of one offshore cluster (CLUSTER 35) and one wellhead template (DWT 113M9). Precisely, performed and supervised the analyses to design a 25-year inspection, repair and maintenance (IRM) plan. These structures located at the Gulf Of Suez at water depth of 19 m. Work executed at TECNOMARE's offices in Venice, Italy.
* GUPCO (AMOCO), BRACING CAISSON FOR MORGAN M6 OFFSHORE PLATFORM (1994).
Project Manager and Technical Leader: Responsible for engineering project to upgrade MORGAN M6 offshore platform by adding new production conductors. Generated and analyzed 5 different SACS computer models to select the most convenient upgrading configuration. Platform located at water depth of 75 ft -- Gulf Of Suez, Egypt.
* ENPPI, ENGINEERING GUIDES FOR INSTALLATION OF OFFSHORE STRUCTURES (1993).
Four-month special task: Developed company's engineering guides for installation of offshore structures. Guides covered load out, transportation, launching, floatation and upending of offshore structures. Prepared and reported SACS computer-related samples for guidance.
* GUPCO (AMOCO), RAS SHUKHIER PROCESS CRUDE COOLING (1991-1993).
Technical Leader: Responsible for all civil and structural engineering activities. Performed design and analysis of eight-leg pump coastal platform. Project located offshore Ras Shukhier, Egypt.
* GUPCO (AMOCO), MODIFICATION TO OCTOBER H OFFSHORE PLATFORM (1992).
Structural Leader: Responsible for design, and installation of new helideck and utilities over an existing offshore deck.
* GUPCO (AMOCO), SEWAGE TREATMENT FOR GOS OFFSHORE PLATFORMS (1992).
Structural Leader: Responsible for basic design and structural modifications of 15 offshore platforms to accommodate new sewage treatment units. Platforms located at water depths range up to 60 m at the Gulf Of Suez, Egypt.
* PETROBEL (AGIP), REPAIR OF BELAYIM OFFSHORE INSTALLATIONS, PHASE II (1991-1992).
Structural Leader: Responsible for implementing a 15-year inspection, repair and maintenance (IRM) plan for five (5) offshore platforms. These platforms located at Gulf Of Suez, Egypt. Work executed at TECNOMARE's offices in Venice, Italy.
* EGPC/ GUPCO (AMOCO), TRANSGULF OFFSHORE PLATFORM (1991).
Structural Leader: Performed conceptual analysis of four-leg fixed offshore jacket. Accomplished a techno-economical study based on locating the jacket in two different soils with two proposed configurations regarding change in jacket weight and pile size. Jacket located at water depth of 60 m -- Gulf Of Suez, Egypt
++ Employer: Engineering For Petroleum & Process Industries, ENPPI (Jan. 1984 -- July 1991)
++ Job title: Civil Engineer
Responsible for design, computer analysis and drawing checking of structural onshore and offshore oil/gas projects. Work included:
* GEISUM, WP-B OFFSHORE PLATFORM (1990-1991).
Participated in performing detailed structural, fatigue, dynamic analysis and design of three-leg platform. This platform located at water depth of 5 m -- Gulf Of Suez, Egypt
* BAPETCO (SHELL), PLATFORM FOR WELLS SE-4 AND SE-5 (1990-1991).
Participated in performing detailed structural analysis and design of three-leg offshore platform. Five existing conductors at water depth of 19 m required to carry a new equipment deck. Successfully, suggested a half-height jacket to reduce conductors buckling length and secure easy installation. Platform located at Gulf Of Suez, Egypt.
* WEPCO, NAQ P1 P/U OFFSHORE TOPSIDES (1990-1991).
Participated in performing detailed structural analysis, design and weight monitoring of 1500 tones, six-leg equipped deck. Also, reviewed fabrication, load out and installation procedures submitted by contractors.
* PETROBEL (AGIP), REPAIR OF BELAYIM OFFSHORE INSTALLATIONS, PHASE I (1989).
