Google Groups no longer supports new Usenet posts or subscriptions. Historical content remains viewable.
Dismiss

PJGRID.OCX crashing some of my IE6(SP1) on XP(SP1)

2 views
Skip to first unread message

Chris Attard (MALTA EU)

unread,
Mar 17, 2004, 4:46:37 AM3/17/04
to
I am receiving and IE crash when I try loading a Gannt
Chart on about half of my 6 PCs trying to access teh
website controls.

This error happens on PCs with latest updates applied to
them through windows-update.I tried hard to find some
pattern to why certain PCs have their IE crash and prompt
to send an error report (which I sent a couple of times)
when trying to load a Gannt Chart (hence using
pjgrid.ocx). The objects used have been reinstalled
repeatedly from the same source as for the ones which are
working fine, uselessly. I tried to reinstall the latest
SP for IE6 but even though I modify the suggested
registry key to reinstall it, it still does not
reinstall! HELP!!!

Please copy my email when replying!

Thanks!

Chris

ZeroG

unread,
Mar 31, 2004, 10:21:42 AM3/31/04
to
I have resolved this by removing the google toolbar. The other option
that could cause this error is a spanish language pack (which has
puzzled us for some time too).

pomoxp

unread,
Sep 29, 2004, 12:35:29 PM9/29/04
to

ZeroG wrote:
> *I have resolved this by removing the google toolbar. The other
> > *


Thank you very much.
For me it was Google Toolbar that was the reason of the crash.

--
pomoxp
------------------------------------------------------------------------
Posted via http://www.mcse.ms
------------------------------------------------------------------------
View this thread: http://www.mcse.ms/message553299.html

0 new messages