Hi Barb,
Feel free to pass this along:
I called VDOT last week to find out what was happening with the slurry seal resurfacing that was supposed to be done in April. The VDOT Project Manager said the program actually is scheduled to begin in mid-August, and wil probably be done in Mill Creek in early to mid-September, depending on the weather.
I have found calling VDOT is usually a very satisfactory experience.
Enjoy,
Larry