Participated in engineered repair of twelve (12) fixed offshore platforms. Efficiently defined the inspection, repair and maintenance (IRM) core criterion for these platforms. This criterion was further enhanced and applied on other 28 platforms in phase II and III of the project. Project located at Belayim field -- Gulf Of Suez, Egypt. Engineering work executed at TECNOMARE's offices in Venice, Italy.
* WEPCO, NAQ P1 P/U OFFSHORE PLATFORM (1989).
Participated in conceptual structural design of six-leg offshore platform. Scope included complete analysis of 500 tones jacket, 1500 tones equipped deck, 45 m vent boom, and 42 m connecting bridge. Project located at water depth of 35 m -- 24 km offshore Abu Qir, Egypt.
* BAPETCO (SHELL), BED3 INTEGRATED DEVELOPMENT (1989).
Established the design criteria for the foundation design of complete process area complying with British Standard BS 8110. Developed a computerized spread sheet to analyze the foundation according to these criteria utilizing LOTUS 123.
* ENPPI, HOUSING COMPLEX AT MOKATUM (1989).
Performed structural design of residential complex to accommodate 70 families. Project located at Mokatum, Egypt.
* WEPCO P3 WELLHEAD OFFSHORE PLATFORM (1989).
Participated in conceptual and detailed structural design of fixed offshore four-leg platform. Project located at water depth of 19 m offshore Abu Qir, Egypt.
* EGPC, SINAI LPG BERTH (1989).
Participated in detailed design of 6 and 8 - 6 km subsea pipelines. Conducted a study for near shore wave refraction and performed on-bottom stability of the line.
* GEISUM, OFFSHORE OIL FIELD DEVELOPMENT (1988).
Participated in conceptual design and MTO estimate of four-leg fixed offshore template at the Gulf Of Suez, Egypt.
* ASORC, ASSUIT REFINERY (1984-1987).
Participated in design and checking of equipment foundation of petrochemical refinery. Equipment covered fractionator tower 40 m height, flare stack 45 m height, petrochemical columns, heat exchangers, boilers, generators, compressors, etc. Besides, checked structural design of administration building, steel warehouse, control room, fire station, steel warehouse, steel car shed and precast concrete units.
* ASORC, HOUSING COMPLEX (1985-1986).
Designed and checked residential buildings, motels, swimming pool, diving board and concrete sheds. Also, supervised construction of foundation and buildings' concrete skeleton for five months. Project located nearby Assuit Refinery and planned to accommodate 1500 persons.
* A.P.C /KAWASAKI, HEXANE UNIT (1985).
Participated in design and checking for foundation of petrochemical unit of 20,000 T/Y capacity and building area. Project located in Alexandria, Egypt.
* A.P.C /TOYO CHLORINE-CAUSTIC SODA PROJECT (1984).
Participated in detailed design and checking of foundation of petrochemical unit. Project located in Alexandria, Egypt.
++ Employer: DR. ALY SABRY CONSULTING FIRM (Jan. 1983 -- Jan. 1984)
++ Job title: Structural Engineer
Responsible for civil and structural design of concrete buildings, deep and shallow foundations. Work included:
* EASTERN TOBACCO CO., NEW OFFICE BUILDING (1983 -- 1984).
Designed and detailed five-story concrete office building in Giza, Egypt.
* EL ZAHRA TOWER (1983).
Designed repairs for foundation and superstructure of 18-story concrete Tower. This building experienced unexpected soil settlement.
* EXECUTIVE ORGANIZATION FOR CAIRO REHABILITATION (1983).
Performed site survey and leveling measurements for 50,000 sq. meter desert land.
* SAUDI MINISTRY OF MUNICIPAL AND RURAL AFFAIRS/ C.C.C. (1983).
Reviewed and detailed structural basic design of three 100,000 cu. meter water ground tanks. Design conformed to BS 5337. Project located in Koba, Kingdom Of Saudi Arabia.
++ Employer:DR. SHAKER ELBEHAIRY CONSULTING OFFICE (1982).
++ Job title:Structural Engineer
Responsible for design and supervision of structural projects. Work included:
* HELWAN TRADING CO., NEW OFFICE BUILDING (1982).
Designed and detailed foundation and concrete skeleton of four-story office building. Conducted a smart structural design to transmit loads of 12-column typical floor to 4 columns at ground and basement levels.
* NATIONAL DEVELOPMENT BANK (1982).
Designed and detailed strengthening for columns and foundations of existing concrete building to carry extra live loads. Project located in Roxy, Cairo, Egypt.
* TENTH OF RAMADAN EX FIGHTERS SOCIETY (1982).
Analyzed and designed shear walls and mat foundation for 30-story multipurpose concrete building.
COMPUTER SOFTWARE UTILIZATION
-----------------------------
Skilled in utilizing the following software:
OFFSHORE STRUCTURAL SOFTWARE PACKAGES:
* OCEANS (The Offshore Civil Engineering ANalysis System).
A computer software package developed by Brown and Root USA, Inc. to analyze and design marine structures. Utilized the following OCEANS modules:
- DAMS (Design and Analysis of Marine Structure): Program tailored to analyze and design offshore structures according to API or DNV codes.
- PLANS: Program to analyze coupled structure/foundation interaction of offshore structures.
- PILE 80: Program to analyze and design single pile for offshore structures.
- JAMS (Joint Analysis of Marine Structures): Program to analyze tubular joint for marine structure according to API or DNV codes.
- FLAP (Flotation and Launch Analysis Parameters): Program to study the flotation and launching for offshore structures and barge motions.
* SACS (Structural Analysis Computer System):
A computer software package to general structural analysis and design of offshore structures. Developed by Engineering Dynamics Inc. (EDI), Kenner, Louisiana. Proficient in using the following modules:
- SIMPL: An interactive model and input data generator.
- PRECEDE: A mouse-driven graphical model and input data generator.
- SEASTATE: A program to generate static and dynamic loads due to wind, current, waves, gravity and mudslide.
- SACS IV: A static FEA solver program. Also performs code checking, automatic redesign and hydrostatic collapse analysis.
- PSI: A program to analyze pile/structure/soil nonlinear behavior.
- JOINT CAN: A program to analyze and redesign tubular joint connections.
- REVIEW / POSTVUE: Graphical post processor for static and dynamic analyses.
- DYNPAC: Determines structural dynamic characteristics of structures.
- EARTHQUAKE: Analyzes the steady state response of the structure due to earthquake excitation.
- FATIGUE: Performs deterministic or spectral fatigue analysis and redesigns connections to satisfy code requirements.
- WAVE RESPONSE: Calculates deterministic or spectral dynamic steady state response due to sea waves and currents.
- SACSTOW: A program to calculate forces on the structure during towing.
- FLOTATION: Calculates the equilibrium positions of the floating structure during upending and sitting down.
- LAUNCH: Calculates the structural loads and jacket/barge positions during all phases of launching operation.
- COMBINE: Forms linear combinations of multiple static or dynamic responses.
- GAP: Nonlinear analysis with one way elements for simulation of load out and similar type of analysis.
- MTO: Material take-off, weight control and cost estimator.
- SACSCAD/ PRECAD: Assisted drafting programs linked to AutoCAD.
- SACS 3D: Three dimensional model plotting and finite element generator linked to AutoCAD.
* TECNOMARE S.p.A, Offshore Structural Computer Package:
Utilized the following computer modules for 8 months during execution of engineering project with TECNOMARE (Società per lo Sviluppo delle Tecnologie Marine) in Venice, Italy (1994-1995).
- CARGON: A program to calculate oceanographic forces due to wave, current, wind, and inertial forces on fixed and floating offshore framed structures.
- Msc/NASTRAN: A large scale FEA solver for static and dynamic structural analysis. This program is an enhanced version of NASTRAN (a registered trade mark of the National Aeronautics and Space Administration, NASA).
- NAISC3: A program to check member stress in accordance with AISC and API standards.
- PUNCH: A program to check punching shear of tubular nodes according to API and DNV standards.
- PZPALO: Computes the vertical axial behavior of a single foundation pile as a function of pile geometrical characteristics and soil T-Z curves.
- ANPALO: Computes the lateral behavior of a single foundation pile and identifies its equivalent stiffness matrix to be utilized for analysis of the upper structure.
- SEISUT: A program to evaluate the masses of the marine growth on a jacket structure.
- SEISMA: A utility program to evaluate the added masses on offshore structures to be used in seismic and fatigue analysis.
- POSCAR: A program for linearization of hydrodynamic loads through fitting sinusoids.
- FASTAN: A program to evaluate the response amplitude operator (RAO) of stress ranges and assessing of damage and fatigue life of tubular nodes.
* OFFSHORE PIPELINE SOFTWARE:
Offshore pipeline computer package PLUS-ONE developed by Andrew Palmer And Associates Limited. Practiced the following modules:
- STAB: To calculate the required concrete coating or wall thickness to ensure on-bottom stability.
- LAYS: To calculate stress on pipeline during conventional pipe lay.
- SPAN: To calculate the allowable free span of pipeline.
* ONSHORE STRUCTURAL SOFTWARE PACKAGES:
- STAAD III (STructural Analysis And Design):
A program to analyze and design general structural systems (concrete, steel and timber) according to different international standards. Developed by Research Engineers, Inc.
- ETABS (Extended Three Dimensional Analysis of Building Systems):
A program to analyze and design general concrete building systems. Developed by Computers and Structures, Inc.
- ADAPT (Advanced Design and Analysis of Post-Tensioning)
A program to analyze post-tensioning concrete beams and slabs. Developed by Bijan, Florian & Assoc., Inc.
- SPREAD SHEETS SOFTWARE:
MS EXCEL FOR WINDOWS, QUATRO PRO, LOTUS SYMPHONY, LOTUS 123.
* CAD AND GRAPHICS SOFTWARE:
AutoCAD, HARVARD GRAPHICS.
* WORD PROCESSING SOFTWARE:
MS WORD FOR WINDOWS, MS WINDOWS WRITE, PROFESSIONAL WRITE.
* INTERNET AND COMMUNICATION SOFTWARE:
CHEYENNE BitWare, TRUMPET WINSOCK, Eudora Light for Windows, WS_FTP, Netscape Navigator for Windows.
COMPUTER PROGRAMMING
--------------------
Capable of programming on IBM PC Series in BASIC language. Designed and wrote the following programs:
- Program to analyze plane frames using the stiffness method -- developed in 1986.
- Program to check punching shear behavior of tubular joints for offshore structures according to API (RP2A) -- developed in 1988.
- Program to design and check isolated single column footings according to the Egyptian Standards -- developed in 1986.
TRAINING
--------
Attended the following on-the-job training, courses and seminars
* Environmental Management Systems -- Auditor Training -- 1997. Two-day seminar and workshop to emphasize EMS auditing with references to ISO 14001 and environmental impact analysis techniques. Conducted by EXCEL PARTNERSHIP at ENPPI's headquarters -- Cairo, Egypt.
* Effective Meetings -- 1997. Eight-hour intensive course to effectively plan, conduct and manage successful meetings. Conducted by the British Council -- Cairo, Egypt.
* Develop Selling Skills -- 1997. Thirty-hour night course designed for salespersons to empower their knowledge, behavior and communication skills to achieve successful sales. Conducted by Marketing & Advertising Research Center MARC -- Cairo, Egypt.
* Planning And Delegating -- 1996. Eight-hour intensive course to enhance making plans, setting goals and priorities, scheduling and managing by delegation. Conducted by the British Council -- Cairo, Egypt.
* Effective Negotiation Skills -- 1996. Eight-hour intensive course to learn how to manage a win-win negotiation. Conducted by the British Council -- Cairo, Egypt.
* ENPPI's Management Policy And Procedures -- 1995. Twenty-hour night sessions to acquaint technical personnel with the managerial aspects to be followed by project managers. Conducted by ENPPI -- Cairo, Egypt.
* Success With Presentations -- 1995. Sixteen-hour intensive course intended to develop basic skills to deliver a successful presentation. Conducted by the British Council -- Cairo, Egypt.
* Offshore Environmental Studies And Coastal Engineering -- 1992. Forty-hour lectures and sessions conducted by TELCONSULT -- Cairo, Egypt.
* Using And Utilizing The Computer Software Package SACS -- 1989. Two-week intensive training sessions organized by Engineering Dynamics Inc. (EDI), U.S.A. Training was held at ENPPI's headquarters in Cairo, Egypt.
* Design and analysis of post tensioned precast concrete multi-story garages -- 1987-1988. Five-week training course at Walter P. Moore And Associates - Houston, Texas (one of the top 500 American design firms -- ENR 1986). Training included organization, work procedures and technical applications. Also, the training program included several site visits in Houston city.
* Process, Start-up and Operation of Oil Refineries --1987. Two-week on site orientation and training at Assuit Refinery -- Assuit, Egypt
* Structural Analysis And Design Of Fixed Offshore Platforms -- 1986. Five-month intensive training program included complete analysis and design of an existing 8-leg platform at the Gulf Of Mexico at water depth 280 feet. Also, it included site visits to fabrication yards, installation and piling of offshore platform at the Gulf Of Mexico. Conducted by Brown and Root USA, Inc. -- Houston, Texas.
* Installation Of Fixed Offshore Platforms -- 1986. Four-week field offshore training. Period included installation of jacket, piles, and deck of platform (D) at Zeit Bay. A four-pile platform at water depth of 17 m, designed jointly by McDermott, Inc. and Bechtel Great Britain and installed by Petrojet. Conducted by Suez Oil Company (SUCO) -- Gulf Of Suez, Egypt.
* Programming by FORTRAN 77 -- 1984. Two-month night courses at Central Agency For Public Mobilization And Statistics (CAPMAS) -- Cairo, Egypt.
* Construction Of Bored Piles With Soil Injection -- 1980. Ten-week field training at site of Baher Tower , a multipurpose 38-story concrete building located at Giza, Egypt. Conducted by Bauer Egypt Inc. -- Cairo, Egypt.
CODES & STANDARDS
-----------------
Proficiency in using the following codes and standards:
- API (RP2A-WSD): Recommended practice for planning, designing and constructing fixed offshore platforms.
- API (RP2A-LRFD): Recommended practice for planning, designing and constructing fixed offshore platforms.
- API (RP2L): Recommended practice for planning, designing and constructing heliports of fixed offshore platforms.
- API Spec. 5L: Specification for line pipe.
- API (RP2P): Analysis of spread mooring systems for floating drilling units.
- API Spec. 2F: Specification for mooring chain.
- API Spec. 9A: Specification for wire rope.
- API Spec. 2c: Specification for offshore cranes.
- AISC/ASD: Specification for the design, fabrication and erection of structural steel for buildings.
- AISC/LRFD: Specification for the design, fabrication and erection of structural steel for buildings.
- ANSI /ASCE 7-94: Minimum design loads for buildings and other structures.
- ACI (318-95): Building code requirements for reinforced concrete.
- ASCE 7-92: Guide to the use of the wind load provisions.
- BS 8110: Structural use of concrete.
- BS 5337 (Formerly CP 2007): Code of practice for the structural use of concrete for retaining aqueous liquids.
- ISO 14001: Environmental management system -- Specification with guidance for use.
- ISO 14004: Environmental management system -- General guidelines on principles, systems and supporting techniques.
- ISO 14010: Guidelines for environmental auditing -- Audit procedures -- Auditing of environmental management systems.
- ISO 14012: Guidelines for environmental auditing -- Qualification criteria for environmental auditors..
AWARDS & FELLOWSHIPS
--------------------
Achieved the following:
- Merit Award In Science And Technology -- 1988. Sponsored by Dar Eltahrir For Publishing And Printing -- Cairo, Egypt.
- Peace Fellowship -- 1987. Sponsored by the American and Egyptian governments to study in the U.S.A. for five months.
.... end of resume ....
____________________________________________________________________________